洪善 的英文怎麼說

中文拼音 [hóngshàn]
洪善 英文
hongshan
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ形容詞1 (善良; 慈善) good 2 (良好) satisfactory; good 3 (友好; 和好) kind ; friendly 4 (...
  1. Six foundation works : first, projects to prevent flood, avoiding huai river overflow again ; second, projects of comprehensive traffic, perfecting the highway, railway, waterway and aviating traffic network ; third, ecological environmental protection project to improve peoples living conditions and strengthen environmental ecological construction progressively ; fourth, construction of " digital fuyang ", realizing datamation of product design, automation of production process, and electronization of commercial market ; fifth, sincere project of fuyang, advancing all kinds of sincere institutional improvement of same trade, forming morals based on sincerity, and personal integrity ; sixth, talents market project, developing human resources diversely

    六項基礎工程:一是防保安工程,切實根除淮河心腹之患;二是綜合交通工程,完公、鐵、水、空綜合交通網路;三是生態環保工程,改人居生活條件,加強環境生態建設;四是數字阜陽工程, .逐步實現產品設計數據化、生產過程自動化、營銷商務電子化;五是誠信阜陽工程,推進各類同業誠信制度建設,形成誠信為本、操守為重的社會風尚;六是人才強市工程,多方位開發人力資源。
  2. The dissertion, after introducing physical geography situation and societal economic sitiuation of chongqing, has also analysed the basic feature of water resources in chongqing, at present the water resources utilization in chongqing is still in traditional phase. there are so many faults and shortcomings in water resources management system. the construction of water resources institutions and regulations is fallen behind. the supply of water resoures has not sufficiently satisfied the demand to water resources. the condition of water quality has not radically improved. soil losses is still serious. the incidence of flood and drought is very high. in accordance with present condition of water resources utilization in chongqing, the dissertion argues that it should strengthen people ' s understanding to water resources sustainable utilization for chongqing ; reform the present water rexources management system and have a try on water affairs management system in chongqing ; make effort to construction of water resources " institutions and regulations ; realize demand management, constuct save - water model society ; according to actual condition, strength water utilization constrution, then realize the balance between water resources supply and demand ; according to the idea of " control resources, conduct flow ", control water pollution, realize sanitary generation ; control soil losses and protect water enviroment ; construc t the system of flood control and diaster prevent

    在對重慶市的自然地理情況和社會經濟情況作了介紹之後,還分析了重慶市水資源的基本特徵,目前重慶市的水資源利用還處在傳統的開發利用階段,水資源管理體制還存在許多弊端,水的法規制度建設也相對落後,水的供給還不能完全滿足需求,水質狀況沒有得到根本性的改,水土流失還很嚴重,水旱災害發生的頻率比較高。針對重慶市水資源利用的現狀,本文提出:應加強對水資源持續利用的認識;改革目前重慶市的水管理體制,嘗試水務局管理體制,相應加強水的法規和制度建設,實現需水管理,建立節水型社會;根據實際情況,加強水利建設,實現水的供需平衡;依據「控源導流」的思想控制水污染,實現清潔生產;治理水土流失,保護水環境;建設防減災體系。
  3. Mr esmond lee, deputy director of environmental protection centre left, meets mr yue ruisheng, deputy director general of sepa centre right and mr meng jianhong, second secretary of ministry of the foreign affairs third from right, in beijing in september 2005 to discuss the preparation of the draft hong kong implementation plan for the stockholm convention

    環保署副署長李忠先生左中於2005年9月在北京與國家環境保護總局副司長岳瑞生先生右中及外交部孟建二等秘書右三會晤,共商編制斯德哥爾摩公約香港實施方案草擬稿的有關事宜。
  4. The problem of uniqueness of meromorphic functions concerning the multipliable value is discussed. some uniqueness theorems are obtained, generalizes and improves the work of yang c. c and the work of fang m. l. the problem of uniqueness of meromorphic functions that sharing one pair of value im with their differential polynomials is studied and pefects present conclusion

