洪峰 的英文怎麼說

中文拼音 [hóngfēng]
洪峰 英文
flood peak; flood crest; the high point of a flood洪峰流量 peak discharge; peak flow
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  1. There are a lot of factors that work on the water level of erodible - bed channel together, each of them varies no role, but is correlative. in the adjacent years or the adjacent flood peak of a floodwater, the conditions of the factors that influence water level are always very different. so, there is a nonlinear relation between water level and the factors influencing it

    沖淤河道水位受到很多因素的共同作用,各因素本身的變化沒有規律且互相關聯,相鄰前後年份或同一場水的不同洪峰前後,影響水位的水、沙、河道等因素常差別很大,水位與其影響因素之間客觀上是非線性關系。
  2. This plan was well designed in accordance with the geographic features of suzhou new district. this area receives the flood of the upper reaches from the grand canal, pased by the flood from the western hills and accepted the local rainstorm run off at the same time. 3

    3 . 《蘇州市長江防工程規劃》蘇州境內的長江位於長江河口段,同時受到洪峰、高潮和臺風的影響,尤以三者同時遭遇,危害最大。
  3. A flood peak cut coefficient ( ) is proposed to measure the affection of the flood hydrograph for the risk calculating of the flood discharge

    本文分析了水過程這一不確定性因素,並用洪峰削減系數將水過程的不確定性量化。
  4. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,水庫產生泥沙異重流的機率較大,能否運動到壩前排出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。
  5. Just as many people had begun to feel an indifference toward the annual rise of the rivers above the danger mark, the lives and property of 200 million people came under serious threat from relentless floods that grew to be the worst in chinese history

    中國水災,年年都有,大家也開始覺得麻木。但今年水來勢甚兇,是有史以來最嚴重的一次,約二億人民的生命及財產受到嚴重威脅。洪峰一個緊接一個,一波未平,一波又起,災情不斷告急。
  6. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙均滯後於洪峰的35場水,對沙滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙滯后時間與上站洪峰流量、沙含沙量、水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙滯后時間,為下游各站沙傳播時間的準確預報提供依據。
  7. In addition according to the comparison of typical floods the impact of floodplain morphology to the flood propagation was studied. no continuous water body in main channel and floodplain and the change of floodplain morphology and the increased flood detention capacity caused the time of flood propagation increasing and the flood types changing in abnormally

    同時通過對典型水的對比分析,研究了灘地邊界條件對水運行的影響,認識到由於主槽與灘地水體不連續以及灘地地形的改變,灘地蓄能力增大,造成水傳播時間增長和洪峰型的異常變化。
  8. Terraces on slope land delete the conditions of causing soil and water loss. ponds, cistens, water cellars enhance surface water use efficiency, warping dams can store flood, decrease flood peak, retain sediment, and conserve water

    坡地修梯田消除了產生水土流失的條件,蓄水池、旱井、水窯提高了對地表水資源的利用率,淤地壩具有蓄水、削洪峰、攔泥沙、涵養水源的作用。
  9. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布設要考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫的庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、沙的大小、河道行能力的大小、周圍防工程的影響及對周圍環境和第三人合法權益的影響等等。
  10. Tidal flow operation

    洪峰車流作業方式
  11. Long - term prediction of annual maximum peak discharge at yangtze three gorges based on artificial neural network

    基於人工神經網路的長江三峽年最大洪峰流量長期預報
  12. Some critics believe sedimentation is growing at a faster rate, which could eventually make the dam unable to contain a flood crest

    不過有意見認為,泥沙淤積的速度在加快,並最終會導致大壩無法承受洪峰
  13. The yarkant river flood dynamic rule is extremely complex, extremely high rises the speed by it, the unusual high flood peak value is world famous

    摘要葉爾羌河水動態規律極為復雜,以其極高的起漲速率、異常的高洪峰值聞名於世。
  14. Officials announced on aug. 1 that the crest passed through the dam without incident, crediting the structure for taming it for the river ' s lower reaches

    8月1日政府宣布洪峰安全通過三峽大壩,並將長江中、下游地區的安瀾歸功于大壩的防功能。
  15. But “ letter - pleaing flood ” that has risen continuously since middle period of the 1990s last century, has become the important factor of influencing the social stability

    但自上世紀90年代中期以來持續上升的「信訪洪峰」 ,成為影響社會穩定的重要因素。
  16. Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing

    當前污水泵站排放系統主要採用人工值守方式排水,低水位高揚程耗能嚴重,且缺乏預測能力,流量洪峰來臨時易產生污水溢出污染。
  17. Continuous downpour on the upper reaches of the yangtze river has resulted in this year ' s heaviest flood, with 3, 3000 cubic meters of water flowing into the three gorges reservior every second

    這幾日連續不斷的傾盆大雨使得揚子江上遊河段區域迎來了今年洪峰,平均每一秒就有大概3 , 3000立方米的水流進三峽大壩的貯水池。
  18. Rain in central henan province, in the upper reaches of the river, is pushing the third flood peak of the year towards wangjiaba, a crucial hydrological station in anhui, the local drought prevention and flood control office said yesterday

    當地抗旱防汛辦公室昨天說:河南省中部地區普降大暴雨.在長江上游,會推動第三次洪峰侵襲安徽省重要的王家壩水文站
  19. The probability density function of net rainfall relative errors, flood peak discharge relative errors and the time error of the forecasted flood peak are calculated by the model developed

    通過建立水預報誤差分佈的最大摘模型,計算出9座典型水庫水預報的凈雨相對誤差、洪峰流量相對誤差和現時間預報誤差的概率密度函數,並將其概率密度函數曲線與正態分佈曲線進行比較。
  20. In this model, the peak of flood, flood total outflow and flood process are to be considered. a calculation program with monte - carlo method and a simplified method for calculating diversion risk are suggested

    在該模型中,可考慮水文中的洪峰流量、水總量和水過程的不確定性及水力的不確定性,提出了用monte - carlo方法計算施工導流風險的步驟和用近似法計算施工導流風險的方法。
分享友人