洪通 的英文怎麼說

中文拼音 [hóngtōng]
洪通 英文
honton
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 通量詞(用於動作)
  1. Humboldt spoke wonderfully of the wonderful, abominable rich.

    堡精闢地談著神廣大而又可惡可恨的有錢人。
  2. Six foundation works : first, projects to prevent flood, avoiding huai river overflow again ; second, projects of comprehensive traffic, perfecting the highway, railway, waterway and aviating traffic network ; third, ecological environmental protection project to improve peoples living conditions and strengthen environmental ecological construction progressively ; fourth, construction of " digital fuyang ", realizing datamation of product design, automation of production process, and electronization of commercial market ; fifth, sincere project of fuyang, advancing all kinds of sincere institutional improvement of same trade, forming morals based on sincerity, and personal integrity ; sixth, talents market project, developing human resources diversely

    六項基礎工程:一是防保安工程,切實根除淮河心腹之患;二是綜合交工程,完善公、鐵、水、空綜合交網路;三是生態環保工程,改善人居生活條件,加強環境生態建設;四是數字阜陽工程, .逐步實現產品設計數據化、生產過程自動化、營銷商務電子化;五是誠信阜陽工程,推進各類同業誠信制度建設,形成誠信為本、操守為重的社會風尚;六是人才強市工程,多方位開發人力資源。
  3. Splays are commonly formed by currents from crevasses in levees.

    嗽叭形堆積常由堤防決口的流所形成。
  4. As for site selection, most villages in the guibei area are sited on flat, sunny and draughty river valleys or sloping fields, which can prevent the villages from being washed out by flood

    桂北的村寨多選址于能防止山沖刷,朝向和風良好的高山陽坡及依傍河谷的平坦地帶。
  5. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游水位變幅較大等環境條件下,貫流式水電站副廠房設置自然風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與形態處理,給出設計實例並初步評價了天井風採光的效果。
  6. Critical precipitation inducing freshet was analyzed and confirmed in this article through the relevant data of mountain torrent disaster and precipitation

    過分析境內發生的山災害及相應降雨資料,計算出不同區域誘發山災害的臨界雨量。
  7. The flood of vituperation rushed on for what seemed an interminable period, while the queen blushed scarlet, the princess burst into tears.

    漫罵的流似乎一直要流瀉個不盡,直弄得皇后滿面紅,公主放聲大哭。
  8. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    過滲流有限元和滲流可靠性分析論證了1998長江流域特大水災害中九江市防護大堤發生的嚴重潰口破壞的滲流破壞機理。分析、比較得出結論:堤防下游坡腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的水條件下九江大堤潰口斷面的抗滲可靠性僅在55左右的非常低水平。
  9. With floodwaters stretching clear across the gulf coast state of tabasco and food and drinking water scarce, health officials warned against cholera and other waterborne diseases

    隨著水繼續侵襲著塔巴斯哥海岸,造成了食物和飲用水的缺乏,健康部知要預防霍亂和其他的水上疾病。
  10. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    過1 : 35比尺的整體泄模型試驗,結合白山已建的建築物及籌建的白山大泵進水口,選定水墊塘的總體布置方案。
  11. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文過試驗研究與理論分析對旋流式豎井泄洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  12. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大壩、堤防、水閘、護岸、抽水站、排水渠系等防工程和水文、信設施以及防汛備用的器材、物料等。
  13. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊溢道為例,計算了溢道上所受的水流荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。
  14. The company also has a bank overseen by the office of thrift supervision ; an insurance unit ; a subsidiary that provides borrowers with loan closing services like appraisals and flood certifications ; and a broker - dealer that trades securities

    它還過海石竹管理機構分支控制一家銀行,一家保險公司以及一家向貸款者提供還貸業務像評估和提供水證明的子公司;一家證券交易所。
  15. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段水導流方案的合理性和經濟性,為施工決策提供理論依據。
  16. Based on the field investigation of relationship between peasant family economy and flood disaster in dongting lake area, hunan province and the socioeconomic statistics from administrative departments and insurance companies, an analysis of family and land economy behavior shows that the fight of family against the flood is mainly constrained by its economic ability. on the one hand, land sustains the pressure from increasing family income, and on the other hand, it sustains the pressure from providing water with some space. therefore, under the condition of providing water with space to full, increasing the economic output rate of per capita land, then increasing the family economic income is of significance to solving the problem of peasant family economy and flood disaster

    過對湖南省洞庭湖區家戶經濟與澇災害關系展開的野外調查,和從行政門部與保險公司獲得的有關社會經濟統計資料.案例資料,進行了農戶經濟行為與土地經濟行為的分析.結果表明.家戶對澇災害的抵禦能力主要受其經濟能力的制約,土地一方面受到來自增加家戶收入的壓力,另一方面受到來自必須給水以一定空間的壓力,所以在盡量滿足給水以一定空間的基礎上,努力提高單位土地的產出率,從而提高家戶的經濟收入,對這一湖區的農民家庭經濟與澇災害問題的解決具有重要意義
  17. These measures include : rehabilitation of vegetation with preserving soil and water on the eroded infertile soils, the entrance to “ soil reservoir ” dredged by controlling with different eroded soil types, using “ soil reservoir ” of the upper reaches of the yangtze river bigger much more than the reservoir of the three gorges

    充分調用「土壤水庫」實現長江流域防減災的措施應包括建立保土保水的地表植被系統,分類整治侵蝕劣地土壤,疏浚入滲「土壤水庫」的道,以及重視調用一個比三峽水庫庫容大得多的「土壤水庫」 。
  18. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年水,對庫區周邊環境的影響較大,因打壩築堤縮小過水斷面和行洪通道造成水庫水位進一步抬升,致使庫區周邊灌區地下水排水不暢,乃至倒灌,型成士地鹽堿化。
  19. Abstract : this paper summarizes a series of tests and inve stigations on general layout, const ruction diversion, flood disposal, navigation, river closure, form of gate opening s ection, pattern of energy dissipation and scouring under sluice carried out for f eilaixia proj ect by the scientific research institute of prwrc during the period from 1983 to 1998 and presents their major results

    文摘:綜合闡述了珠江水利委員會科學研究所從1983 ? 1998年間對飛來峽水利樞紐的整體布置、施工導流、泄航、截流、閘孔斷面形式、閘下消能形式、閘下沖刷等所進行的一系列試驗和研究工作,並介紹主要試驗研究成果。
  20. Article 41 any railway bridge to be built across a water course shall conform to the requirements for flood prevention, navigation and flow of current as laid down by the state in relevant regulations

    第四十一條修建跨越河流的鐵路橋梁,應當符合國家規定的防航和水流的要求。
分享友人