    主要研究了亞純函數分擔一個或者兩個公共值集的情形,對f . gross問題做了進一步討論,得到的幾個定理推廣改進了儀勛、方明亮等的結果;在涉及重值的情況下,討論了im分擔一個值的亞純函數的唯一性問題,所得結果改進楊重駿、方明亮等的工作;同時本文對涉及微分多項式的亞純函數im分擔一對值的唯一性問題也做研究,完了現有的一些結論。
  5. And the resuits are as follows : the main hazards in rural area were flood, water - logging, landslide and debris flow, whereas water - logging in cities ; the catastrophe was caused by the natural factors including the heavy rain due to the strong tropical storm, the mountainous terrain conditions in xiangjiang river basin, and the man - made factors including unreasonable project construction, the imperfect disaster warning mechanism, the weak consciousness on disaster prevention and the unperfect disaster risk transfer mechanism etc

    結果表明:農村的主要致災因子是水、內澇、滑坡、泥石流,而城市主要為內澇;此次巨災是在強熱帶風暴引發的暴雨、湘江流域中上游多山的地形條件等自然因素,和工程建設不合理、災害預警機制不夠完、人們防災意識薄弱以及災害風險轉移機制不夠成熟等人為因素的共同作用下導致的。
  6. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  7. Expeditiously improving flood prevention and relief work

    從速改救災工作
  8. The hong kong museum of history acquired the fireboat for its collections, refitting it and opening it to the public in the purpose - built fireboat alexander grantham exhibition gallery

    鑒于葛量號深具歷史意義,香港歷史博物館把它列為藏品,並建設葛量號滅火輪展覽館,妥裝置此滅火輪,開放予市民參觀。
  9. The key objectives of the workshop were to : provide an overview of flash flood prediction capabilities ; identify weak links in establishing operational flash flood warning systems and the ways to fill these gaps ; showcase best practices and case studies ; share knowledge, tools and technology ; present project briefs for establishing or improving flash flood forecasting services ; and open dialogue with donor and finance organizations

    工作坊的主要目的為: i檢視現今暴預報的能力ii辨識業務暴警報系統的弱點和研究改方法iii展示成功的運作模式和案例iv分享知識工具和科技v為建立或改預報服務匯報和倡議計劃vi與資助及撥款機構展開對話。
  10. Therefore a physics - based conceptual model for forecasting in the cold zone of china is established, and the effectiveness of the model has been proved by practical operation in three basins of dunhua, changding and hengdaohezi. finally, for the purpose to popularize the presented model, a software system is completed and some new ideas are created in the system such as the interface design, selection of methods, option and integration of the procedures and so on. the system has been working very well in several basins in the north - east of china

    為使模型能夠得到推廣應用,使研究成果變為生產力,還建成了寒區水文預報軟體系統,在系統的研建過程中,經過反復修改和完,在界面設計、預報方法選擇、預報方案生成和串接、系統的維護擴展、水庫防調度、報汛測站的設置和變動等六個方面具有鮮明特色,使建成的系統具有實用性、通用性、友好性、可擴展性等優點,受到用戶的一致好評。
  11. Later, in october 1976, a cks memorial hall building, preparatory directing committee was established. messrs. chang chun, ho ying - ching, chen li - fu, ni wen - ya, wang yun - wu, yu bin, chien ssu - liang, huang shao - ku, ku cheng - kang, huang chie, lin bo - shou, wu ching - hsiung, lien chen - tung, chen chi - tien, hsu ching - chung, chang bao - shu, hsieh tung - min, sun ya - fu, liu kuo - tsai, dai yen - huei, liu ji - hung, chou bai - lien, tsai hung - wen, lin ting - sheng, and lin yang - kang, were invited to serve as committee directors to oversee construction of the hall

    嗣於六十五年十月成立中正紀念堂籌建指導委員會,敦請張群何應欽陳立夫倪文亞王雲五于斌錢思亮黃少穀穀正綱黃傑林伯壽吳經熊連震東陳啟天徐慶鐘張寶樹謝東閔孫亞夫劉闊才戴炎輝劉季周百練蔡鴻文林挺生林洋港等二十五位先生為指導委員,指導建堂工作,俾臻完
  12. Article 14 local people ' s governments concerned in areas liable to waterlogging such as plains, depressions, river networks and embankment areas, valleys and basins should formulate planning for elimination and control of waterlogging, organize relevant departments and units to take corresponding control measures, improve drainage systems, develop types and varieties of waterlogging - enduring crops and take integrated measures for controlling flood and water logging, drought, saline and alkaline land

