洪水系列 的英文怎麼說

中文拼音 [hóngshuǐliè]
洪水系列 英文
flood series
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ動1 (排列) arrange; form a line; line up 2 (安排到某類事物之中) list; enter in a list Ⅱ名詞1...
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  • 系列 : succession; series; bank; set; set family; train
  1. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計流量及其相應位的確定方法加以詳細分析。提出有約束不連序的加權優化適線法及適合於黑龍江省的河流粗糙數和比降的確定原則,並介紹了三日降雨量法。
  2. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態率的試驗,通過模型位、比降、流速、出口流量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種力參數偏離的主要物理原因:模型的槽蓄響應和過程時間變化率的響應滯后。
  3. Dynamic control of the limit water level belongs to non - structural measures of reservoir operation. with the analysis of the cause and rule of flood in the catchments and taking advantage of hydrology and metrology information, the operable method can be obtained which not only satisfies the flood prevention but also takes full advantage of flood resources, and the upper and lower limits of the limit water level are determined with serial hydrology calculation. then, the rule of using the upper and lower limits is put forward to reach a beneficial flood operation with small risk

    汛限位動態控制方法屬於庫風險調度的非工程措施范疇,通過分析流域的成因和庫區降雨及致規律,結合庫的蓄泄能力,積極慎重的利用文氣象預報信息,研究既能滿足防要求,又可充分利用資源的可操作性的調度方法,利用的連續演算方式推求汛限位的變化范圍,提出使用汛限位上下限的原則,達到風險較小、效益較大的目的。
  4. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山電站溢道進渠流態、提高泄流能力,通過一試驗優化了溢道引渠左導墻頭部曲線型式。
  5. Flood series consistency assessment for letan hydropower station

    樂灘電站洪水系列一致性評價
  6. In the second part, we choose four stations on the basin which up the long - tan dam - site, and estimate a multidimensional auto regression model to model the daily discharge. then test the model and the simulate effect of the modified flood series

    第二篇中選擇龍灘壩址以上流域的四個站,通過建立多維自回歸模型對其日流量進行隨機模擬,然後對模型和模擬生成的洪水系列進行模擬效果檢驗。
  7. The main results of this paper are as follows : ( 1 ) the operation chart for individual and associated operation of new and old units, is plotted by using series of multiyears flows and the associated charts is advised to direct the reservoir operation. ( 2 ) on the basis of analysis on the characteristics of hydro - information observation system and flood forecasting system, some key problems in flood operation such as dispatching period of time, decision - making method and so on are studied. ( 3 ) the study and development of flood - dispatching simulation model

    論文取得的研究成果如下: ( 1 )採用長徑流資料,繪制了新老機組單獨運行和聯合運行調度圖,通過對比分析,建議採用聯合運行調度圖來指導庫運行; ( 2 )在對石泉情測報統和預報統的特點進行分析的基礎上,研究了調度中的幾個關鍵問題,如調度時段、決策方法等; ( 3 )調度模擬模型研究與開發。
  8. Therefor whenever the flood was coming, it is very important that we were prepared to control flood at any moment and safeguard our lives and property and did our best to minimized the damage by some science means, the dss of controlling the flood this paper introduced ought to reflect flood disaster real - timely, list all feasible projects by referring to historic experiences and pre - making plans, find out the optimization of all projects by integrated evaluating for decision maker

    因此,當到來時,作好防準備,採取有效措施,隨時保護人民的生命財產的安全,盡量把損失降低到最低程度,意義十分重大。防決策支持統的建立,必須能為決策者展現災實時的具體情況,參照歷史經驗和預先制定的防預案,出適合當前狀態的全部防方案可行集,利用綜合評價方法求出災損失最小的最優防方案。
  9. Patented closed - loop - cooled ( " clc " ) motor for dry - pit units ( series 9235 ) for continuous operation in non - submerged or flooded conditions

    擁有專利保護的「密封環冷卻」 ( clc )技術的電機,配置在乾井裝置( 9235)上,在無潛狀態或澇狀態下仍然能夠持續運轉。
  10. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通等一研究,提出景電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  11. The plane scale of model was 500, vertical scale was 60 and varied ratio was 8 : 33. the contrast trial. utilizing trial of long series and typical flood test have been conducted

    東莊利樞紐渭河下遊河道動床物理模型選定平面比尺為500 ,垂直比尺為60 ,變率為8 . 33 ,在此模型上進行了庫運用對比試驗、長運用試驗以及典型試驗。
  12. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江利委員會科學研究所從1983 ? 1998年間對飛來峽利樞紐的整體布置、施工導流、泄、通航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一試驗和研究工作,並介紹主要試驗研究成果。
  13. Finally, by using of the mathematical model, it is calculated and predicted the effect of the different tongguan riverbed elevations as well as the different conditions of incoming water and sediment on the variance of the flood elevation and the tend of aggradation and degradation of the lower weihe river bed. it is answered quantitively the lessening extent of sediment silt and the decreasing extent of the flood elevation of the lower weihe river after 14 years on two different incoming water and sediment conditions with three different tongguan elevations, respectively 328m, 327m and 326m. these results supply important references to the planning of flood control and comprehensive regulations of the weihe river basin

    最後用驗證后的數學模型對不同、不同潼關高程( 328m 、 327m 、 326m )下渭河下游的沖淤趨勢和位的變化進行了預測計算,從定量上回答了潼關高程從328m降至327m (相當于潼關高程降1m )和潼關高程從328m降至326m (相當于潼關高程降2m )時,渭河下游14年之後各河段的減淤程度以及不同流量級位的降低幅度,這些成果對于渭河下游防治理規劃的制定具有重要的參考價值。
分享友人