洪峰水量 的英文怎麼說

中文拼音 [hóngfēngshuǐliáng]
洪峰水量 英文
peak runoff
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
  1. A flood peak cut coefficient ( ) is proposed to measure the affection of the flood hydrograph for the risk calculating of the flood discharge

    本文分析了過程這一不確定性因素,並用削減系數將過程的不確定性化。
  2. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,庫產生泥沙異重流的機率較大,能否運動到壩前排出庫外,還要看異重流潛入點位置、入庫流歷時、入庫含沙庫閘門運用等因素,需要做好異重流預報監測工作。
  3. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙均滯後於的35場,對沙滯後於的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙滯后時間與上站、沙含沙傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙滯后時間,為下游各站沙傳播時間的準確預報提供依據。
  4. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取工程的布設要考慮工程所處河段的地質文等諸多因素。如該河段上下游庫的庫容,泄、河道沖刷、淤積、河床形態、流形態、冰塞、河段上游的支流匯入、、沙的大小、河道行能力的大小、周圍防工程的影響及對周圍環境和第三人合法權益的影響等等。
  5. Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing

    當前污泵站排放系統主要採用人工值守方式排,低位高揚程耗能嚴重,且缺乏預測能力,流來臨時易產生污溢出污染。
  6. The probability density function of net rainfall relative errors, flood peak discharge relative errors and the time error of the forecasted flood peak are calculated by the model developed

    通過建立預報誤差分佈的最大摘模型,計算出9座典型預報的凈雨相對誤差、相對誤差和現時間預報誤差的概率密度函數,並將其概率密度函數曲線與正態分佈曲線進行比較。
  7. In this model, the peak of flood, flood total outflow and flood process are to be considered. a calculation program with monte - carlo method and a simplified method for calculating diversion risk are suggested

    在該模型中,可考慮文中的過程的不確定性及力的不確定性,提出了用monte - carlo方法計算施工導流風險的步驟和用近似法計算施工導流風險的方法。
  8. It is verified by the observed data of xianing port area in changsha city that the model is of high accuracy, with the greatest relative error of the peak flow of only 7. 85 %, thus can be used in runoff simulation of harbor rainfall drainage system

    經長沙市霞凝港區的實測資料檢驗,證明該模型在港區小流域的雨分析中有較高的精度,最大相對誤差僅為7 . 85 % ,可用於港區雨的徑流模擬。
  9. The velocity of flood propagation was great and flood deformation was slightly when flood peak increase to bank full discharge. as the discharge increased to 2 - 2. 5 times of bank full discharge the velocity reduced to the lowest value and the greatest flood deformation occurred

    接近平灘流傳播速度最快,變形最小,當約是平灘流的2 2 . 5倍時,傳播速度最慢,變形最大。
  10. Results showed, taking jia - lu - he catchment as example, that the integrated control of soil and water loess could reduce the flood - peak flow and flood water amount, that the flow process has been prolonged and that the peak flow was postponed

    提出了土流失綜合治理對大中流域暴雨影響的研究方法。以佳蘆河為例,分析表明:土流失綜合治理使暴雨降低,過程持續時間延長,滯后。
  11. The formula of calculating flood peak at downstream stations according to upstream flood peak at hydrometer station was proposed in this research. in the formula river boundary and flood type factors etc. were main factors and the formula can reflect the impacting factors of flood deformation

    報告給出了由上游文站計算下游站的計算公式,公式包含有河道條件和型因子,較全面地反映了影響變形的因素。
  12. Ii ) runoff erosivity reflects relationship of water erosion forces and sediment yield more directly than rainfall erosivity. it intergrated ability of runoff volume and flood peak on detaching soil and transporting sediment and is more reasonable than single runoff depth or flood peak volume

    ( 2 )以徑流侵蝕力代替降雨侵蝕力來反映蝕營力與產沙的關系更加直接,而且綜合了徑流在剝蝕土壤和搬運泥沙能力,比單獨運用徑流深或更加合理。
  13. The objective of the optimal model is to keep the flood process mode similar and subject to restrictions of the actual peak flow discharge and flood volume in different period of time, the ga and prsaa that have global optimal capabilities are used to solve the model in this paper

    在滿足約束和分時段約束條件下,本文建立了以過程模式盡相似為目標的過程放大優化模型,並採用具有全局搜索能力的遺傳演算法和并行組合模擬退火演算法求解該模型。
  14. The simulative calculation results show that all the three measures mentioned herein have larger effects on the infiltration, runoff, flood peak flow and overland flow and can greatly alleviate the pressure of the draining pipeline, clip the flood peak and increase the infiltration as well, if they are taken as the additional important measures of urban drainage for flood control

    模擬計算的結果顯示,以上3種方式對入滲、徑流、、坡面流等均有較大影響,作為城市防的重要輔助措施,可以極大地緩解排管道壓力,同時削減、增加入滲。
  15. From the case study, it can be seen that the results of two algorithms can satisfy the restrictions of the actual peak flood discharge and flood volume and keep the mode of the typical flood effectively and avoid the manual randomicity

