活動順序 的英文怎麼說

中文拼音 [huódòngshùn]
活動順序 英文
activity sequence
  • : Ⅰ動詞1 (生存; 有生命) live 2 [書面語](救活) save (the life of a person):活人無算 (of a goo...
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • 活動 : 1 (運動) move about; exercise 2 (動搖) shaky; unsteady 3 (不固定) movable; mobile; flexible...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  1. The defect of this kind of literary style is that do not there is not close connection between incident and incident, just appeared successively according to the order of time, made the structure of the works seem loose, it is difficult to form the whole effect ; at incident prosily, it narrates scarce to change rhythm static behavior describe have enough and to spare and work up insufficient sense, it was the history living dramas of static historical pictures but not a scene curtain with all linked with one another ring that reproduced out ; regarded incident as the centre, in people s discipline history, dredged and left literature to announce the aim of the question of life

    作為一種敘事散文,回憶錄的寫法理應不拘一格,但事實上大多數作者都是採取的無技巧筆法,也就是一個接一個地敘述事件直至結束,其間加入自己對歷史的感受和思考。這種寫法的缺陷是事件與事件之間沒有緊密的聯系,只是按照時間先後出現,使作品結構顯得鬆散,難于形成整體效應對事件平鋪直敘,敘事節奏缺乏變化,靜態描述有餘而感不足,再現出的是一幅幅靜止的歷史畫面而非一幕幕環環相扣的歷史劇以事件為中心,以人紀史,疏離了文學揭示人生問題的宗旨。
  2. I also summarized briefly the qualifications for tender agency, factors which would block the development of tender agents and the countermeasures, a nd anticipated the foreground of its development in water conservancy systems of hebei province, and then, i advanced my suggestion on the standardization of tendering and bidding procedures in the relevant projects ; i also analyzed the insufficiencies of decision - making system, documents study and circumstances research in the tenders. at the same time, i introduced the skills and strategies in the tendering and bidding, and advanced my analysis results and suggestions. through the introduction of the procedure from opening to evaluating and deciding the tenders, and the scores registration method on evaluating tenders, i pointed out the status quo and main problems occurred in the tendering and bidding in the construction of water conservancy projects in hebei province, and put forward my suggestion on the system of opening, evaluating and deciding of tender in the projects

    在對招標人、招標代理機構和招標過程的法律規定與分析后,指出河北省水利工程建設招標人和河北省工程建設招標代理機構的現狀及存在問題,提出了市場經濟條件下,最合理的招標組織形式為招標代理,並簡述了招標代理機構的資格要求、河北省水利工程建設管理機制中阻礙招標代理機構利發展因素及對策,預測了招標代理制度在河北省水利系統的發展前景,對進一步規范河北省水利工程招標提出建議;對投標過程中存在的投標決策、招標文件研究、投標環境調查不足之處進行了分析,同時介紹了河北省水利工程建設投標報價技巧及策略,對河北省水利工程投標現狀及存在問題提出規范化的分析和建議;通過對水利工程開標、評標、定標運行程和河北省水利工程評標計分辦法的介紹,指出了河北省水利工程建設招標投標定標運行的現狀和存在的問題,提出了河北省水利工程建設開標、評標、定標運行體系的建議。
  3. The activity diagram, use case diagram, sequence diagram, collaboration diagram and the class diagram are used for building the analysis and design model of the sedimentary facies modeling system.

    系統中採用了圖、用例圖、圖、交互圖和類圖建立沉積相建模系統的分析和設計模型。
  4. The jmm describes the ordering guarantees that are made when a program uses synchronization or volatile variables to coordinate activities in multiple threads

    Jmm描述了程使用同步或者volatile變量以協調多個線程中的時所進行的的保證。
  5. These activities include : counting, sorting, classifying objects, experiences with series of sizes and colors, weighing and measuring, carrying out housework such as dish washing, with many sequential, logical steps ? these are activities that nourish the mathematical mind

    這些行為包括:數數、排、分類、大小和顏色列、重量和測量,做家務時比如洗碗,按照和邏輯的步驟?這些可以培養數學頭腦。
  6. Business class object sequence diagrams are constructed to define the operations of business classes. this interaction will enable the analyst to analyse the dynamic behaviour of the business classes

    編制業務類別物件圖可界定業務類別的各項運作。有關的交互可協助分析人員分析業務類別的態職能。
  7. By using interrelated software the tester gets the active order of skeletal muscles of each athlete of different weight of weightlifting

    運用相關軟體得出8名運員在3個不同重量的抓舉全過程中8塊骨骼肌的先後(時) 。
  8. In many nations, everyday activities are done in a planned, orderly manner.

