河流調節 的英文怎麼說

中文拼音 [liúdiàojié]
河流調節 英文
river regulation
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 節構詞成分。
  • 河流 : rivers; stream
  • 調節 : regulate; adjust; monitor; measure; take care of; condition; regulation; adjustment; conditioning...
  1. By means of kiba formation, k. ibt " and kibt2 segments analysis on the equivalent time stratigraphic framework, subtle traps will be predicted on stratigraphic traps and lithological traps. the results from the research indicated that : ( 1 ) this paper further indicates the control significance of southern boundary fault displacement component, which downthrown side forms syncline or anticline, and points out that 4 anticlines in south are adjustment zone and are the entering lake position of ancient river

    本論文的主要認識和結論如下: ( 1 )進一步認識南緣邊界斷層位移量對下降盤形成次凹或橫向突起的控制意義,認出南緣的4個突起是調帶之所在,也是古入湖處。這種格局導致凹陷強烈分割,並以橫向搬運為主。
  2. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃水資源系統建立幹梯級水庫、電站補償調優化模型,採用逐步優化演算法( poa )求解模型,定量分析計算了黃水量以及電量補償效益,探討了黃補償效益的分配方案和實施對策。
  3. Based on the characteristics of the daily regulation wave of hydropower stations, the water surface lines in the rising and falling stages are calculated by using an one - dimensional steady flow model and an unsteady flow sediment model

    摘要根據水電站日調波的特性,運用一維恆定和非恆定泥沙數學模型,分別計算了道漲落水過程的水面線。
  4. Runoff is also governed by the number and the length of streams in the basin.

    盆地內的數量和長度也能調
  5. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡域水電開發有限公司結合域水電開發實際,通過建立域水雨情監測網,開展群庫水、電、網多環的大系統綜合調度研究,域梯級電站控制模式研究、域供電范圍及開發時序研究,域規劃環境影響評價研究,以及龔嘴、銅街子電站梯級調度實踐,在域梯級電站統一調度研究方面已取得了初步的成果。
  6. The situation of yellow river dry - up is gradually rigorous. it has being influenced the development of the lower reaches of yellow river and the implement of strategy on developing the western areas. based on analyzing the harmfulness, causes of its dry - up from the factors of physical geography and human activities, this article put forward the engineering and non - engineering control measures for controlling yellow river dry - up : strenghtening the unified management and despatch for its water resource ; resorting to compulsion to save water ; quickening key projects duild for the addition of balance and water storing capacity ; increasing synthetical administer to ecological environment ; increasing effectivesupply of water resource

    形勢日趨嚴峻,斷的頻率增加、時間延長、里程增大,嚴重製約了黃域尤其是黃下游地區的可持續發展和開發大西部戰略的實施.在分析黃造成的危害、黃的自然因素和人為因素的基礎上,提出了加強黃水資源的統一管理和調度、採取強制措施厲行約用水、加快骨幹工程建設增加調蓄能力、加大域生態環境綜合治理的力度、適時開源增加水資源的有效供給等工程性和非工程性措施,以防治黃的斷
  7. So far as the alluvial fiver is concerned, the sediment - carrying capacity of flow and hydraulic geometry of river channel can be regulated by regulating the composition of flow rate, silt concentration and sediment ( water and sediment regulation ) during water and sediment discharge ; with which the relative balance for water and sediment discharge and the river channel evolution can be obtained

    摘要沖積性床在輸水輸沙過程中,調量及含沙量和泥沙組成(調調沙)可以調床水力幾何形態和水挾沙力,追求水沙輸運和床演變的相對平衡。
  8. B ) utilizing dong zhuang reservoir to adjust during on year. thus can decrease the sediment deposit of lower wei - river as result small flood and non - flood season

    利用東莊水庫調量洪水,進行年內調,盡可能減少小洪水和非汛期小水對渭下游的淤積。
  9. In this passage, author has studied the quota of irrigation that can make water used economically for various plants, if the irrigation quota can be lowered from 6795 m3 / a to 4500 m3 / a during the processes of irrigation, there will be a saving water amount of 3. 386million m3 / a, in shiyang river basin. there is no doubt that we can open the second source of river water that can provide the possibility of transporting 300 million m3 / a water amount to lower reaches of the river. in this paper, there are some analysis and prospects for the future situation of supply and demand of water resources in 2010

