洲頭 的英文怎麼說

中文拼音 [zhōutóu]
洲頭 英文
chau tau
  • : 名詞1. (大陸和附近島嶼的總稱) continent 2. (河流中由沙石、泥土淤積而成的陸地) islet in a river; sandbar
  1. Not all his ammunition was reserved for europe.

    他的進攻箭並非全部對準歐
  2. Elephants, particularly females, are herd creatures and need company, critics have said. but maggie ' s companion, an asian elephant named annabelle, died in 1997

    有批評說,大象,特別是母象,是群居類動物,它們需要和同伴們在一起,但是麥吉的伴侶,一名叫annabella的亞象已經在1997年去世了。
  3. In the research area, the incised valley was formed during the sea level downwards and was provided source by the arenaceous river from qiaotou. it is stacked by 3 incised valleys formed in 3 different sequences

    研究區內子鎮川堡地區發育的下切河谷形成於海平面下降時期,來源於橋的砂質河流沉積,為疊置的、形成於三個不同三級層序底部的下切河谷充填沉積。
  4. And finally …. in 2000 eight aussies cracked their skull whilst throwing up into the toilet

    最後,在2000年, 8個澳佬在吐到馬桶的時候把碰骨折。
  5. The soothing benefits of lavender and rosemary improve circulation to the scalp and rich babassu oil adds a noticeable sparkling glow to your hair

    薰衣草油、迷迭香油增加皮血液循環。巴西棕油為南美土著世代沿用作為天然的潤膚劑。
  6. We laid her head for the nearest port in spanish america, for we could not risk the voyage home without fresh hands ; and as it was, what with baffling winds and a couple of fresh gales, we were all worn out before we reached it

    我們把船對著西屬美最近的一個港口,因為我們如不補充水手,返航時恐怕會有危險。由於風向不停地轉換,再加遇上兩次大風浪,我們到達那個港口時都已累垮了。
  7. A development for europe is this additional small barge board ( right arrow ) in front of the main one ( left arrow ), connected to the protruding horizontal turning vane in similar fashion to a solution used by bar last year

    主側板(左邊箭)前面所增加的這個小側板(右邊箭)是歐站的一個改進,它連接到突起的水平導向葉片上,類似於英美去年曾使用過的一個方案。
  8. A beluga whale swims in a tank at the vancouver aquarium

    白色大鰉魚或叫大白鯨在北美的范庫弗峰水族館里游弋著。
  9. Cheung chau is a picturesque island with a waterfront that bustles with activity. there are butcher shops and vendors selling fresh fish, shellfish, fruit and vegetables

    風光如畫,碼海濱一帶熱鬧非常,眾多店鋪和攤子售賣肉食海鮮水果和蔬菜等。
  10. Andriy was just nine when the chernobyl nuclear reactor in the ukraine suffered a catastrophic accident, sending a radioactive cloud over a huge part of europe

    當蘇聯的核反應堆泄漏危及烏克蘭,造成整個歐洲頭頂的核烏雲時,舍瓦只有9歲。
  11. Permanent closure of sections of the footpaths between castle peak road and chau tau south road

    永久封閉位於青山公路及洲頭南路之間的行人徑部分路段
  12. To date, 16 schemes have been completed. three schemes for san tin, chau tau and sha po are in progress and another eight are at various stages of planning and design

    至目前為止, 16個這類計劃已完成,三個位於新田、洲頭和沙埔的鄉村防洪計劃正在興建中,另外八個計劃也處于不同的規劃和設計階段。
  13. Xiangjiang river, changsha, hunan

    湖南長沙:橘子洲頭
  14. The parkview square hotel yuexiu tian an dasha is ideally located in the yue xiu district, a prosperous section in the heart of guangzhou scommercial district, close to the major tourist attraction - yue xiu park. it is about 10 minutes drive from the baiyun airport and 5 minutes drive from the canton railway station

    越秀天安大廈是廣州市唯一的酒店式豪華住宅及寫字樓大廈,毗鄰廣州市最著名的越秀公園,鄰近中國出口商品交易會,交通便利,距洲頭嘴碼亦僅需20分鐘。
  15. It was now confirmed that 1 260 taels of gold ornaments valued about $ 3. 5 million were stolen. the two private cars involved in the incident were later found on fire near chau tau tsuen on ma tso lung road. the case is now being investigated by officers of the regional crime unit of new territories north

    2002 - 3 - 1117 : 00警方現證實案中被劫的金飾共重一千二百六十兩,估計約值三百五十萬元,警方后來于馬草壟路近洲頭村發現事件中涉及的兩部私家車被人焚毀,案件現交由新界北總區重案組跟進調查。
  16. 9km from the airport, railway station 4km, trains east point 7km, 10km chau tau tsui pier, the recent subway entrance 4km

    距機場9km火車站4km火車東站7km洲頭咀碼10km最近的地鐵入口4km 。
  17. Eco - exploration : chau tau footpath

    生態探索:洲頭小徑
  18. Reclamation of or other works over and upon the government foreshore and sea - bed at the chau tau channel and the ha wan channel in lok ma chau

    在位於落馬洲頭渠道及下灣渠道的政府前濱及海床進行填海工程或在有關政府前濱及海床及其上進行其他工程
  19. The contract, valued at $ 2. 8 billion, involves the construction of two parallel tunnels, each of about 5. 2 kilometres, from east rail north of sheung shui under long valley to chau tau

    該合約價值二十八億元,涉及興建兩條並排的隧道,每條隧道長約五點二公里,穿越?原,連接東鐵上水車站以北與洲頭
  20. The northern link will run between the existing west rail at kam sheung road and the new lok ma chau terminus now being built as part of the spur line project. it will intersect with the spur line at a new station at chau tau of san tin, where passengers can interchange with the east rail via the spur line

    北環線將由現有西鐵錦上路站伸延至興建中的落馬支線落馬總站,並與落馬支線在新田洲頭的新車站交匯,乘客可在該站經落馬支線轉乘東鐵列車。
分享友人