流水定位法 的英文怎麼說

中文拼音 [liúshuǐdìngwèi]
流水定位法 英文
positional flow method
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 流水 : 1 (流動的水) running water; stream2 (舊時指商店的銷貨額) turnover (in business)流水搬運作用...
  1. On the demand of application and according to the soluhons menhoned above, a method of displacement waiting auto - sy ' nchronizing is put forward, which is based on match filters. at the end a complete and speeflc set of hardware circuits and software programs which haplements the scheme, is also presented in the ancle. the synchronization system was tested in the pool and in the shallow wate near m port, the result of the test shows that its performance is satisfactory

    論文著重介紹實現了跳頻通信系統同步的一般方,並詳細分析和對比跳頻同步系統的捕獲方案,在此基礎上,提出了一個基於匹配濾波器的移等待式自同步方案,設計、完成並給出了詳細硬體連線電路圖、軟體程序程圖和部分程序清單,該自同步方在實驗室池實驗取得良好的效果,並在廈門港海域進行了現場實驗測試,具有較低的誤碼率和一的檢測概率,結果令人滿意。
  2. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河的洪特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計洪量及其相應洪的確加以詳細分析。提出有約束不連序系列的加權優化適線及適合於黑龍江省的河粗糙系數和洪比降的確原則,並介紹了三日降雨量
  3. Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level

    本文首先闡述了我國資源狀況和旱災害、說明庫汛期限制動態控制研究的必要性;介紹了傳統汛限設計、汛限靜態控制、模糊汛限過程線存在的問題及其初步改進方;分析汛期限制動態控制的方及關鍵問題;進一步闡述了庫極限風險率的義;根據極限風險率義,詳細敘述了不同極限風險指標時、不同汛期限制下起調,庫所能承受的極限風險率計算方。然後,基於極限風險率計算方,以白石庫為背景,研究「考慮壩體自身安全、考慮壩體安全與下游防護對象控制下泄量的汛限動態控制的極限風險率」 。
  4. 4. engineering dhqase ( arod ) - deficient e. coli mutant with a second copy of the arob gene gene targeting technique was used to disrupt the arod gene in e. coli chromosome. the mutant 31bk was engineered, in which homologous recombination of the arobkanr gene cassette into the arod locus ( arod : : arobkanr ) of the e. coli strain atcc31884 genome utilized the helper plasmid pkd46 with red system. the host cell 31bk lacked catalytic activity of dhqase ( arod ) and had a second copy of the arob gene, so it improved carbon flow into the quinic acid biosynthesis direction

    構建宿主菌基因精確突變株31bk ( arod : : arobkan ~ r )為了改變代謝途徑脫氫奎尼酸( dhq )分支點上的代謝量,使之充分向目的產物奎尼酸合成方向,利用基因打靶技術構建了31884宿主菌arod基因精確插入突變體,使dhq脫酶( dhqase )失活,阻斷了碳代謝向芳香氨基酸生成的方向,同時用同源重組的方將arob基因整合入染色體上,解除了限速酶對碳代謝通過共同途徑到達dhq的阻遏影響,並減輕代謝負擔。
  5. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨管渠設計中的設計重現期、截倍數等設計參數的選擇、雨置的確、截式合制管渠與截干管的連接方以及溢井溢量的計算等問題進行了探討。
  6. Taking the measure of uncorking on the steel tube and filling water before sand filling, the installation process of sand compaction piles is optimized, the installation parameters and testing rate under the near shore condition are confirmed, and the control and testing methods for the piles ' quality are summarized

    採取樁管壁開孔、先灌后灌砂的方,優化了上擠密砂樁的施工工藝;給出了在近岸無掩護、急的施工條件下的施工參數和檢驗比率,總結了沉樁、高程式控制制、灌砂率等參數的控制措施和檢驗方
  7. Abstract : a research on theory and practice is conducted on the acoustic methods of discharge measurement in low head hydropower plant. taken hydraulic efficiency experiment in certain hydropower plant as examples, the general methods about how to locate the discharge measurement plane, install transducers and choose the integration methods are put forward. an improvement method is proposed finally

    文摘:從理論上和實踐上,對低頭電站超聲波測進行了較為詳細的研究,並以某電站為例,對測斷面、聲路布置和面積積分給出了一般方
  8. Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area

    以廣西繡江交口電站的變動回區河段為例,分析了變動回區的沙特性,分別利用量樣本及不同方計算與分析本河段的設計,提出了變動回區河段設計最低通航的確
  9. The tail - water adjustment with recumbent flap gate has properties of fast response and wide adjustment, which is a common method of controlling tail - water in an unsteady hydraulic model

    採用翻板尾門進行尾調節,具有反應快、調節范圍大等優點,是非恆力模型控制尾一種常用的方
  10. The geological factors are important besides them, which are related to the loess landslide and evolution of gullies, specially for bedrock folds, bedrock joints and loess joints. in field, the data of the bedrock elevation in the three sheets combined with the research from south to north lively were got by gps12xlc pocket locator, the type and its evolution of bedrock, loess landslides and distribution of hydrographical net were explored too. at office, the synthetic analysis and contrast were used including the simulating analysis about the data by mapinfo 6. 5, software of gis, discussion and communication with experts, in order to demonstrate and reveal the rules between the loess landforms and its pale bedrock landforms and the impact of structure on erosion interiorly in shaan bei