    民勤水資源減少的主要原因是人為因素,如全域人口增加、中上游耕地面積擴大,用水量增加,造成灌區重心上移;沒有樹立可持續發展觀,在經濟中搞短期行為;對石羊入民勤水量不斷減少、地表水、地下水轉化活躍、生態用水問題突出等方面進行了分析論證;對目前開發利用現狀、供需狀況進行了較為詳細的計算和評價;通過對各種農作物水灌溉定額的研究,若從現狀灌溉定額6795m ~ 3 ha降低到4500m ~ 3 ha實施灌溉,石羊域將水3 . 3867億m ~ 3 ,這無疑于開辟了第二水源,提供了向下游調水3億m ~ 3的可能性。
  10. In this paper, the index of unevenness, concentration, and variation have been defined and calculated according to gauge records of runoff in the 1956 - 2000

    根據長江源區1956 - 2000年月徑資料,分析了年內分配不均勻系數、完全調系數、集中度、集中期、變化幅度等特性。
  11. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  12. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特點: ( 1 )本系統採用產匯理論和水動力學方法預報太湖及重要點水位,首次在平原網地區建立了具有實時校正功能的全域預報調度系統。以適合太湖域復雜的水力條件,增強預報的可靠性; ( 2 )預報模型可以根據預見期降雨量進行多方案預報,並隨時間推移,可以實時進行調整,克服由於預見期降雨不確定引起的誤差,使預報結果更接近實際。
  13. 4. this thesis introduces the application of rd - 1005 mrfd in hunan yueyang dongting lake bridge and permanent magnetism adjustable assemblage mrfd in changsha hongshan bridge and changsha liuyang river bridge. the studies on cable vibration mitigation field tests in these bridges are presented

    4 .介紹了湖南嶽陽洞庭湖大橋上安裝磁變阻尼器的情況,在長沙洪山大橋、長沙瀏陽大橋全橋拉索上安裝了永磁調裝配式磁變阻尼器,並進行了現場拉索減振試驗研究。
  14. Article 9 relevant departments under the state council and local people ' s governments at various levels shall, when developing, utilizing, regulating and allocating water resources, make integrated plans for maintaining proper river flows, proper water levels of lakes, reservoirs and proper ground water tables, in order to retain the natural purification capacity of water bodies

    第九條國務院有關部門和地方各級人民政府在開發、利用和調調度水資源的時候,應當統籌兼顧,維護江的合理量和湖泊、水庫以及地下水體的合理水位,維護水體的自然凈化能力。
  15. Because of decrement in pesticide use, from 1999 - 2001, the poisoning probability caused by pesticides use for farmers who plant bt cottonseeds is respectively 17 %, 22 % and 4 % lower than those who plant non - bt cottonseeds, with an average number of 11 % in this three years. meanwhile, bt cotton planting farmers in yellow river watershed and changjiang river shed saved 48. 4 yuan and 107. 8 yuan per time in pesticide and wage losing cost, with the average of 68 in sample areas

    中岡農業和學院博卜學泣論文中英義摘芙山于農戶大幅度減少了衣藥投入, 1999 2001年調查的種植bt抗蟲棉的農戶發生農藥中毒的概率分別要比種植非bt棉的農戶低17見2肌和4 「三年總平均要低11以同時按照樣本所在棉區計算的bt棉種植農戶相應約的農藥和誤工費用分別為黃域棉區48
  16. ( 2 ) in term of two cases that being upstream long - liu regulation or not, solved optimal model to obtained compensation results of water supply and generation electricity. the ning - meng system increased water 17. 08 * 10a8 m3, the downstream system increased 7. 13 * 10a8 m3 ; the runoff power stations increased generation 8. 93 * 10a8 kw - h, the san - xiao increased 9. 10 * 10a8 kw - h

    ( 2 )按照「無」龍劉調和「有」龍劉調兩種情況,分別進行模型求解計算,對比分析得到黃上游水電站為中下游提供的水量以及電量補償調結果:多年平均上游水電站為寧蒙灌區增加有效供水17 . 08億m ~ 3 ,為下游省市增加有效供水7 . 13億m ~ 3 ;為上游徑式電站增加電量8 . 93億kw ? h ,為三小增加電量9 . 10億kw ? h 。
分享友人