況梁 的英文怎麼說

中文拼音 [kuàngliáng]
況梁 英文
kuang liang
  • : Ⅰ名詞1 (情形) condition; situation 2 (姓氏) a surname Ⅱ動詞(比方) compare Ⅲ連詞[書面語] (...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋施工控制的重要性之後,簡要的介紹了工程概,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. It has been demonstrated that complement activating and cr2 cross - linking on b lymphocytes set up a bridge between innate and acquired immunity. the interaction of c3 and cd21 on b lymphocytes will benefit initiating immune response and regulating primary antibody response. cd21 / cd35 is important in the process of antibody avidity maturing, this is critical to b lymphocyte activation especially in the state of low antigen concentration

    現己證實補體的活化以及b細胞表面crz的交聯在先天和獲得性免疫之間架起了重要的橋,表現為c3與b細胞cdzi的相互作用有利於啟動抗體應答反應,並對初級抗體應答反應有調節作用: cdzi cd35對于抗體的親和性成熟具有重要作用,在抗原濃度低的情下,對于活化b細胞是至關重要的,而且mlgm (交聯有利於特異的低親和性b細胞對t細胞依賴性抗原和t細胞非依賴性抗原產生免疫應答。
  3. In order to prove the feasibility of the control method mentioned, both the semiphysical test for the plant simulated by analogue computer and the model test for the cantilever beam are designed and finished with the study of the parameter selection in realization

    對離線建模的智能旋翼頻域神經控制方法進行了試驗驗證研究,試驗分兩種情:以模擬計算機模擬受控對象的半物理模擬試驗與懸臂振動響應控制試驗,並研究了實現中的參數選擇問題。
  4. As a new special bridge type, self - anchored suspension bridge has won more and more engineering ’ s favors with its beauteous build, economy performance and striving adaptability of geology and topography feathers. it has become a very competitive blue print of the urban bridge with the span from 100m to 400m

    自錨式懸索橋作為一種特殊的橋型,以其結構造型美觀、經濟性能較好、對地形和地質狀適應性強等優點,越來越受到工程界的青睞,成為城市裡100 - 400m跨徑范圍內極具競爭力的橋方案。
  5. Comparing with the same category overseas jointless bridges, the new type bridge has more reasonable structure, more simple and convenient construction, and better use effect etc. the main work in this paper is described as follows : ( 1 ) this paper introduces phylogeny and reseach survey of the joints bridge inland and abroad, and a new jointless bridge structure ? new type semi - integral abutment bridge is based on these, which characteristic of own structure and setting of primary component are expatiated. ( 2 ) this paper analyses influence of temperature effect, creep, shrinkage and circumambient soil of run - on slab on the new type structure, and analyses the forcing performance of beam, abutment and run - on slab of the new type semi - integral abutment bridge, and constrast to the same category joints bridges

    本文主要做了以下工作: ( 1 )介紹了無縫橋在國內外的發展歷史、研究概,並在此基礎上提出了一種新的無縫橋結構形式-新型半整體式無縫橋,闡述了它特有的結構形式以及主要構件的設置; ( 2 )分析了溫度效應、徐變和收縮以及搭板周圍土體對這種新型結構的影響,對新型半整體式無縫橋主、橋臺以及搭板進行了受力性能分析,並和同類無縫橋進行了對比分析。
  6. Additional crosswise reinforceing steel in reinforced concrete beams of indirect loading

    在間接加載情下附加橫向鋼筋設計探討
  7. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液壓起立,減少了輔助作業時間。
  8. Paragraph of time, the physical - training teacher educating a branch to organize implement new class bid to middle and primary school reforming condition making an investigation, indicate on inquiry in the front, scale is small since a little school running a school, a little rural area elementary school, does not move space especially, be not enough to pay attention to waiting a minute or to physical training, do not have very good according to that new class switches over to demand to open enough physical education, since entering the higher school the system restraint, a little school defies student sports activities and good health, physical education birthplace having some of higher class with the method of work " resorting to fraudulence ", go ahead culture class within outside row physical education, at present major middle and primary school stadium field layout, equipment and material facilities are obsolete, short - supplied, foundation has no way to ensure that regular sports of school is flexible carrying out, is difficult to say material request adapting to new class more

    前段時間,教育部門組織體育教師對中小學實施新課標改革情進行調查,調查表明,一些學校由於辦學規模小,特別是一些農村小學,沒有運動場地,或者對體育鍛煉不夠重視等等,沒有很好地按照新課改要求開足體育課,由於升學制度的制約,一些學校無視學生體育活動和身體健康,有些高年級的體育課貫用「偷換柱」的做法,外排體育課,內上文化課,目前多數中小學體育場地布局、器材設施陳舊、緊缺,根本無法保證學校正常的體育活動的開展,更難以說適應新課材的要求。
  9. Comparing the results of one irregular box beam obtained by the gridiron method to that by fem, the characteristics of the application scope, merits and drawbacks of the gridiron method are convinced. it is shown that the gridiron method underestimates the results in contrast to fem when analyzing irregular box beams