    在野外,以代表調查區和路線調查相結合的方,利用gps12xc型手提式儀採集基底高程數據,實地觀察基底地層產態變化規律和特徵,觀察黃土地貌、黃土崩塌、系展布及土壤侵蝕等與地質構造之間的關系;在室內主要進行綜合分析與對比,利用gis系統的mapinfo6 . 5軟體對採集數據模擬分析,並將認識成果與其他專家學者進行交和探討,從而論證和揭示陜北黃土地貌南北縱向分異與基底古樣式關系特徵及失與構造因素之間的內在規律。
  11. Through research of automatic dosing system, established by determining automatic dosage in the methods of transmittance pulsation, streaming potential and mathematical model, it can be concluded that the automatic dosing system brought forward in this paper can fulfill requirements of the technics. likely, this system can also be applied for dosing of other chemicals in water plants, chemical dosing of wastewater treatment plants and other similar places

    通過對採用透光率脈動、動電、數學模型等方混凝劑投加量建立的自動配投系統的研究表明本文提出的自動配投系統能滿足工藝的要求:同樣該系統也適用於給處理廠其他藥劑的投加,適用於污處理廠及其他類似場合藥劑的投加。
  12. But due to the character of the social benefit - based water projects as public goods while the character of the system of construction project legal person taking responsibility as a system of modern enterprise, mplementing the system of construction project legal person taking responsibility in social benefit - based water projects exists a lot of problems. due to the project character, implementing the system of construction project legal person taking responsibility in the social benefit - based water projects is different from the profit projects

    本文在分析研究現行公益性項目人責任制存在問題的基礎上,就責任主體的明確、項目人的主體特徵、政府在公益性利建設項目中職責、運行模式的探索、域機構在實行公益性項目人責任制的地以及公益性利工程實施項目人制的外部環境等方面進行了全面的論述。
  13. In this dissertation, rainfall infiltration, runoff, and soil water redistribution on a hillslope were studied by simulated rainfall experiments, and soil water cycling was investigated by site observation and soil sampling methods. moreover, the reasons for the desiccation of deep soil layer were analyzed, and its assessment indexes and standards were presented. the main results are as follows : ( 1 ) rainfall infiltration into a planar hillslope with a homogeneous isotropic soil could be simply regarded as one - dimensional infiltration process, if soil erosion was prevented

    針對當前該區植被恢復重建中存在的科學問題,以植被建設的關鍵性限制因素?土壤分為出發點,通過室內外模擬降雨試驗,研究了坡地降雨入滲、產及土壤分再分佈規律,同時採用觀測和采樣分析相結合的方,分析了坡地土壤分的循環與轉化特徵,並初步建立了深層土壤乾燥化程度的評價標準,取得的主要結論如下: ( 1 )在防止土壤侵蝕的條件下,均質坡地的降雨入滲過程可以簡化為一維。
  14. Quantitative remote sensing method on soil losses can be realized with gis, rs and gps integration on personal compute. it has the merits of accuracy, speediness, dynamic, quantity and orientation. and it becomes one of the new methods recommended by internal and external experts

    基於3s技術的量遙感方在pc機上實現了gis 、 rs和gps的集成,具有準確、快速、動態、量、的特點和優點,是當前國內外廣為推崇的新方
  15. The thesis manages the bureau ' s water resources the management problem to object with the yishusi water conservancies, and develop the theories with the resources, can keep on developing the theories, and operate the strategy theories, etc. theories of public choice for prop up, make use of the swot analysis, bring up the yishusi water conservancy the management bureau should choose to reunite the type water the resources expansion to develop the strategy, since the yishusi bureau should consider how the share profit to use the outsider opportunity in the environment, relocation and validity combination that pass the internal resources, choose the main industry water that expand the type the resources to develop the strategy, within limit of the diversified water resources of related property develop the strategy, and make the yishusi river valley manage the organization water the resources to develop the strategy point, concrete proceeding to develop strategy to water resources research from the yishusi river valley of physically set out, establishment the yishusi manage the bureau water the resources the strategy that develop the fixed position the river strategy the combination

    論文以沂沭泗利管理局的資源管理問題為對象,以資源開發理論、可持續發展理論、經營戰略理論、公共選擇等理論為支撐,運用swot等分析方,首先分析了沂沭泗局在資源開發方面所面對的內外部環境,得出了沂沭泗局內外環境因素綜合分析結論;其次,對沂沭泗局發展進行了swot分析,提出沭泗利管理局應選擇復合型資源擴張開發戰略,即沂沭泗局應考慮如何充分利用外界環境中的機會,通過內部資源的重新配置與有效組合,選擇拓展型的主業資源開發戰略、適度的相關產業多元化資源開發戰略,使沂沭泗局得到快速發展。再次,研究了沂沭泗管理局資源開發的總體戰略。確立了沂沭泗管理局資源開發的戰略,提出了沂沭泗域管理機構資源開發戰略重點,對資源開發戰略的具體內容進行了研究。
  16. Abstract : based on the geophysical characteristics of each medium in the studied area, combining with the geophysical inversion technique, the location of tertiary thin - layer aquifer is delineated, the top depth of granite basement is identified

