污水排放管 的英文怎麼說

中文拼音 [shuǐbèifàngguǎn]
污水排放管 英文
effluent discharge pipe
  • : Ⅰ名詞(臟水; 臟物) slops; sewage; dirt; filth Ⅱ動詞(弄臟) defile; dirty; smear Ⅲ形容詞1 (臟)...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 排構詞成分。
  • : releaseset freelet go
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 污水 : sewage; slops; effluent; drainage; foul water; polluted water; waste water
  • 排放 : discharge; blowoff; blowdown; issue; volley; emission; sluice; bleed
  1. Plastics. un - plasticized pvc parts dor piping. simple assemblies with sealing rings for domestic water drainage piping. end use test. specification

    塑料製品.未增塑聚氯乙烯道零件.生活污水排放管道用帶密封圈的簡易組件.最終使用試驗.規范
  2. Discharge into water control zones

    制區事宜
  3. Saint - gobain canalisation, the pipe network branch of the saint - gobain group, is the worlds leading manufacturer and exporter of ductile iron pipeline systems. saint - gobain canalisation manufactures 1. 7 million tons of ductile iron pipes, laid 15, 000km of pamtm pipeslines worldwide every year. more than 115 countries, 1000 cities round the world, approximately 100 of which are capitals, are equiped with saint - gobain pamtm pipeline systems which include pipes, fittings, valves, fire hydrants etc

    聖戈班穆松橋在全球擁有20多家分公司,年產球墨鑄鐵170多萬噸,每年向用戶交付15000多公里長的道系統,其生產的球墨鑄鐵件閥門消防栓雨球墨鑄鐵道等產品均處於世界領先地位,並在115個國家的100多個首都以及1000多個城市廣泛運用。
  4. Moving downstream with animal feces in storm water runoff or with human waste in sewage overflows and septic - tank leaks, the waterborne microbes can cause liver disease, respiratory infections and potentially fatal gastrointestinal disorders

    不論是隨著暴雨逕流而來的動物糞便,或是污水排放管、化糞池滲濾系統中的人類泄物順流而下,媒微生物都會引起肝病、呼吸道感染,以及可能致命的腸胃疾病。
  5. Fibre - cement pipes for drains and sewers - part 2 : manholes and inspection chambers

    用纖維.第2部分:人孔和檢查室
  6. Since 1979, when the mainland embarked on the road of economic reform, there were rapid population increases in cities and towns and the development of industries along the dongjiang river catchment area. the guangdong authorities did not adequately control pollution and failed to protect the surroundings from human settlements and industry. this contributed to the continuous decline in the quality of the dongjiang water

    自1979年中國實行經濟改革開后,東江沿岸的工業發展及城鎮人口增長十分迅速,廣東省政府對染工業及生活制滯后,沿江市民的環保意識低落,使近年來東江河質不斷下降,港府過濾東江原的過程變得復雜,過濾原的成本亦因而不斷上升。
  7. The food and environmental hygiene department ( fehd ) and the building management carried out thorough cleansing and disinfection of the common areas and individual flats of block e between april 7 and 10. disinfection of individual flats focused on sinks, bathtubs, washbasins, toilet bowls and floor drains in the toilet and kitchens. subsequent test for e - coli showed that the disinfection of the sewage system was effective

    在四月七日至十日期間,食物環境?生署(食環署)及理公司已為e座的公眾地方及各個單位進行徹底清潔及消毒。各個單位的消毒工作集中在廁所和廚房內的洗滌盆、浴缸、洗手盆、馬桶和地面渠。其後進行的大腸桿菌化驗結果顯示,是次系統的消毒工作有效。
  8. One major means of control was a licensing system

    染的主要制工具之一是實施牌照制度。
  9. Plastics piping systems - thermoplastics piping systems for soil and waste discharge - test method for airtightness of joints

    塑料道系統.建築物內糞道用熱塑道系統.連接件的氣密性試驗方法
  10. Vitrified clay pipes and fittings and pipe joints for drains and sewers - survey on standards and other documents

