河水溫度 的英文怎麼說
中文拼音 [héshuǐwēndù]
河水溫度
英文
river temperature- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 溫 : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
- 度 : 度動詞[書面語] (推測; 估計) surmise; estimate
- 河水 : river water河水暴漲 tornado
- 溫度 : [物理學] temperature
-
The hydrology and aerography indexes change in the middle of the rainy season in dry - hot valley are explored in this paper, which involves the mean ground temperature, relative humidity, runoff on trunk, rainfall, evaporation quantity, etc
摘要對雨季中期乾熱河谷加勒比松林林中與林邊平均地溫、空氣相對濕度、樹幹流量、降雨量、蒸發量等水文氣象指標進行了研究。Ammonifiers in suzhou creek can not use inorganic nitrogen and carbamide as nitrogen source ; additional carbon source and garbage lixivium have little influence on ammonifiers growth ; high content of salt and low temperature restrain ammonifiers growth ; alkalescent condition has little influence on ammonifiers, but acidic condition restrain ammonifiers growth ; the biomass of ammonifiers are not necessary correlated with the function of ammonifiers, adding glucose with 1g / l content into the water sample obviously promote the growth and function of ammonifiers. physiological groups of bacteria play significant role in the translation and
蘇州河的氨化菌無法利用無機氮和尿素作為氮源;在營養條件充足時添加額外c源和富含有機物的垃圾浸出液對氨化菌的生長基本無影響;高鹽度和低溫抑制氨化菌生長;堿性條件對氨化菌的生長影響不大,酸性條件對氨化菌生長具有抑制作用;氨化菌生物量的消長與轉氨活性之間不存在必然聯系, 1g / l的葡萄糖對蘇州河水樣中氨化菌的數量和轉氨功能具有明顯的促進作用。The equation for estimating land surface temperature of huaihe river basin has been set up by using the data of split window channels of trmm and gms - 5 satellite and the ground observation data of hubex
利用trmm衛星和gms - 5衛星的兩個紅外分裂窗通道的亮溫資料,結合淮河流域能量與水分試驗hubex加密觀測期間獲得的地面溫度的觀測資料,建立了反演淮河流域地面溫度的參數化方程。Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed
結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。Upon arrival at london in the morning, we start our sightseeing tour immediately with a visit to the state apartments of windsor castle, one of the oldest continuously inhabited royal residence in the world and the weekend home of queen elizabeth. after lunch, well have a panoramic tour of the city including the parliament building, big ben, trafalgar square, and piccadilly circus. photo stops in front of the buckingham palace and westminster abbey will also be arranged
離開溫莎小鎮后,至?中心的中國城享用午餐,午後沿著泰晤士河,乘車游覽車水馬的匹卡得利大街特拉法加廣場議會制度起源的英國國會議事廳,以及首相官邸唐寧街十號,最後來到英國女皇的寢宮白金漢宮前,攝影留念,充分體驗這個曾經顯赫一時的國際性大都? 。With reof analyze technique, the mainly anomalous spatial features of soil humidity in the 0 - 50cm layer of huai river basin and their relations to different periods of precipitation and air temperature are specially analyzed by using the observed data including dekad averaged soil moisture, precipitation and air temperature data over the east of china from 1990 to 2000. the results indicate that in the springtime the 30cm layer soil can be treated as a boundary
本文首先利用中國東部1990 - 2000年旬平均土壤濕度、降水和氣溫觀測資料,通過對0 - 50cm層次土壤濕度進行旋轉主分量分析( reof ) ,重點分析了淮河流域土壤濕度的時空分佈特徵,並初步研究了與前期、同期和後期不同時段降水與氣溫的關系。The paper discusses the methods of multi - objective ecological operation of reservoirs, which covers the establishment of legislation systems ; water demands for the basic ecological functions of downstream river channel ; reservoir discharge patterns simulating natural hydrological regimes ; regulation and control of sedimentation and eutrophication of reservoirs ; mitigation of the influences by water temperature stratification ; the operation techniques in pollution prevention and connectivity reinforcement of water systems
文中討論了水庫多目標生態調度的方法,包括建立相應法規體系;保證維持下遊河道基本生態功能的需水量;模擬自然水文情勢的水庫泄流方式;進行水庫泥沙調控及水庫富營養化控制;減輕水體溫度分層影響;進行防污調度以及增強水系連通性等方面的調度技術。Jinjiang hotspring hotel, located in the boao water city, which collect river, lake and sea beautiful scenery for one whole. it is an international four - star beach leisure and holiday hotel. which covers area about 46000 square meters, and the architecture area about 22000 square meters, with 3 theme buildings of european - contitent style
錦江溫泉大酒店坐落在集江河湖海美麗風光於一體的博鰲水城,是一座國際四星級標準的海濱休閑度假酒店。酒店佔地面積46000平方米,建築面積22000平方米,三幢歐陸風格的主題建築。Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine
非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。The effect of temperature on nitrification in a two - stage baf system used for the treatment of ammonia - rich river water was investigated
