泥敷 的英文怎麼說

中文拼音 []
泥敷 英文
fango compress
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ動詞1. (搽上; 塗上) apply 2. (鋪開; 擺開) spread; lay out 3. (夠; 足) be sufficient for Ⅱ名詞(姓氏) a surname
  1. The research results show that, from the viewpoint of second phase morphologies, there exist quite differences between the grain - type materials ( such as wc / bcu brazing deposit material, wrs1000 and 1zt tungsten carbide strengthening overlaying material, as well as the wear - resistant material of polymer adhesive coating etc. ), and the aggregation - type as well as dispersion - type ones ( such as zg35simn, wrd - 1 and khc - k2 depositing material ) in the wear - resistance and sand slurry abrasion mechanism. the sand slurry abrasion mechanisms are brought forward, of new wear - resistant materials with the features of grain - type second phase morphologies

    研究發現,與聚合型、彌散型第二相的材料(如zg35simn 、 wrd ? 1和khc ? k2熔材料等)相比,顆粒型第二相的材料(如wc bcu釬焊熔耐磨材料、 wrs1000型耐磨材料、 1zt碳化鎢顆粒增強熔材料及ktc ? 1耐磨膠粘塗層材料等)在耐磨性能和磨損機理等方面均有不同,總結提出了以「顆粒型第二相」為特徵的耐磨新材料沙磨損機理。
  2. Installation of sheet roof and wall coverings - profiled fibre cement - code of practice

    薄板屋面和墻面塗層.成形纖維水.實施規程
  3. Fibre - cement pipelines - guide for laying and on - site work practices

    纖維水管.設和現場施工指南
  4. Fibre - cement pipelines - guide for laying and on - site work practices ; german version en 1444 : 2000

    纖維水管.設和現場施工指南
  5. Guide for laying of asbestos - cement pipelines

    石棉水管道設指南
  6. We ' re the only salon in los angeles that does the hijiki herbal claywrap

    我們是洛杉磯唯一一家用羊棲菜草藥做泥敷的沙龍
  7. Ask dr chan how to handle by using “ perfect ten treatment ” daily. only 3 days after in the knee with the “ perfect ten ” it show amazing changes, 5 days time restore to originals completely

    到盛富麗公司問老師如何處理,老師給建議每天用千面泥敷到膝蓋只短短的3天明顯改變, 5天時間已經完全復原。
  8. In the sandy layer, the soil composition gradually increases and a ku - lau rock rock formed by coral fossil structure appeared lying in the south - north direction. the ku - lau rocks were structured with the bricks lying in the east - west direction

    沙土層內,土壤質逐漸增加,出現南北向咕?石結構,與東西向磚塊堆積結構,其中咕?石表現先上白灰,其次再為水
  9. Based on the technical requirements of manufacture, application and repair of the pump shell and cutter piece of the cutterhead pipeline dredge, put forward are the re - manufacture three principles on easily damaged workpieces of dredge engineering. with the inter - clamped structures on the pump liners, the gradient wear - resisting design on the cutter piece, and the new techniques in the process of re - manufacture, new wear - resistant materials, including high - cr alloy, overlaying and brazing deposits, and polymer adhesive coatings have been successfully applied to the re - manufacture dredge pump shell and cutter piece. the application results show that their wear - resistant lifetimes and the dredging profits have been increased remarkably

    根據絞吸挖泵絞刀的製造、使用和修復性能要求,提出了疏浚工程易損件再製造三原則;採用泵內襯互鎖結構、絞刀梯度化耐磨設計和工藝再製造新技術,將高鉻合金耐磨材料、熔耐磨材料及其復合材料和高分子耐磨膠粘塗層材料成功地應用於再製造泵殼和絞刀片上,顯著提高了泵殼和絞刀的耐磨壽命和挖船的疏浚效益。
  10. For the aged or sensitive skin you may spread a layer of essence cream firstly, and spray water to moisten

    如皮膚太過老化或敏感的可先用精華霜打底,並於過程中適量噴水,保持濕潤。
  11. Standard specification for crack filler, hot - applied, for asphalt concrete and portland cement concrete pavements

    瀝青混凝土和普通水凝固設路面用加熱粉碎填充料的標準規范
  12. Process of cement mortar lining with coating machine on the inside surface of steel pipes

    鋼質管道水砂漿村裡塗機塗工藝
分享友人