沿邊鋪設 的英文怎麼說

中文拼音 [yánbiānshè]
沿邊鋪設 英文
edgewise placing
  • 沿 : 沿名詞(水邊) water's edge; bank
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • 鋪設 : spread out; lay; build; laying
  1. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石壩建中,借鑒道路園林工程中道沿機的擠壓滑模原理,創造性使用墻施工法,在每填築一層墊層料之前,用擠壓式墻機製作出一個半透水混凝土小墻,然後在其內側按填壩料,用振動碾平面碾壓,合格后重復以上工序。
  2. However, this route alignment offered few options to serve the proposed boundary control facilities. therefore, the landing point has been moved south for the road to slope down along the southern coast of the black point headland. this alignment leads to the flat area around lung kwu sheung tan, which is the only viable location for the proposed boundary control facilities

    然而,此公路路線可供連接擬建的界口岸施的方案很少,因此,經修訂的建議是把著陸點南移,使路線沿爛角咀海角的南岸開始築,沿山坡往下興建,然後到達龍鼓上灘的平地。
分享友人