河流模型 的英文怎麼說
中文拼音 [héliúmóxíng]
河流模型
英文
river model- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 河流 : rivers; stream
- 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
-
By the calculating of the distorted models and the undistorted model of the circumfluence, the effect of the distortion ration on the flow is analyzed
採用平面二維模型,在數學模型的基礎上,計算變率使河工模型彎道水流在相似性上產生的影響。In the paper, river and the downstream area of dike are regarded as a whole system, and hydraulic model of coupling 1 - d river and gradual dike - break is established, therein the preissmann implicit difference scheme is applied to main river, and the fvm ( finite volume method ) is applied to the breach and polder
本文將河道與堤壩下游區域視為一個整體,對于單一河道採用preissmann四點隱式差分格式計算,對于潰口及圩區採用有限體積法,建立了一維河道與堤壩漸潰耦聯的水力模型,也是一維、二維耦合的水流模型。The flow dynamic axis in the distorted models is smoother than that in the undistorted model, while the flow horizontal gradient in the distortion model is smaller than that in the undistorted model
在河工模型的條件下,選取不同變態模型,對環流進行了計算,研究了變率對彎道水流的相似的影響,並給出了初步分析。By modeling of " y " - shaped junction of the compound river channel with an intersection angle 90, the flow velocity and water level at the junction were obtained by use of the acoustic doppler velocimeter ( adv ) and point gauges
摘要通過製作交匯角為90的復式斷面河道" y "型交匯河口模型,利用三維聲學多普勒流速儀( adv )和測針獲取流速及水位數據,對支流河口處的水流流態包括水面形態、水流流速和水流分區進行分析。In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered
在海河流域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。Through examination of the recession limbs of the observed hydrographs, during periods with no rain and thus no surface runoff, one can determine the value of. for this catchment, a value of 0. 8 is obtained. the simulated subsurface runoff at each grid is routed to the outlets through a unit - hydrograph method for overland flow and the linear saint - venant equation for channel flow to get the discharge at xixian station
對所研究的流域而言,經過估算消退系數為0 . 8 .耦合著這兩種不同地下徑流機制的clm模型都可以計算出每個網格的地表地下徑流深,採用dag lohman 34 , 35發展的匯流模型進行匯流由於是研究地下徑流,所以取每個網格的地表徑流為0 ,該模型採用單位線計算坡面匯流線性聖維南saint - venant equation進行河道匯流Geography position and meteorology character in gongboxia watershed are analyzed, according to which the excess of infiltration and instantaneous unit hydrograph are used in runoff and affluence models, and muskingum routing method in river course affluence, kalman filtering technique and least square method in real - time correction
分析公伯峽流域所處地理位置及該流域內的氣象特徵,確定產、匯流模型採用超滲產流和瞬時單位線,河道匯流採用馬斯京根法,實時校正法由卡爾曼濾波和最小二乘法組成。Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed
文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案A 3 - d baroclinic ocean model is used to examine the influence of tide, offshore wind and upwelling - favorable wind on the river plume development
摘要採用三維斜壓海流模型模擬了潮汐混合、離岸風以及上升流風對河流羽流發展的影響。Taken yanjia river watershed as an example, this study extracted watershed digital characters from dem, and simulated rainfall - runoff with the rainfall - runoff model based on gis and wms. the main contents and results include : ( 1 ) the building of the spatial database of watershed
本研究應用地理信息系統和wms模型系統,以三峽庫區晏家河流域為例,由dem提取流域數字特徵,再與降雨徑流模型有機結合進行了降雨徑流數字模擬研究,主要的研究內容和結果包括以下幾個方面: ( 1 )建立了流域空間數據庫。( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time
( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽蓄響應和洪水過程時間變化率的響應滯后。To analyze the hydrodynamic structure of the estuary, 3d k - numerical model with curvilinear fitted coordinate has developed. the distribution of velocity and turbulent exchange coefficient at different time has obtained and analyzed