    在許多國家,日常都是有計劃地按進行。
  9. Process mining : discovering direct successors in process logs. computers in industry, april 2004, 53 : 231 - 244

    這類演算法主要根據引擎日誌中記錄的間發生的關系來進行挖掘工作。
  10. Basing on web higher school educational administration system described by uml it mainly introduced developing the choosing - course process which basing on j2ee and used uml as modeling language, rup as process frame : using example pictures, activity pictures to find user requirement, establishing system boundary and found the demand - model of system in the end ; to build analyzing species, using sequence chart. activity chart. cooperation chart of analysis species to describe the analysis - model of system : to build design species, using design species sequence charts, species charts to realize design - model of system ; using component charts. scheme charts to describe realization - model of system, this thesis mainly described the elective - courses and achievement - management

    用uml描述的基於web的高校教務系統原型主要介紹了以uml為建模語言,以rup為過程框架,開發基於j2ee的選課過程:使用例圖、圖來尋找用戶需求,確立系統邊界,從而建立系統的需求模型;構建分析類,使用分析類的圖、圖、合作圖來描述系統的分析模型;構件設計類,運用設計類圖、類圖來實現系統的設計模型:使用構件圖、配置圖來描述系統的實現模型。論文中主要對選修課程、成績管理做了重點描述。
  11. Abstract : the safety management is one of the important content for the enterprise management on the mine. the safe civilized production can ensure production operation smoothly. once safe production has been met several unfavorable factors at transform structure in the mine enterprise, as a result, the production included plenty of passive and difficult position. if all leaders and clerks changed ideas “ the safety first and putling prevention first ”, the management work would must push forward for the development of the mine enterprise

    文摘:安全管理工作是礦山企業管理的重要內容之一,安全文明生產是生產經營利進行的保證,礦山企業在轉機建制中安全管理工作遇到諸多不利因素,導致安全管理工作一度出現被與無的局面,只要各級領導和全體職工提高認識,轉變觀念,牢固樹立「安全第一,預防為主」的思想,落實安全生產責任制,全方位開展安全生產標準化的創建,形成有效的安全文化氛圍,安全管理工作必將對礦山企業的發展起到巨大的推作用。
  12. The timing - and - quantitation precision injection of lpg was realized with high - speed lpg solenoid valve and a set of electronic control system, which was designed by the author and can flexibly control the gas supply system of lpg. based on the analysis of experimental data got by comparing the performances before and after the application of the set of equipment on lr6105q12 diesel engine, the effects of load, speed and replace ratio, etc on the emissions of smoke, hc and co of dual fuel engine were expounded. through optimization, the smoke emission was utmostly reduced and the emissions of hc and co were within the government restriction

    為此,本文通過對各個方案進行詳細比較,選擇了電控多點噴射的供氣方案;利用高速lpg噴射閥和自己獨立開發出一套電子控制系統對lpg供氣進行靈地控制,實現了lpg的定時定量噴射,並把這套裝置應用到中國一拖生產的lr6105q12柴油機上,在對改裝前後的發機進行大量試驗和分析的基礎上,闡明了負荷、轉速、摻燒比等因素對雙燃料發機的煙度、 hc 、 co等排放的影響情況,並且通過優化,最大限度地降低了發機的煙度排放,同時使hc 、 co排放限制在國家標準規定的范圍之內。
  13. Pertaining to the sequential or consecutive occurrence of two or more related activities in a single device or channel

