河流與潮汐 的英文怎麼說

中文拼音 [liúcháo]
河流與潮汐 英文
rivers and tides
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ名詞1 (潮汐; 潮水) tide 2 (比喻大規模的社會變動或運動發展的起伏形勢) (social) upsurge; cur...
  • : 名詞(夜間的潮) tide during the night; nighttide
  • 河流 : rivers; stream
  • 潮汐 : morning and evening tides; tide潮汐電站 tidal power station
  1. By simulating river plume evolution under the combined action of tide and estival wind field averaged over many years, we have found that the modeled salinity distribution is consistent with the observed one rather well, which means the river plume development plays an important role in adjusting the salinity distribution in the surface layer of bohai sea

    通過檢驗和渤海夏季多年平均風場共同作用下的發展特徵,發現計算得到的表層海水鹽度分佈實測值相當吻合,因此可以認為發展對于渤海夏季鹽度分佈起著重要作用。
  2. It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis

    最後,針對橋位段實測資料短缺而位資料相對完整的實際情況,基於大量樣本建立了要素的相關關系,利用實測長系列位資料得到分期最大量、速系列,經頻率分析確定了分期設計最大量、速。
  3. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃口口門逕區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從口泥沙沉積分配的過程來看:三角洲濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲濱海區泥沙的沉積比例來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在頂托、口門逐漸加寬、口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了路泥沙沉積分配的回歸計算式,據此可以預估計算口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了口三角洲岸線動態平衡的概念,並建立了黃口來沙量造陸面積的相關關系,得出了當口多年平均來沙量維持在3 . 45億t時其口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  4. Based on the review of recent advances in surveying and controlling techniques of river models, described in this paper is a new controlling technique, which makes use of a two - way axial - flow pump and a immersion pump to control the up - boundary condition of discharge and the down - boundary condition of water level respectively, with the tidal model of the huangpu river estuary as an example

    在對工模型量測控制技術進行回顧的基礎上,以黃浦江工物理模型為例,介紹了段上邊界採用軸泵進行雙向量控制、下邊界採用潛水泵進行水位控制的新技術。
分享友人