洪渡河 的英文怎麼說

中文拼音 [hóng]
洪渡河 英文
hongdu he
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ動詞1 (由此岸到彼岸;通過) cross (a river the sea etc ) 2 (渡過) tide over; pull through 3 ...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • 渡河 : cross a river渡河點 point of crossing; 渡河器材 river crossing equipment; 渡河汽艇 cross river boat
  1. By analyzing interval flood and cascade operation characteristics of the upstream yellow river basin, the influence of longyangxia reservoir operation mode in different states on gongboxia power station construction during flood period is studied

    分析區間水特性和黃上游梯級運行特點,針對龍羊峽水庫實際運行狀況,分析不同狀態下的龍庫運行方式對公伯峽水電站的施工汛影響。
  2. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工汛為研究重點,從實施出發,分析黃上游氣候特性和梯級水庫群的實際運行狀況,對施工汛中的主要問題?水流達時間、區間水預報、汛風險、汛期預警、龍羊峽水庫在汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  3. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used for drilling small size water wells and high - pressure jet grouting holes. it has been already widely used in various projects such as water power stations in yunnan, guangxi, sichuan and hubei provinces. it has also become the first priority machine for medium - duty anchoring - reinforcing projects in china

    在雲南小灣廣西灘糯扎及景水電站,長江上游的溪洛水電站向家壩水電站金安橋水電站,烏江上的水電站構皮灘水電站,黃上的拉西瓦水電站公伯峽水電站,雅江上的錦屏水電站已經大量使用, yg - 80型錨固鉆機已成為國內水電站巖土錨固工程中的主力機型。
  4. On the basis of the result of the research on the landslide damming of river, failure of landslide dam, outburst flood and landslide surge, the failure of the part of landslide will arise a maximum surge height to 6m at the dam site, at the same time, the height of landslide dam will reach possibly 33m, and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s, and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river

    堵江潰壩及涌浪研究結果表明,局部的邊坡失穩在壩址處引起的涌浪高達6m ,並可能形成高約33m的滑坡堵江壩,潰決水將在金江至溪洛段形成15841 7613m ~ 3 / s的峰流量,使得此段江水位上漲11 4m 。
分享友人