油層靜壓 的英文怎麼說
中文拼音 [yóucéngjìngyā]
油層靜壓
英文
reservoir static pressure-
The thesis was written under the direction of dynamic theory of forming reservoir, follows the rules of comprehensive information, judgment, interpretation and assessment and even makes full use of outcrop geology, data from drilling and logging, data from laboratory analysis and achievements in geophysical exploration. considering the basic factors of forming reservoir in the south of ordos basin as the starting point, the thesis defines that yanchang group of triassic goes into the start of generating oil in the late period of mid - jurassic and that the largest oil generation peaks in the middle period of early cretaceous, after the analogue - history of hydrocarbon generation. meanwhile it also establishes the relationship between the evolution of oil and gas and the formation of traps, the time of oil exploration
本文以成藏動力學理論為指導,本著綜合信息、綜合判斷、綜合解釋、綜合評價的原則,充分利用露頭地質,鉆測井資料,實驗分析資料及物化探成果,以鄂爾多斯盆地南部的基本成藏要素為出發點,通過生烴史模擬,確定了三疊系延長組在中侏羅晚期( 150ma )進入生油門限,于早白堊世中期達到最大生油高峰期;同時並確立了油氣演化與圈閉形成、捕油時間的關系;通過流體勢的全區計算,提出了該區油勢具有明顯的「雙層」結構特徵,並建立了以靜水壓力為主的重力流系統和以差異壓實作用為主的壓實流系統的流體動力分佈模型;通過成藏動力學系統的劃分及事件分析,探討了該地區油氣聚集規律,最終指出了有利的含油氣遠景區。Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils
通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。The paths for hydrocarbon migration were dominated by faulting, unconformity, pores or fissure network system, where the driving forces for oil / gas migration would be abnormal high pressure ( niubao formation depositional period ) and hydrostatic pressure ( dinqing lake formation depositional period )
油氣運移沿斷層、不整合、孔隙或裂隙連絡體系進行,運移驅動力在牛堡組沉積期為異常高壓,而丁青湖組沉積期則為靜水壓力。This way is still a practical approach to measure static pressure in horizontal wells, though needed to be im proved, producing mechanically with deep & deeper pay zones
盡管這一方法還有待進一步完善,但它不失為一種塔里木油田目前機采深層水平井測靜壓的實用方法。The group ' s four strategic business units provide heat treatments, materials testing, hot isostatic pressing, and metallurgical coatings to a wide range of industries including automotive, aerospace, power generation, oil and gas, military, petrochemical, agricultural and consumer product
集團的四個戰略業務單元為包括汽車、航空、發電、煉油、軍事、汽油、農業和消費品在內的各個行業提供熱處理、材料檢測、熱等靜壓和冶金塗層服務。分享友人