    形容兩個或多個相關在一個設備或通道上地或相繼地出現。
  14. Then a detailed introduction was given on the development process of a course selection system through internet based on j2ee with uml as modeling language and rup as process framework : constructing requirement model through using use case diagrams and activity diagrams to make clear users " requirement and system boundary ; constructing analysis model through designing analysis classes, analysis sequence diagrams, analysis activity diagrams and some collaboration diagrams if necessary ; constructing design model through designi ng design classes, sequence diagrams and class diagrams ; constructing implementation model through the establishment of component diagrams and deployment diagram

    然後主要介紹了以uml為建模語言,以rup為過程框架,開發基於j2ee的網上選課系統的過程:使用用例圖,圖來尋找用戶需求,確立系統邊界,從而建立系統的需求模型;構建分析類,使用分析類的圖,圖,合作圖來描述系統的分析模型;構建設計類,運用設計類圖,類圖來實現了系統的設計模型;使用構件圖、部署圖來描述系統的實現模型。
  15. The chapter of project planning is to characterize the main planning sequence of the project : the scope planning - the scope definition - the action definition - the resource planning - the action sequence definition - the action duration - the cost evaluation - the schedule definition - the cost budget - the project planning. in order to deploy the entire project planning, the secondary planning is necessary : the quality planning, the communication planning, the organization planning, the risk planning, and the purchasing planning

    項目計劃介紹了按照范圍計劃-范圍定義-定義-資源計劃--歷時-費用估算-進度計劃-費用預算-項目計劃制定的主計劃,結合質量計劃、溝通計劃、組織計劃、風險計劃、采購計劃的輔助過程,完整地制定項目計劃的過程。
  16. First, based on investigation and analysis on real estate background and the actual situation of jiangbei real estate development company, the problems and the foundmental root causes existing in the operation management are found out. secendly, according to the requirements of modern business management theory and modern enterprise system, a business management model with quality management being the core is put forward by comparing and analyzing several management models, and selecting one management model as the major with multiple management models existing. based on this, the author has designed the main frame for the management model, completed organizational structure designing, department function and work position describing, work flow and work process designing, establishment of regulations, and formed the organizational structure of the management model. in addition, the varies important management actions, including human resources management, quality management, financial management, marketing management, information management, are analyzed and studied in order to enrich and improve the content of the management model. finally, the author has also put forward the measures and requirements to ensure the effective operation of the management model

    首先,在調查研究的基礎上,通過對房地產行業背景和江北房地產開發公司現狀的分析,找出公司現行狀態下經營管理中存在的問題和困難,並分析原因,查找根源;其次,根據現代企業管理理論和現代企業制度的要求,通過對幾種較為流行的管理模式的分析比較,選擇以一種管理模式為主,多種管理模式相結合的方法,提出以質量管理為核心的企業管理模式;在此基礎上,對管理模式進行整體性的組織設計,完成組織結構設計、部門職能制定和崗位描述、工作流程及工作程設計、規章制度體系的建立等工作,構建管理模式的整體框架;另外,針對各項重要的管理,如人力資源管理、質量管理、財務管理、營銷管理和信息管理等,分別進行分析研究,以充實和完善管理模式框架的具體內容;最後,為確保管理模式利、有效地運行,明確提出「完善公司內部治理機制,健全公司外部治理機制」的保障措施和具體實施步驟。
  17. Uml supports several diagrams, including use case diagrams, package diagrams, sequence diagrams, and activity diagrams

    Uml支持多種圖,包括用例圖、包圖、圖和圖。
  18. Prioritize the sales actions required and enter as valid call objectives

    將銷售要求和有效目標拜訪按先後區分。
  19. A process is a specific ordering of activities with clearly identified inputs and outputs that provide business value

    流程是指定的活動順序,包含明確確定的用於提供業務值的輸入和輸出。
  20. Then, in chapter three, the paper attempts to explore the procedures in the classroom, while these procedures are composed of a series of activities, involving revision activity, presentation activity, practice activity and the like

    文章的第三部分意在探索課堂,並在各步驟中提出了具體的活動順序,以供參考。
分享友人