    用陶土和配件以及連接件.標準和其它文獻
  11. Effluent discharge pipe

    污水排放管
  12. Understanding these processes is of critical importance for evaluating the water environment, arranging the sewage outlet, and selecting the position of water reservoir and regulation of the yangtze estuary. the study has not only theory value but also practical value

    該研究對合理開發和利用長江河口的資源、合理、制訂規劃和理、避咸蓄淡、避蓄清庫工程的選址提供重要的科學依據。
  13. It has been shown that this updated sampling and measurement method, which can measure the content of tar and dust individually, appears much more precise and credible, particularly aiming at the characteristic of heavy tar and dust content in biomass gas. this clarification system that adopts two - level shell and tube condensers and one tar removal filter, has the advantages of high removal efficiency ( 97 % ~ 98 % ) and low operating cost. besides, it has been made more environmentally friendly considering that wastewater from condensers has measured up to related effluent state standards after being disposed in tar clarifier - tank

    多次試驗表明:針對生物質氣浙江大學碩士學位論文含焦油灰塵量大的特點,改進的生物質焦油取樣測量法可實現焦油和灰塵的分離,有較高準確性和可靠性;採用二級殼式冷凝器與一級乾式過濾器結合的燃氣冷凝凈化系統不但凈化效率高( 97 98 ) 、運行費用低,而且含焦油廢二經過澄清池澄清處理后可達到國家相關標準,避兔了濕式凈化系統的染;兼顧凈化效果、經濟性和減少染考慮,採用以半焦為吸附材料的于式凈化系統可以達到炊用燃氣對焦油含量的要求。
  14. These would involve activities as varied as tackling the discharge of pollution in beach catchment areas, providing proper sewerage facilities to areas in the hinterland of beaches, diverting or extending sewage outfalls, controlling waste disposal from livestock and other pollution sources, and taking localised remedial action wherever necessary

    這些長遠措施,包括制泳灘腹地的為泳灘的集區建設完善的收集及處理設施改道或擴建渠控制禽畜廢物及其它染源,以及採取其它可行的補救措施。
  15. The panel discussed the current status of ssds, in particular progress of the stage i tunneling works and the way forward for stages ii, iii and iv

    事務委員會討論有關策略性計劃的最新情況,特別是第i階段道工程的進度和第ii iii及iv階段的未來路向。
  16. The sewage discharges with the tubing

  17. With the establishment of the southern water control zone in august 1988 which covers the mui wo river in south - east lantau, the epd was able to implement the water pollution control ordinance there and require villagers to maintain their septic tanks properly and treat any effluent before discharging it

    政府於1988年8月設立了南區制區范圍涵蓋大嶼山東南部的梅窩河,環保署隨即在區內執行制條例的規定,要求村民妥善維持化糞池運作並在前先進行處理。
  18. Following this, an extensive public sewer connection programme in the area was carried out. for a while, rocky bay was the sole exception to the trend described above, partly due to a large area of unsewered village houses close by. however, after drainage improvements diverted waste water outlets further away from the beach, it finally achieved wqo compliance in 1999 and since then has consistently met the wqo threshold

    南區泳灘的質在1990年代後期已普遍改善,但石澳后灘的質仍然欠佳,主要是因為附近還有許多村屋尚未接駁到公共系統,其後政府進行了系統改善工程將口改道至遠離泳灘的地方,石澳后灘終于在1999年達到質指標,自此更一直沒有出現超出指標的情況。
  19. Our product also contains a patented device made of stainless steel and silica gel, which effectively eliminates the odor form the drainage system and urinal stains

    由於不用沖洗,不僅節約了上道,也解決了污水排放管網的壓力,在安裝,使用,維護,修理等方面都具有沖小便器不可比擬的性能。
  20. Elastomeric seals - material requirements for pipe joint seals used in water and drainage applications - vulcanized rubber

    彈性密封件.設施用聯接密封件的材料要求.硫化橡膠
分享友人