沉箱基 的英文怎麼說
中文拼音 [chénxiāngjī]
沉箱基
英文
caission foundation-
There are many factors influencing the placing quality of caisson, such as bed leveling quality, sea conditions, as well as the level of placing equipments
影響沉箱安裝質量的因素很多,如基床整平的質量、海況的好壞、安裝設備是否先進等。Box caisson foundation
深基礎沉箱基礎Figure 10 - typical section of caisson foundation for cooling water pumping station
圖10 -冷卻用水抽水站沉箱地基剖面圖During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation
在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。In environment water treatment aspect, there are professional technology staff who are working on environment protect and dedicate to transplant foreign advanced technology, meanwhile they develop acidity / alkalescence waste water treatment technologies and equipment, soft water desalination technologies and equipment, high effectual lime preparation and putting set, high effectual integration putting set, at the same time, develop gravity sand filters, bevel precipitate set, many series of filter set, super filter set, prevent infiltration set, cooling tower, large - sized frothing water tank, cleaning device etc. all these technologies and equipments are domestic leading level
環保水處理方面,有專業從事環保方面的技術專業人員,在從事多方面環境污染治理工作的基礎上,致力於消化移植國外先進技術,研製開發出酸性/堿性廢水處理工藝和成套設備、軟水脫鹽水工藝和成套設備、高效石灰乳制備及投加裝置、高效一體化加藥裝置,同時開發出重力砂濾器、斜板沉澱器、多種過濾器、超濾裝置、反滲透裝置、冷卻塔、大型鼓泡水箱、清洗裝置等單體設備,這些工藝技術與設備均居於國內領先水平。Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985
自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。Topics include : site investigation ( with emphasis on in situ testing ), shallow ( footings and raftings ) and deep ( piles and caissons ) foundations, excavation support systems, groundwater control, slope stability, soil improvement ( compaction, soil reinforcement, etc. ), and construction monitoring
主題包含有工址調查(強調現地試驗) 、淺基礎(基腳式基礎與筏式基礎)和深基礎(樁基礎與沉箱) 、開挖之支撐系統、地下水控制、邊坡穩定、土壤改良(夯實與土壤加勁等)和施工監測等。It is found : ( 1 ) when the current direction is close to that of the line through the two caissons ' centers, the current speed within the area between the double caissons apparently decreases ; ( 2 ) sea ice ride - up and pile - up against the outer side of the caissons are similar to that against single caisson, and sea ice ride - up and pile - up are determnined by the sea ice velocity, sea ice thickness, tide and the storm set up ; ( 3 ) when locate two caissons, the tops of the two caissons in the shield area are no ice covered
研究發現: ( 1 )當海流流向與雙沉箱的中心連線相近時,雙沉箱對峙區的流速明顯減小; ( 2 )雙沉箱外側區域的海冰爬升和堆積與單沉箱時基本相同,其爬升和堆積與海冰的速度和厚度、天文潮高等有關; ( 3 )雙沉箱設置時,對海冰爬升和堆積會起到有效的屏蔽作用,對峙區內的雙沉箱頂上不再有海冰堆積。Means any place in which, by virtue of its enclosed nature, there arises a reasonably foreseeable specified risk, and without limiting the generality of the foregoing, includes any chamber, tank, vat, pit, well, sewer, tunnel, pipe, flue, boiler, pressure receiver, hatch, caisson, shaft or silo in which such risk arises
指任何被圍封的地方,而基於其被圍封的性質,會產生可合理預見的指明危險,在不局限於這個一般性的原則下, 「密閉空間」包括任何會產生該等危險的密室、貯槽、下桶、坑槽、井、污水渠、隧道、喉管、煙道、鍋爐、壓力受器、艙口、沉箱、豎井或筒倉。In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil
摘要針對長江口深水航道治理二期工程施工過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。The mat foundation is composed of precast cellular caisson structures in - filled with ballast materials
-席式地基以盛滿壓重物料的預制方形沉箱建造Associated with engineering practice, two important questions. one being laying - over depth of box foundation and the other being the measures for treating different settlement between main and buildings, are discussed in the view of designing. and the methods for dealing with practical engineering problems are presented also
結合工程實踐,從設計的角度對高層建築箱基的埋置深度和主樓與裙房間沉降差異的解決措施進行了討論,提出了一些處理實際工程問題的措施分享友人