洪水總量 的英文怎麼說
中文拼音 [hóngshuǐzǒngliáng]
洪水總量
英文
flood volume- 洪 : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 總 : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
-
Also to get some new conclusion of glacial lakes burst floods, in possibility study of glacial lake burst, and in qualitified study of the safety of the glacial lakes. the first character of this paper introduce the background of this paper, set the goal, content and methodlogy of the study work in this paper. the second chapter of this paper focuses on the meterological character, runoff composition character, why not correspondency of ratio of rainfall and runoff in same period to annual value for nianchu river, lasha river, niyang river and the middle reach of yalu - zangbu river
本文第一章介紹了課題的研究背景,提出了研究目標、內容和方法;第二章重點分析了年楚河、拉薩河、尼洋河和雅魯藏布江幹流中游段的氣候特徵,徑流組成特性,同期降水、徑流占年總量比例的不對應特性和原因,徑流年內年際變化規律及徑流深分佈特性,分析了天然洪水的特點和洪水參數;第三章介紹了冰川終磧湖的特點,結合已經發生潰決的冰川終磧湖的有關調查資料和考察資料,分析提出了危險冰湖判別指標和發生潰決的氣候條件、周期性特徵,提出了冰湖潰決洪水的計算途徑。Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay
文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水位、河床以及杭州灣北岸深槽的影響In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively
本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。Volume is # 5 - second book of the cosmic forces of mu - churchward continues to draw conclusions from the ancient documents and lore of mu to present some startling revisionist theories about the age of the earth, the nature of mountains and volcanic processes, the ice age and flood
卷五? ? 《姆大陸的宇宙力量(二) 》一書? ?查斯沃德繼續從遠古文獻和姆大陸的知識去總結,呈現一些有關地球紀元的令人驚訝的修正主義理論,山脈和火山的自然過程,冰河時期和大洪水。In this model, the peak of flood, flood total outflow and flood process are to be considered. a calculation program with monte - carlo method and a simplified method for calculating diversion risk are suggested
在該模型中,可考慮水文中的洪峰流量、洪水總量和洪水過程的不確定性及水力的不確定性,提出了用monte - carlo方法計算施工導流風險的步驟和用近似法計算施工導流風險的方法。Results showed, taking jia - lu - he catchment as example, that the integrated control of soil and water loess could reduce the flood - peak flow and flood water amount, that the flow process has been prolonged and that the peak flow was postponed
提出了水土流失綜合治理對大中流域暴雨洪水影響的研究方法。以佳蘆河為例,分析表明:水土流失綜合治理使暴雨洪水的洪峰流量、洪水總量降低,洪水過程持續時間延長,洪峰滯后。Flood storage effect in the beach between yi river and luo river is different from natural condition because of the dykes of the two rivers
伊洛河河道兩岸堤防的存在使夾灘地區的滯洪作用不同於天然滯洪區,它不僅對入黃洪水起滯洪削峰作用,而且對洪水總量還略有削減。The paper analyzes and summarizes the following laws of distinctive sediment yield produced in storm floods of the region based on predecessors ' study : storm is the main dynamic force of erosive sediment yield and storm, flood and sediment exist an inevitable relation ; the flood occurring time is concentrated with high peaks and huge volume, suddenly rising and suddenly falling and has decisive influence to the formation of a major flood peak in the middle yellow river ; the main reasons of concentrated coarse sediment of the river is severe erosive sediment yield, strong sediment transporting capacity and high sediment concentration ; the important influence of frequent or continued storm floods happened in he - long reach especially in coarse sediment concentrated region to the sediment transport of the yellow river and ; along with the increase of harnessing, regional flood trend is becoming smaller but the variation of sediment quantity is not obvious and the reaction of peak discharge and flood runoff of majority tributaries are not sensitive, showing that a general and normal engineering works can not effectively control regional major floods especially the sediment of an extraordinary flood
摘要在前人研究的基礎上分析總結了該區特有的暴雨洪水產沙規律:暴雨是侵蝕產沙的主要動力,暴雨、洪水、泥沙之間存在著必然的關系;洪水發生時間集中,峰高量大,暴漲暴落,對黃河中游大洪峰的形成具有決定性影響;侵蝕產沙強烈而粗泥沙集中,輸沙能力強,洪水含沙量高,是黃河粗泥沙的集中來源地;河龍區間特別是粗泥沙集中來源區頻繁或連續的暴雨洪水對黃河輸沙有重要影響;隨著治理水平的提高,區域洪水有減小趨勢,但泥沙量變化不明顯,大部分支流的洪峰流量、洪水含水量反應不敏感,說明一般規模和水平的治理工程還不能有效控制區域大洪水特別是特大洪水的泥沙。The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious
結果表明,近期隨著水沙條件、潼關高程等的變化及工農業的發展,渭河的水環境發生了巨大變化,表現在年水量及汛期水量銳減;大流量級水流出現次數減少,水量減少幅度大;年輸沙量總體減少,河水含沙量增大,泥沙淤積嚴重;河道向擺動型發展,河道萎縮,河勢惡化;大洪水發生的次數顯著減少,高含沙小洪水明顯增多;同流量洪水位普遍抬高,洪災發生次數增加,洪災加重;水質污染極為嚴重。The model of studying the reservoir deposition is one - dimension and two - dimension embedded mathematical model, which is a one dimensional model study the whole reservoir and the two dimensional model study some important parts of the reservoir by utilizing the one - dimensional model output data. for pushihe lower reservoir, one - dimensional model studies the whole reservoir, and the two - dimensional model study the part of reservoir of 4. 5km in length near the intake of the pump - turbine, to study the layout of the deposition and the and concentration of the suspended load near the intake
在一維數學模型計算中考慮了兩種一、二期工程的銜接方案,每種銜接方案又分別計算了五種降低水位運行的方案,即保持全年庫水位不變、保持汛期庫水位不變、和在洪水來臨時把庫水位降到65 、 64 、 63 、 62米等;每種方案又比較了兩種起調流量( 1000和500m ~ 3 s ) ,總共進行了20個方案的比較計算。It holds the main and tributary streams from six provinces situated at the upper reaches of yangzi river. the three gorges project being built is an extraordinarily gigantic water - control project and has the functions of generating electricity, controlling flood, shipping and travelling
這里正興建當今世界矚目的特大型三峽水電樞紐工程,它具有發電、調洪、航運、旅遊等多種功能,由其構成的水庫總蓄水量近400億立方米。( 4 ) according to analysis of water resources characteristics of the dam system, following conclusions are obtained : amount of yearly available water resources of the dam system presents uncertainty ; water resources utilization by the dam system should focus on fully utilization of rainfall, runoff and flood ; meanwhile, water resources exploration of the dam system should reach the objective of maximum economic benefit in years ; a modeling system for water resources utilization and exploration by the dam system is established on the basis of reasonable investment and above objectives
對壩系水資源的特點進行了深入研究,得出以下結論:壩系水資源年可利用量具有較大的隨機性;開發利用壩系水資源就是充分利用降雨和徑流洪水;壩系水資源開發應以多年經濟效益總體期望值最大為目標。同時引入了最佳水資源投入量的概念,並建立了壩系水資源開發利用模型。Then, the influence of several hydraulic factors on the bedload transport is discussed. it is concluded that the amount of bedload transport is dominated by the runoff discharge in the datong station, and partially influenced by the range of tide
文章進一步分析了各個水力要素對推移質輸沙的影響,發現長江口推移質輸沙總體上受大通流量控制,潮差對于推移質輸沙的影響只有在洪季才變得明顯。分享友人