    第十四條平原、窪地、水網圩區、山谷、盆地等易澇地區的有關地方人民政府,應當制定除澇治澇規劃,組織有關部門、單位採取相應的治理措施,完排水系統,發展耐澇農作物種類和品種,開展澇、乾旱、鹽堿綜合治理。
  13. The next time the fox met the lion, he was not much so afraid, but he said to himself, “ i wish he would not make such a noise

    異日狐又遇獅子,狐已不如前次恐怖之甚,獨自言曰,余謂獅子無發如此大之聲則矣。
  14. Go and stand amidst their scowling hearts, my child, and let your gentle eyes fall upon them like the forgiving peace of the evening over the strife of the day

    我的孩子,去,去站在他們憤懣的心中,把你的和的眼光落在它們上面,好像那傍晚的寬大量的和平,覆蓋著日間的騷擾一樣。
  15. ( 3 ) the idea suggested in this paper of converting flood into utilizable resource 、 attempering flood by engineering means and supervising human behaviors in the flooded area. to overcome the various barriers arising from ideology 、 systems 、 technology and economy which the establishment of risk management system of flood will be confronted with, this paper also suggests a statistical approach to estimate extremum and the concept of gray - uncertainty risk in figuring flood risk and analyses the severe harmfulness of accidents of extremum risk, furthermore, supplements and perfects present quantity - analyzing method of risk loss

    3 、本文提出水資源化的觀念,以工程手段對水進行調節,以法律、行政、經濟、教育等綜合性的手段對人類在泛區中的行為進行管理,是削弱水的危害性、減輕水風險的有效方式,提高的防安全保障需求,實行水風險管理是必由之路。水風險管理體制的建立必然面臨觀念方面、體制方面、技術方面與經濟方面的重重障礙,並提出災風險評價的極值統計學方法和灰色-隨機風險率的概念,建立了其表達形式與計算方法,它完了現有的風險損失量化方法。
  16. Zhejiang provincial communist party leader zhao hongzhu, governor lv zhushan and minister of communications li shenglin attended the ceremony

    浙江省省委書記趙祝,省長呂祖和交通部部長李盛霖出席了儀式。
  17. Results show that a three - stepwise weight function correction method is effective and applicable and can be spread in other basins. it can eliminate the outlier of rainfall data and improve the accuracy of flood forecast

    計算結果表明,採用雨量觀測誤差三步權函數修正法是有效的,能準確剔除雨量資料的粗差,改雨量資料的合理性,提高水預報的精度。
  18. The events drew an enthusiastic response, as fellow practitioners prepared food and offered items for sale. their loving contributions totaled hk 40, 000 approx. us 5, 128, which were given to the relief organization world vision to purchase food for the flood victims in china

    很多同修都熱烈響應,親自準備食物和捐出物品,經過大家愛心解囊后,共籌得款港幣四萬元合美金5 , 128元,全數捐予世界宣明會,作為購買糧食賑濟大陸水災民之用。
  19. With the stage i and stage ii works completed, the river section downstream of lo wu has been improved to the required flood protection standard of " one in 50 years "

    深圳河治理工程計劃的第i及ii期已完成,羅湖下游一段的河道已獲得改,達到能抵禦五十年一遇暴雨的防標準。
  20. Abstract : by analyzing the changes of incoming water and sediment in the lower weihe river, in allusion to the question of flood discharge capacity being not enough, control project being short, river pattern can ? t being controlled and the management being loose etc, advise to increase the investment, consummate the measures of flood prevention engineering and non - engineering. strengthen the management, consolidate the consciousness of flood prevention and disaster alleviation, in order to raise recent ability of flood prevention in the lower weihe river

    文摘:通過對渭河下游來水來沙變化的分析,針對現狀堤防過能力不足、控導工程少、河勢得不到控制和管理工程等方面存在的問題,提出應加大投入力度,完工程措施和非工程措施,加強管理,強化防減災意識,提高近期渭河下游防能力。
分享友人