考察了溫度對處理氨氮較高的河水的兩級曝氣生物濾池系統中硝化反應的影響。The approaches establish a relationship between monthly precipitation abnormality and monthly circulation, soil moisture and temperature on the shallow and deep layers. the relationship is the precipitation diagnostic equation and its coefficients and dimensions are determined by using the observed data of huai river basin. then we select the main soil moisture and temperature attributing factors by the dimensional analysis to establish a forecasting equation of summer precipitation over huai river basin with the statistic approach
通過將大氣中的熱量、水汽收支方程與一個簡化的兩層土壤溫度、濕度方程相結合,並依據月尺度大氣環流的演變特徵,推導出月降水距平與500hp月平均高度距平場、土壤深淺兩層溫、濕度的關系;利用臺站觀測資料,使用統計反演方法確定方程中各項的系數和量級,從而找出影響降水的主要土壤溫、濕因子;利用統計方法建立這些因子與淮河流域夏季降水異常之間的簡單線性預報方程,並對1992 - 2000年淮河流域夏季降水趨勢進行回報。On the basis of the field data of water temperature, a new formula for estimating water temperature of river by using meteorological factors is put forward by using the method of least squares
摘要結合某流域水溫原型觀測資料,通過分析水溫與氣溫、太陽輻射、濕度和風速之間的相關關系,採用最小二乘法建立了水溫與氣溫、濕度和風速三者之間的多變量函數方程式,提出了一種利用氣象因子估算天然河道水溫的新公式。Rocks from the creek are used to regulate the amount of icy mountain water that is allowed to mix with the hot spring water that bubbles onto the creek s stony beach, creating a form of natural temperature control for the pools
由山麓粘板巖和河灘亂石中冒出的溫泉,隨意以溪石為堤,導入冰涼的山泉水調節溫度,就是一個天然的溫泉池。The coarser sedimentary layers reflect the period of warm and wet climate, during which the natural runoff of weihe river violently rose, the speed of flow increased and the flood easily occurred ; on the contrary, the finer sedimentary layers reflect the period of cool and dry climate, during which the natural runoff of weihe river fell and the speed of flow slowed
在氣候相對溫濕、降水量較大的時期,渭河水動力條件增強,流量增大,流速加快,出現粒度明顯變粗的沉積夾層,此時也是洪水多發時期;而在氣候相對涼干、降水量較少的時期,渭河水動力條件減弱,流量減少,流速變慢,因此出現粒度明顯變細的沉積夾層。In the final stage of the liangzhu culture, warm - humid climate, heavy precipitation and rising temperature led to sea - level rising, rivers running impeded, water areas large, in addition that the sites in the last stage of the liangzhu culture were mostly located in low - lying areas, which had liangzhu ancients suffered a unparalleledbig flood disaster resulting in the cultural decline
良渚文化末期,氣候暖濕,溫度增加,導致海平面上升,入海河流宣洩不暢,水域面積擴大,加之良渚文化晚期遺址多分佈在地勢低洼地區,因此良渚先民遭受了一場大洪水災難,遂使良渚文化迅速衰落。Based on the analysis of the temperature test result of the landing rectangle aqueduct of caohe river for the emergency water supply project of the beijing - shijiazhuang section on the middle route of the south - to - north water diversion project, the temperature developing feature of the early - age hydration heat of the thin - wall concrete is described, and then the main effecting factors of the hydration heat temperature on the landing rectangle aqueduct and the control measures concerned are put forward herein
摘要通過對南水北調中線京石段應急供水工程漕河渡槽段落地矩形渡槽溫度測試結果的分析,闡述了薄壁混凝土早期水化熱溫度發展的特點,提出了影響落地矩形渡槽水化熱溫度的主要因素與控制措施。The results indicated that the lrgr mean winter rainfall longitudinally distributed along river, while the unique topography of lrgr did not obviously have impact on the winter rainfall ; the winter temperature distribution was like belt, which decreased from low latitude to high latitude ; the passing - obstructing effect of lrgr cannot be clearly showed with the winter temperature distribution ; but such effect is obvious over nu - valley and lancang - valley
結果表明:縱向嶺谷區多年平均冬季降水空間上沿河流呈縱向分佈;但縱向嶺谷獨特地形對冬季降水變化的空間分佈影響不明顯;冬季氣候平均溫度大致呈東西向帶狀分佈,由低緯到高緯溫度逐漸遞減;在區域上,縱向嶺谷獨特地形的「通道阻隔」作用對冬季溫度空間分佈的影響不明顯;但在怒江和瀾滄江流域,這種影響則較為明顯。But, in some other water areas such as the narrow - deep tide channel, narrow - deep valley reservoir and narrow - deep estuary area, the vertical varies of parameters such as the velocity, temperature and concentration is far greater than that in the horizontal direction, so the two - dimension vertical numerical simulation technique should be adopted in these areas
而在另外一些水域,如窄深潮汐通道、窄深型河谷水庫如三峽、窄深河口地區,有關參量(如流速、溫度、濃度等)的垂向變化要比水平橫向的變化為大,應採用垂向二維水流水質數值模擬技術。The air was thin, the temperature and the air pressure were low, and it was very difficult to cook rice or vegetables. it was much simpler to eat raw vegetables ; all i had to do was to wash them in the water of the ganges, sprinkle a little salt on them, and then eat them. i did not deliberately want to practice asceticism
例如,你們聽說師父在喜馬拉雅山修行時,每天只是吃一些生菜,因為那裡地勢很高,空氣稀薄溫度低氣壓也低,不管是煮飯煮菜都很難熟,吃生菜比較簡單,只要用恆河的水洗一洗,沾一點鹽巴就可以吃了,並不是師父故意要修苦行。分享友人