洪水水量 的英文怎麼說

中文拼音 [hóngshuǐshuǐliáng]
洪水水量 英文
flood volume
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  • 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
  1. Towards the research on two flood water of yuhe river in datong city during 2004, by measuring and comparing their discharge, sediment concentration 、 nutrient include organic, phosphorus, potassium, azote, the result shows that the nutrient content of the sediment is greatly larger than that of supernatant fluid

    摘要以2004年大同市御河乾渠兩場為研究對象,對其流、含沙、養分(包括有機質,氮,磷,鉀)做了測定和比較,研究結果表明:中下層泥沙中的養分含遠大於上清液中的養分含中整體養分含隨著含沙的增大而增大,並且養分含和含沙呈近似線性關系。
  2. Also to get some new conclusion of glacial lakes burst floods, in possibility study of glacial lake burst, and in qualitified study of the safety of the glacial lakes. the first character of this paper introduce the background of this paper, set the goal, content and methodlogy of the study work in this paper. the second chapter of this paper focuses on the meterological character, runoff composition character, why not correspondency of ratio of rainfall and runoff in same period to annual value for nianchu river, lasha river, niyang river and the middle reach of yalu - zangbu river

    本文第一章介紹了課題的研究背景,提出了研究目標、內容和方法;第二章重點分析了年楚河、拉薩河、尼洋河和雅魯藏布江幹流中游段的氣候特徵,徑流組成特性,同期降、徑流占年總比例的不對應特性和原因,徑流年內年際變化規律及徑流深分佈特性,分析了天然的特點和參數;第三章介紹了冰川終磧湖的特點,結合已經發生潰決的冰川終磧湖的有關調查資料和考察資料,分析提出了危險冰湖判別指標和發生潰決的氣候條件、周期性特徵,提出了冰湖潰決的計算途徑。
  3. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計及其相應位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和比降的確定原則,並介紹了三日降雨法。
  4. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河位的沙因素,及僅用沙因素有效研究位的可行性,並按變對應思想採集它們的相應數據;其次,由於相應位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類相應位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應位過程的擬合誤差都較小;最後,明確黃河下游含沙位的主要影響方式,即含沙主要是與其它因素聯合對位作用;另外分析了要實現變動河床位過程準確預報的困難所在及改進方向。
  5. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長江大后開始實施的「平垸行,退田還湖」的土地利用調整方案,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長江中游地區應積極推進農業現代化,提高農業勞動生產率,轉移,減少分蓄區的人口,移民建鎮,對區內的土地要促進其規模經營,由優秀的有文化的農民經營,平時只有少的直接從事農業生產的經營管理人員,農忙時則大地使用季節性合同工或實現機械化,大時退田還湖,減輕長江幹流大的壓力,減少分與特大災時的損失,這樣還可促進避、冬季農業等的發展,也有利於長江中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  6. The flood damage exposes the contradiction between people and flood, population explosion results in that people need more and more land for farming, a lot of flood - plain, flood - plain protection, retarding basin, and ever floodway are occupied by farmers for agricultural purpose. so that major or even middle and small flood can not be smoothly discharged in the river

    這場災暴露了建國以來治淮工作中久而未決的一個問題,即局部地區為了解決人多地少的問題,大侵佔河道行灘地,與爭地,不給出路,使得本已不堪重負的河道,即使是中、小來臨,也處在高位狀況下運行,加劇了中、下游地區的防風險。
  7. A flood peak cut coefficient ( ) is proposed to measure the affection of the flood hydrograph for the risk calculating of the flood discharge

    本文分析了過程這一不確定性因素,並用峰削減系數將過程的不確定性化。
  8. Hydrometry - field measurement of discharge in large rivers and rivers in flood

    文測.大河和的野外測
  9. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮,增大山潮比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、位、河床以及杭州灣北岸深槽的影響
  10. Mathematical model is used to calculate and analyze water line in case of 9 kinds of flood flow levels respectively in reservoir. there are two programs including with enclose tideland for cultivation and without it in every flow level

    利用數學模型分別對9個級進行了庫沿程面線計算分析,每個流級分有圍墾堤和沒有圍墾堤兩個方案。
  11. Under flood conditions, great amounts of topsoil are washed to receiving streams.

    泛濫時,大表層土壤被沖刷到承受的流中。
  12. The efficiency of flood storage by the beach area are various according to the dyke construction standard and river condition in different periods

    經對1935 、 1937 、 1954 、 1958 、 1982年實測資料的分析知,夾灘地區對入黃的滯作用與級大小、過程胖瘦、堤防決溢程度等因素有關。
  13. Volume is # 5 - second book of the cosmic forces of mu - churchward continues to draw conclusions from the ancient documents and lore of mu to present some startling revisionist theories about the age of the earth, the nature of mountains and volcanic processes, the ice age and flood

    卷五? ? 《姆大陸的宇宙力(二) 》一書? ?查斯沃德繼續從遠古文獻和姆大陸的知識去總結,呈現一些有關地球紀元的令人驚訝的修正主義理論,山脈和火山的自然過程,冰河時期和大
  14. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流,大大縮短了設計周期,且精度較高,設計的一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  15. The evaluation results of dike breach risk show the following distributing regularities of the hang river dike breach risk in the lower yellow river : ( 1 ) the dike breach risk increase with the increasing of flood. ( 2 ) dike breach risk decreases with the river types change along channel. ( 3 ) the reaches of greater dike breach risk mainly distribute in wandering reaches

    評價結果表明黃河下游懸河決溢風險具有以下分佈規律: ( 1 )決溢風險隨著的增大而增高; ( 2 )決溢風險隨河型的沿程變化而降低; ( 3 )決溢風險較大的河段集中在游蕩型河段; ( 4 )游蕩型河段南岸的決溢風險相對較高; ( 5 )彎曲型河段北岸決溢風險高於南岸。
  16. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港、計算時段的變化、多口門、多庫容、多閘)的龍口力計算,並進行大方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口力計算,為堵口合龍提供科學依據。
  17. And a scaling lognormal model of flood volume is introduced to represent the affection of temporal scale of duration in annual maximum flood volume distributions

    並提出了的對數正態分佈模型來表徵年最大分佈中歷時的尺度影響。
  18. Lastly, the scaling hypotheses is applied to the relationship of flood volume and duration in this paper. the flood intensity - duration - frequency form is proved based on the temporal scaling property of flood

    最後,本文將標度不變性引入? ?歷時關系中,對大流域年最大隨歷時變化的標度性質行了嘗試性的研究。
  19. All the method hare been proved in project to improve the accuracy of designimy rolume of fold when they are used in practice they will also improve the accruing of any desighmy river - crossing bridge

    上述方法經過工程實際驗證,表明可提高設計的精度,在工程中的應用將提高跨河橋梁設計的精度。
  20. 3. a new runoff forecasting model, based on the combination of genetic algorithm and neural network, is proposed, which integrate with the strongpoint of genetic algorithm and neural network. the accuracy and the speed of runoff forecasting are effectively improved that offered a new method for solving runoff forecasting problem

    3 .提出了基於遺傳演算法的神經網路的預測模型,該模型綜合遺傳演算法和神經網路的優點,有效地提高了預測精度和速度,為預報問題提供了一種新的方法。
分享友人