紊流模型對測驗河段進行計算,得到特徵時刻該潮汐河口段的水力要素及垂向紊動混合系數的分佈。Therefore the upper layer is water flow and the nether layer is debris flow. the moving water compressive force and the shear force of interface are taken into account
將粘性泥石流與主河的匯流視為分層流研究,上層為主河水流模型,下層為水下泥石流運動模型。Based on the review of recent advances in surveying and controlling techniques of river models, described in this paper is a new controlling technique, which makes use of a two - way axial - flow pump and a immersion pump to control the up - boundary condition of discharge and the down - boundary condition of water level respectively, with the tidal model of the huangpu river estuary as an example
在對河工模型量測與控制技術進行回顧的基礎上,以黃浦江河口潮汐河工物理模型為例,介紹了潮流河段上邊界採用軸流泵進行雙向流量控制、下邊界採用潛水泵進行水位控制的新技術。Secondly, by means of arranging and analyzing the construction monitor data, the practicality method of proposing the dewatering calculation model and parameters of the non - constantly pumping dewatering well was proposed, moreover the equivalent calculation model and parameters of the erhe project was proposed. thirdly, based on calculating the design scheme of dewatering well with the equivalent calculation model, the optimized scheme of dewatering well of the erhe project was proposed and the well number was reduced to 32 where it was 42 in the old scheme. at last, based on the well construction, the dewatering well structure and constructing technique in the soft soil area were exploited in addition, the significative analysis and evaluation attitudes to the old design scheme of dewatering well project were impersonally proposed
首先,根據工程地質及水文地質條件和工期分析,提出了「二河」降水井的設計方案;其次,通過系統整理分析抽水井的施工監測記錄,提出了用降水井的施工監測確定非定常抽水降水井井流模型和參數的實用方法,並建立和確定了「二河」降水井非定常抽水、有越流的完整潛水井等效模型和參數;接著,通過用等效井流模型進行降水井方案的計算,提出了「二河」降水井的優化方案,使原方案的42眼井降到32眼井;最後,通過對降水井成井施工實踐的總結,開發了適于軟土區的降水井結構和成井施工技術。Using the 1 - d rivernet model calculates the water discharge ratio of the two branches and also duplicates the back - flow in the north branch during flood tide. the 2 - d model with a fine grid is applied to the field of flow in the changjiang estuary and the results are well in agreement with the measured flow
同時利用河網模型對長江口分汊河段進行一個月的水流模擬,並獲得了長江口南北支分流比,復演出北支漲潮時水體倒灌轉流現象,解決了河網模型用於分汊河道潮汐水流模擬的問題。The paper also proposed a new method to build a comprehensive precipitation - runoff model based on soil and water conservation practices
黃土高原水土保持對河川徑流及土壤水文的影響提出了建立基於水土保持措施的流域降水產流模型的新方法。Firstly, a 1 - d flow numerical model based on the preissmann scheme, a 1 - d rivernet flow numerical model based on the direct solution method and a 2 - d tidal model based on the implicit scheme of finite difference method are programmed
本文首先建立了基於preissmann演算法的一維水流模型、基於直接解法的平原河網模型和基於有限節點法的平面二維水力模型,在對各模型的演算法進行推導的基礎上自行開發了計算程序。4. 1n order to priority meet the water needs of songhua basin and transfer more water to liao basin, in main river model " limiting line " method is used to operate reservoirs
4 、幹流模型中採用了利用水庫調水限制線的方法對水庫進行調度,以優先滿足松花江流域用水后,再盡可能向遼河流域調水。By means of wide investigation, instruments development, a series of model experiments and relative theory analysis, following results are obtained in river model time scale distortion ratio, model roughening, inflow and outflow controlling methods and equipment, new water level and velocity measuring technique, model automatic measuring and controlling system : ( 1 ) with the aid of configuration software, a large scale river model automatic measuring and controlling system is developed, realizing river model automatically controlling and basic hydraulic parameters automatically measuring
本文通過廣泛調研、儀器研製、系列模型試驗和相關的理論分析,在河工模型時間變態率控制、模型加糙、出入流檢測方法和設備、水位流速測量新技術、模型自動測控系統等方面取得了下列成果: ( 1 )應用工控組態軟體技術,開發了一套大型河工模型自動測控系統,實現了模型內外邊界的自動控制和基本水力參數的自動量測。分享友人