    文摘:依據區內各介質的地球物理特徵,結合物探數據反演技術,利用直電測深,圈出第三系薄層含層的置。
  17. After that, we analyze the internal resources and capability of the hs - sysway company by radar chart and value chain etc. then we analyze the advantage and disadvantage of the holding chances and cutting threaten, using the vrio frame. the results are following - the main advantages for hs - sysway are : its support for capital and tobacco market, ierp ( developed independently ) and differentiation, erp ' s marketing capability, technique development capability, local costs and services etc. ; the main disadvantages are : the strategy orientation is unclear and carried out weakly, low level management, persons with high ability are short of or missing, weak maturity and difference of products, short of core technology and capability etc. on that basis, we analyze the stakeholders and specify the task of the company ; we use the swot analysis and large tactic matrix etc. and bring forward the basic strategy of the development that is the aggressive strategy

    其後,運用雷達圖分析、價值鏈分析等方對企業內部的資源與能力進行了分析,然後利用vrio框架,對企業能夠用以抓住機會、削減威脅的優勢及弱點進行了分析,得出宏聲新思維公司的主要優勢是宏聲集團的資金及煙草市場支持、自主開發的ierp及其差異化、 erp營銷能力、技術開發能力和本地化的成本及服務等,主要弱點是戰略不清晰且貫徹不力、管理平低、高素質人才匱乏且有失、產品成熟度和差異性不高、缺乏核心技術與能力等。
  18. Secondly, the implementation of each module of the software is discussed in detail. main content of this part includes the inplementation of the massive image data high - speed transferring from scanner to host by use of a large capacity fifo and a 32bit high - speed pci card, how to control the step motor for precise location of the cis image sensors, the techniques for utilizing the lm9830 to control scanning actions based on the cis ' s characteristics, the real time image data collection, the reconstruction of the image data sampled by the z - shape combined cis sensors, and the parallel and pipeline techniques used in the whole process helping to save time

    然後詳細討論了掃描儀底層驅動軟體中各個功能模塊所解決的問題和具體實現方,具體介紹的內容包括:如何利用大容量fifo和高速32pci介面卡實現大量圖像數據的高速傳輸功能,如何對步進電機進行控制實現圖像傳感器的精確功能,如何針對cis傳感器的具體特性應用lm9830晶元控制cis的掃描動作,如何實時的採集圖像數據,如何對「 z 」型拼接傳感器掃描出的圖像進行重構以及如何應用并行和技術對整個掃描過程進行控制以提高掃描速度。
  19. Further, in light of the mathematic functions among price, efficiency and equity, the effects / impacts of water pricing methodologies on efficiency and equity in water resources reallocation have been analyzed, the results are that different pricing methods have distinguish impacts on efficiency for water resources uses while they have few impacts on equity for incomes due to reallocation of water resources. fourthly, because the regional water resources have some features of river basin, an integrated water resources management ( iwrm ) has been suggested for the efficient management of regional water resources, where the basic criteria and intensions of iwrm have been analyzed. in order to the iwrm for regional water resources, the enabling environments, the institutional roles and the management instruments will be needed

    再根據交易中的價與效率及公平性關系的數學模型,分析不同的價制資源再分配(權交易)的效率與公平性影響,提出的不同的價方資源使用效率有顯著影響,而對公平性基本沒有影響;針對區域資源具有域特徵的實際情況,提出了區域資源綜合管理( iwrm )的模式,分析了iwrm的基本原則和包含的內容,進行了為實施iwrm的關鍵措施和體制安排,要實現區域資源的綜合管理就必須具有寬松的環境、充分發揮管理機構的作用和靈活運用先進的管理手段;根據區域資源的特點和可持續利用原則,進行了區域張仁田:區域資源可持續利用研究資源開發利用戰略方針的研究,按照制的19項戰略方針,對一特的區域進行了不同用戶資源需量的中、長期預測,其中包括生態環境需量,並採用iqqm模型進行供需平衡分析,提出在工程設施保證、技術措施和體制及律保障到的情況下,遠期能夠實現供需平衡。
  20. Reference to the designation of die casting mould, we put forward some kinds of projects respect to the design and manufacture of dies of the special purpose machine. and we simulate die casting filling process 、 surface defect distribution and temperature field etc. of az91d magnesium alloy shell part with flow3d software

    設計時將參照壓鑄模的設計方,提出多種方案,並使用flow3d模擬設計軟體來模擬金屬液的填充過程,預測可能產生缺陷的置,從而決澆注系統的形狀和分佈,冷卻道的向和置,分錐的大小和置。
分享友人