沙壩灘 的英文怎麼說

中文拼音 [shātān]
沙壩灘 英文
bar beach
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 名詞1. (岸邊) beach; sands 2. (江河中水淺多石而水流湍急處) rapids; shoal
  1. ( 2 ) this paper has firstly identified these genetic units on shore beach - shore face, longshore zone, longshore sands, erosional channel, leveed channel, turbidite lobes, turbidite sheet, slump, debris flow, density - modified grain flow etc ; at the same time, and points out that the lake of cretaceous is open - type fresh water lake

    ( 2 )首次系統確定濱-濱面、沿岸帶、沿岸、侵蝕水道、有堤水道、濁積葉狀體、席狀濁積、滑塌體、碎屑流、密度改正顆粒流等成因單元。同時指出白堊紀湖泊為開放型淡水湖。
  2. 3 analyzing particle size of the wind - blown sediment and surface soil indicate that the former in 0. 02mm - 0. 2mm occupy about 40 % and 55 % of sloping field and shoaly land of bashang, which shows that bashang is the erosion and desertification region or the latency. 4 the search of decreasing effect of wood strap indicates that in lower wind speed the effect is distinct

    3風蝕物及表層土壤顆粒粒徑分析表明,地表200cm高度內風蝕物粒徑在0 . 02mm 0 . 2mm之間;上地區坡梁地與地該粒徑范圍顆粒分別佔40和55左右,說明上地區是風蝕化或潛在風蝕化地區。
  3. According to the contrast between different maps and the dynamical conditions, the area of bohe lagoon had reduced by 45. 3 % from 1932 to 2000 and human activities in the coastal zone, such as inning, sand dredging and aquiculture, have brought great effects on the coastal system, which has accelerated the barrier erosion and lagoon evolvement

    通過對比分析, 1932 ~ 2000年,博賀?湖面積減少45 . 3 % ,人類活動已成為影響該區海岸演變的主導因素;塗圍墾、海岸采與水產養殖等人類活動加劇了海岸的侵蝕後退,且使得?湖面積迅速減少,不斷淤淺萎縮,大大加快了海岸體系的演化進程。
  4. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬、塘廈、竹塘、嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘和八級抽水站。
  5. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬、塘廈、竹塘、嶺、上埔及雁田的抽水站,加高深圳水庫主1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  6. Among the 130 debris flow valleys, dazhai gully suspends high on the up range of baihetan hydropower station, with an altitude over 970 m and a drop more than 350 m. gravels, mud and flood in this valley brings the construction site in great danger. 3 kilometers upriver from the mouth of dazhai gully, lies the haizi gully, which is also frequented by debris flows, but will be taken as the dumping site for the construction

    庫區130條泥石流溝中大寨溝以溝口海拔970餘米的高程和350餘米的落差高懸于白鶴水電站的大上方,其溝內泥石流帶來的礫石、泥與洪水直接威脅著電站建設工地和樞紐的安全;緊鄰大寨溝溝口上游約3km的海子溝則為一條泥石流活動頻繁的溝谷,因其出口將作為水電站建設的棄渣場地,流域內的泥石流活動關系著水電站建設中棄渣場的安危。
  7. The sceneries are including piled rainbow bridge, big sand dam, e lu long, moon lake ( chai shi tan reservoir ), and ma ti river

    包括疊虹橋景區、大景區、三腳洞景區、阿路龍景區、明月湖景區(即柴石水庫) 、馬蹄河景區。
  8. Silt will deposit there. velocities around groin head are larger than the scour velocity and scour hole may develop in this area. this would affect the stability of spur dikes

    受丁阻擋,田所在的邊區域流速很小,泥在此淤積:而頭附近流速較大,通常在此區域形成沖刷,影響丁的穩定性。
  9. Reservoir - forming conditions of beach - barrier sandstone of segment shasi in western dongying depression

    東營凹陷西部四段砂巖油氣成藏條件
  10. Baihetan hydroelectric power station of jinsha river is another planned giant project after three gorges and xiluodu water c onservancy p roject i n c hina

    江白鶴水電站是我國繼三峽、溪洛渡之後開展前期工作的又一座巨型電站。最大高275m ,裝機容量12000mw 。
分享友人