江口洞 的英文怎麼說

中文拼音 [jiāngkǒudòng]
江口洞 英文
kanggu dong
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 江口 : eguchi
  1. The duration from the occurrence of penetrating chinks to dyke breaches depends on the composition and cross - sectional size of the dyke body, and the river water level

    從發生貫穿性漏到潰的時間與堤身組成物、堤身斷面大小、水位高低有關。
  2. This a nimal could not be found in the branches flowing into dongting lake now

    豚在庭湖的分佈范圍主要集中在從城陵磯到鯰魚一帶,其種群數量大致為100 150頭。
  3. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊裁彎后,三(松滋、太平、藕池)分流分沙減少,下荊徑流量和輸沙量相應增加,庭湖泥沙淤積減少; 80年代中期以後,長中游幹流及庭湖出的年輸沙量呈減少趨勢,城陵磯至武漢河段河床由淤積轉為趨向沖淤平衡;三峽工程初期蓄水運用后,長中游含沙量沿程恢復距離較長,但床沙質部分恢復距離相對較短。
  4. This paper describes unique succession of calcareous tempestite from the early cambrian qingxudong formation, northeastern guizhou province

    摘要在黔東北銅仁地區下寒武統清虛組下部發育一套特徵典型、序列特殊的鈣質風暴巖。
  5. Surface, the easliy wear and tear parts use grinding - resistant material, extruding part use variable cylinder diamethe extruder with compact structuures, transmission gear with hard gear ter detachable pitch, great extruding p0ressure, high vacuum degree, low loading capacity ( electricity - saving more than 25 % than the same product ). it reaches advanced domestic level andcan replace imported items. it is suitable to produce hollow brick with high hole ratio, coal waste rock hollow bricks, shale hollow bricks, prower coal ash hollow - bricks. the extruder won the scienttific and technological progress pride of the lst building material scientific and techniques achievement exhibition in jiangsu province and the golden prize of the mational brick and tile energy - saving lxln achievement

    該機結構緊湊、傳動齒輪均系硬齒面,易損件採用耐磨材料、擠出部分採用變缸徑、變螺距、擠出壓力大、真空度高,裝機容量低(比同類產品節電25 % ) ,性能優于進同類設備,適用生產高孔率空心砌塊、煤矸石、頁巖、精煤灰空心磚及各類高摻入量粉煤灰磚和低塑性原料磚,該機在蘇省首屆建材科技成果展覽會科技進步獎; 94全國磚瓦節能四新成果展覽會金獎,西安國際博覽會金獎。
  6. Ecological studies on the protozoans at the dongting lake outlet of the changjiang river

    庭湖原生動物的生態學研究
  7. This thesis discussed the design principia and desige method from the engineering point of view., and give out its own view about the selection of development of the hydropower station, layout of the underground cavern mass, selection of method for stability analysis on the surrounding rocks and support, and design of the rock anchorage crane beam. some conclusions assumed from the research and design of jiangkou power house is quite useful for all the underground hydropower station

    本文結合電站,從工程的角度對地下廠房的設計原則、設計重點進行了詳細論述,對電站開發方式的選擇,地下室群的布置特點,圍巖的穩定性分析及支護方式選擇以及巖錨吊車梁的設計方法進行了研究和論證。本文的觀點和結論對地下廠房工程設計有著一定的普遍意義。
分享友人