河道排水系統 的英文怎麼說

中文拼音 [dàobèishuǐtǒng]
河道排水系統 英文
river drainage system
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
  • 排水 : drain off water; drain away water; dewatering
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. The variations in trace element contents and ratios may hold up a mirror to the lake - level fluctuations and climatic changes, which, in turn, have exerted a direct and important effect on the sequence stratigraphic development. collectively, the reservoir rocks from the yanchang formation consist dominantly of the delta front subfacies subaqueous distributary channel and channel - mouth bar microfacies and delta plain subfacies subaerial distributary channel microfacies fine - grained feldspar sandstones and siltstones. the reservoir rocks have been subjected to three stages of diagenetic and porosity evolution : ( 1 ) the porosity reduction by the mechanical compaction and chemical pressure solution during the early diagenetic stage ; ( 2 ) the porosity increase by the dissolution during the a substage of the late diagenetic stage, and ( 3 ) the porosity reduction by the cementation and filling during the b substage of the late diagenetic stage

    的儲層特徵研究表明,該區延長組儲層成因類型主要為三角洲前緣下分流口砂壩及三角洲平原上分流微相細粒長石砂巖、粉砂巖;儲層巖石經歷了壓實,膠結,溶蝕等成巖作用,歷經早成巖機械壓實和化學壓溶孔隙縮小期、晚成巖a亞期溶蝕作用孔隙擴大期及晚成巖a亞期( b亞期)膠結充填孔隙縮小期三個成巖-孔隙演化階段;儲層物性總體上具有較低孔滲、低孔滲的特點,孔隙類型主要為粒間溶孔、殘余粒間孔隙、粒內溶孔、晶間孔及晶間溶孔,裂縫不發育,儲集巖驅壓力和中值壓力較高,孔隙結構類型以細小孔-微孔隙,微細喉-微喉型為主。
  2. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 119cd ( part ) drainage improvement in northern new territories, package c ( phase 1 ) - - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - - ancillary road works

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨改善計劃c部分(第一期)新界粉嶺龍躍頭、軍地、丹山及嶺仔雨改善工程附屬路工程
  3. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 119cd part drainage improvement in northern new territories, package c phase 1 - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - ancillary road works

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨改善計劃c部分(第一期)新界粉嶺龍躍頭、軍地、丹山及嶺仔雨改善工程附屬路工程
  4. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 109cd drainage improvement works in tai po road works ancillary to the proposed river improvement works in upper lam tsuen river, she shan river and upper tai po river

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第109cd號- -大埔雨改善計劃建議的林村上游、社山及大埔上遊改善工程附屬路工程
  5. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 109cd drainage improvement works in tai po road works ancillary to the proposed river improvement works in upper lam tsuen river, she shan river and upper tai po river

    路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第109cd號- -大埔雨改善計劃建議的林村上游、社山及大埔上遊改善工程附屬路工程
分享友人