污水管 的英文怎麼說

中文拼音 [shuǐguǎn]
污水管 英文
bilge pipe
  • : Ⅰ名詞(臟水; 臟物) slops; sewage; dirt; filth Ⅱ動詞(弄臟) defile; dirty; smear Ⅲ形容詞1 (臟)...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. Air admittance valves for plumbing drainage systems

    污水管道系統用氣體導入閥
  2. With the rapid development of urban construction, the protection of water environment is more and more important and the waste water treatment establishment has been gradually completed. and it brings a lot of data of sewage pipe network and appurtenant works

    目前我國城市建設發展迅速,城市體保護越來越受到重視,相應的處理設施也越來越完善,污水管網及其附屬設施的信息量越來越大。
  3. Centrifugal machine of hot mold with resin - coated sand

    多工位離心污水管
  4. Standard specification for ductile iron gravity sewer pipe

    球墨鑄鐵污水管標準規范
  5. Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines

    安裝的預制混凝土污水管道的表面滲入和滲出的驗收檢驗的標準實施規程
  6. Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines metric

    安裝的預制混凝土污水管道的表面滲入和滲出的驗收檢驗的標準實施規程
  7. Several house drains, usually of 10 cm internal diameter and made of fired clay, flow into the street sewer which is of 15 23 cm diameter

    住宅的排道通常用若干條內徑為10厘米由燒結粘土成制的道,通往徑15 23厘米的街道污水管
  8. The basic task of sewage pipe net is to ingather and transport waste water to sewage managing equipment in due course, security and without any block

    污水管網的基本任務就是及時、安全、通暢地收集、輸送處理設施。
  9. It became necessary to provide drainage or sewer systems to carry such wastes away from the area.

    提供排系統或污水管道系統,把廢物排出市區已成為必要。
  10. This is especially true where the effluent is being discharged to a municipal sewer to avoid shock loadings to the treatment plant.

    特別重要的是,在廢排入城市污水管道時不要對城市處理廠造成沖擊負荷。
  11. Control of corrosion by sulphuretted hydrogen of sewage pipe

    污水管道的硫化氫腐蝕及其控制
  12. It includes two aspects in content : one is the best choice for plane disposal of pipeline, and its methods follows as decision - making plot, simple trapeziform and optimizing trunkform etc ; the other one is optimizing pipe parameter when the plane disposal of pipeline has been fixed, and the methods of which are linear programming, unlinear programming, dynamic optimizing, direct optimizing, hereditary arithmetic and so on

    污水管網優化設計包括兩個方面的內容:一是線平面布置的優化選擇;其方法有:決策圖法,簡約梯度法,優化樹法等。二是在線平面布置已定情況下進行道參數的優化;其方法有:線性規劃法,非線性規劃法,動態優化法,遺傳演算法,直接優化法等。
  13. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers

    涵洞雨污水管道用預制鋼筋混凝土箱形斷面的標準規范
  14. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric

    涵洞雨污水管道用預制鋼筋混凝土箱形斷面的標準規范
  15. Never pipe the discharge line directly into a drainage ditch, sewer or sump

    不要把排泄直接插入排泄地漏、污水管坑裡。
  16. The team carried out three drainage surveys and four closed - circuit tv surveys covering extensive areas. dye - tracing was used to track misconnections back to where they originated, and the epd also cracked down on illegal back - lane dishwashing at food stalls and restaurants

    負責的隊伍進行了三次廣泛的渠道調查和四次閉路電視調查,此外並應用色粉測試法追蹤誤駁污水管的源頭,以及打擊熟食檔和在後巷清洗碗碟的食肆。
  17. En 295 - 2 vitrified clay pipes and fittings and pipe joints for drains and sewers. part 2 : quality control and sampling

    污水管用陶土配件和道連接件.第2部分:質量控制和采樣
  18. Vitrified clay pipes and fittings and pipe joints for drains and sewers - part 2 : quality control and sampling includes amendment a1 : 1999 ; german version en 295 - 2 : 1991 a1 : 1999

    陶土污水管.配件件及連接件.第2部分:質量控制和取
  19. The victoria harbour phase ii water control zone was declared in 1995, and this in turn enabled the epd to begin the task of identifying and removing expedient connections that were polluting the nullah

    1995年,政府劃定了維多利亞港第二期制區,環保署先調查區內非法接駁排染的情況,繼而拆卸非法接駁的污水管道。
  20. Storm and grey water pipes

    污水管
分享友人