    對上德立交橋中的一聯異形箱通過不同的方法以及試驗進行分析和計算,詳細地說明了異形箱設計中常常使用的格法的適用情和實際的效果。
  10. And results are : ( 1 ) analyze the force and distortion on pipeline under collapse and gulch in theory. on the base of beam deformation, analyze the bending moment and deformation of pipeline with frusta and without frusta. calculate a true problem, contrast the differences between pipeline with frusta and one without frusta, draw some conclusions

    得到的主要結果為: ( 1 )基於彈性地基理論和彈性的撓曲線理論,給出了管道在固定墩(相當跨越河溝情)和無固定墩(相當坍塌和沖溝情)的變形微分方程,並分析了當量軸力為拉力或壓力時管道的變形和受力情
  11. Some effective measures were presented to solve bigger prestress loss of mid span in overlong frame and it is suggested that prestressed reinforcement with curve linetype should be adopted in slabs if possible

    在次與板中為有效利用無粘結預應力筋,建議在板厚許可的情下盡量採用曲線形預應力筋。
  12. Sliding displacement of beam longitudinal bars in staggered joints is smaller than in ordinary joints, and the beam bar " overstrength in staggered joints is more serious than in ordinary joints when shear force is equal in the two types of joints

    2在節點所受剪力相同的情下,錯層節點中縱筋的粘結滑移比普通節點的要小,筋的超強更嚴重。
  13. In china because the bridge building has been expanded to the mouth of the rivers and the sea banks, there is an increased number of the ship - against - bridges accidents. so it is necessary to make further related researches on the ship - against - bridges accidents in the conditions of increased potential ship - against - bridges risks

    在我國船撞橋事故數量不斷增加、跨越河海超大跨度橋不斷發展、船撞橋的潛在風險越來越大的情下,深入開展有關研究是十分必要的。
  14. Analysis on fracture of steel skein used for wire rope of bridge tie bar

    系桿鋼索中鋼絞線斷裂情剖析
  15. Here the hsc of sompa is achieved through adding super - effective water reducer, fined slag and silicon fume, and decreasing the water / cement ratio. by varying the area ( spacing ) of tension bars, compressive bars, vertical links and distribution steel and embedding steel fiber and polypropylene fiber we try to improve the behaviors of reinforced high performance concrete one - way spanning slabs in bending, so that its ductility be greater than 5. with the same arrangement of steel the width of bending member is varied to observe the effect of the width / depth ratio on the ultimate compressive strain of concrete

    通過變化受拉筋含筋率和受壓筋、箍筋(鉤筋、分佈筋)含量,或摻加纖維使之成為鋼纖維高強混凝土( sfrhsc )和聚丙烯纖維高強混凝土( pfrhsc ) ,對高強混凝土雙筋截面、板的受彎性能進行了試驗研究,試圖改善高強混凝土受彎構件的延性,使其延性比大於5 ;並在相同配筋情下,通過變化截面寬度,研究了高強混凝土受彎構件的寬高比對壓區混凝土極限應變的影響;並對試驗構件的裂縫發展情進行了觀測。
  16. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫不滿足要求,肋拱連系普遍不滿足要求;計入水平橫槽向地震作用的工為設計控制工
  17. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情,對於五跨拱組合橋各孔跨合理的跨度比、疊拱的受力行為及連續系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續系桿的剛度和應力情、鋼管混凝土拱的應力情
  18. This paper deduces the equation groups of large span steel truss bridge which installed mr dampers of coupling vibration of vehicles and bridge. and provide the two strategies of semi - active control

    本文從理論上首次推導出設置擬阻尼器的大跨度鋼析架橋車橋禍合振動的系統受控方程並提出了兩種控制策略。
  19. Through the dry and wet cycling experiment on unmarred beam and pre - cracked beam, the position of initial corrosion and influence of crack on the reinforcing bar corrosion are studied in this paper both the flexural bearing capacity performance and the material mechanical performance of the beams are studied on the test of full scale concrete beam a model of 3d fem is established to simulate the state of the actual full - sized rc beam and electronic accelerating test beams, computational results and test results are compared

    通過對混凝土的干濕循環試驗,研究了在混凝土中的鋼筋初始銹蝕情,以及不同寬度的裂縫對于鋼筋初始銹蝕的影響。通過對足尺銹蝕混凝土的試驗,研究了混凝土在海洋環境侵蝕作用下的材料性能的變化和抗彎承載能力的變化。
  20. This paper mainly researches dilapidation condition of beam, slab and column, distributing and size of crack, joint of beam and column, joint of beam and slab, the load distributing condition of beam, sheet and column through general investigation of beam, broad and column, accessorial system, maintenance structure of frame structure of someone workshop

    首先,對廠房框架結構的、板、柱、附屬系統、圍護結構等進行調查,主要調查了、板、柱的裂縫及其他破損情與柱及與板的連接,廠房平臺的荷載分佈情
分享友人