    通過實例計算可以看出,這兩種演算法計算結果均能較好的滿足約束要求,並有效保持了典型的模式,避免了人工修勻的任意性。
  16. The paper analyzes and summarizes the following laws of distinctive sediment yield produced in storm floods of the region based on predecessors ' study : storm is the main dynamic force of erosive sediment yield and storm, flood and sediment exist an inevitable relation ; the flood occurring time is concentrated with high peaks and huge volume, suddenly rising and suddenly falling and has decisive influence to the formation of a major flood peak in the middle yellow river ; the main reasons of concentrated coarse sediment of the river is severe erosive sediment yield, strong sediment transporting capacity and high sediment concentration ; the important influence of frequent or continued storm floods happened in he - long reach especially in coarse sediment concentrated region to the sediment transport of the yellow river and ; along with the increase of harnessing, regional flood trend is becoming smaller but the variation of sediment quantity is not obvious and the reaction of peak discharge and flood runoff of majority tributaries are not sensitive, showing that a general and normal engineering works can not effectively control regional major floods especially the sediment of an extraordinary flood

    摘要在前人研究的基礎上分析總結了該區特有的暴雨產沙規律:暴雨是侵蝕產沙的主要動力,暴雨、、泥沙之間存在著必然的關系;發生時間集中,大,暴漲暴落,對黃河中游大的形成具有決定性影響;侵蝕產沙強烈而粗泥沙集中,輸沙能力強,含沙高,是黃河粗泥沙的集中來源地;河龍區間特別是粗泥沙集中來源區頻繁或連續的暴雨對黃河輸沙有重要影響;隨著治理平的提高,區域有減小趨勢,但泥沙變化不明顯,大部分支流的反應不敏感,說明一般規模和平的治理工程還不能有效控制區域大特別是特大的泥沙。
  17. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    堵江潰壩及涌浪研究結果表明,局部的邊坡失穩在壩址處引起的涌浪高達6m ,並可能形成高約33m的滑坡堵江壩,潰決將在金江至溪洛渡河段形成15841 7613m ~ 3 / s的,使得此段江位上漲11 4m 。
  18. So a new method ? scale analysis method ( or called fractal analysis method ) is applied to study the flood of jialing river basin. the scaling hypotheses is applied to the relationship of annual maximum flood and drainage area. and basing on the scaling lognormal model with two parameters introduced by smith, a lognormal model with three parameters of flood is introduced to represent the scale effect of drainage area in annual flood peak distributions

    區域分析中一般採用指標法,但該法的基本假定與實際情況存在矛盾,因此本文採用一種新的分析方法? ?標度分析法(或稱為分形分析法)來研究的區域變化,將標度不變性引入年最大? ?匯流面積關系中,並將其用於嘉陵江流域的,另外,本文在smith提出的具有標度性質的二參數對數正態分佈模型基礎上創造性地提出了三參數對數正態分佈模型來表徵年最大分佈中匯流面積的尺度影響。
  19. On the basis of the analysis on the yangtze vole ' s disaster history and condition in dongting lake area, the influence of the lake beach ' s environmental evolution on the vole disaster is studicd in this paper. the rise of low - middle - level beach area causes the vole ' s population explosion, the reduction of high - level beach area forces the voles into the farmland during the flood season, and the emergence period ' s continual increase extends the vole ' s habitat areas and forces them to migrate into the farmland. the discarded dike provides a rest place halfway for the voles, which escape the flood, and the natural enemies of the voles, which are a natural barrier against the vole ' s population expansion, decreases. according to this study, the conclusions are put for ward as follows : after three - gorge project ' s construction it will produce great influences on the beach evolution in dongting lake area, leading to the changes of the vole ' s ecological environment situation and resulting in the vole ' s population changes which deserves attention

    在分析洞庭湖區東方田鼠暴發成災史及災情的基礎上,研究了洞庭湖區洲灘演變對東方田鼠暴發成災的影響.研究認為,中低位洲灘出露面積不斷增大使東方田鼠種群迅速膨脹,高位洲灘出露面積減小造成汛期東方田鼠大向垸內農田遷移;湖區洲灘冬春季連續出露天數增加延長了東方田鼠的繁殖期;汛期位增高,洲灘大面積淹沒迫使東方田鼠大遷向垸內;湖內廢棄湖堤為東方田鼠逃避提供了中途休養之地;洲灘地抑制東方田鼠種群膨脹的天敵數已大大減少.據此,本文指出,三峽工程建成后將對洞庭湖區洲灘演變產生重大影響,因而將改變東方田鼠種群生態環境條件,引起種群動態變化,值得注意
  20. In the past years, people generally considered that the effect of the uncertainty of the flood hydrograph is not the main reason that result in the flood discharge risk and even ignore its effect. in the paper, this factor is take into account during analyzing and calculating flood discharge risk

    在已有的對施工導流及泄風險的研究中,人們普遍認為文因子中的的不確定性是造成風險的主要風險因素,認為過程的不確定性所帶來的影響很小,可以忽略不計。
分享友人