  1. Bda is equipped with advanced facilities for international telecom, water, electricity, natural gas, steam, heat, and separate drainage systems for sewage and rainfall

    開發區建有高平的國際通訊設施和電天燃氣蒸汽熱源等管所及雨污分的排系統。
  2. Fig. 20 - 1. team crossing. direction of flow is parallel to the line of the waders

    最強的要在最上游的位置,隊伍的直要和平行。
  3. Observed tidal harmonic constants in many stations are used to verify the astronomical tides in the compound fluid model. the wave model is tested by a set of wave flume data at first. then the results are compared by the actual processes of significant wave height in gauging stations

    其中復合場模型中的天文潮利用眾多測的實測調和常數進行驗證;波浪模型首先進行了槽實驗的檢驗,然後在臺風過程中,進行了測有效波高過程的比較。
  4. Based on the characteristics of the daily regulation wave of hydropower stations, the water surface lines in the rising and falling stages are calculated by using an one - dimensional steady flow model and an unsteady flow sediment model

    摘要根據日調節波的特性,運用一維恆定和非恆定泥沙數學模型,分別計算了河道漲落過程的
  5. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv電網接地故障的形式、消弧圈接地的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以電纜為主的城區10kv電網中性點接地方式的選擇問題進行研究。論文首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變電10kv電網的實際參數來建立數值計算模型,在考慮了電網接地電容電變化、中性點電阻取值大小、接地點接地電阻值變化等多種影響因素的情況下,對中性點經消弧圈接地和經小電阻接地方式下電網的過電壓平和接地點短路電大小進行了數值計算,其計算結果與電科院所作現場試驗進行了比較。
  6. It includes : dynamic show of technics flow, real time data acquirement and show, history data save and print, fault alarm, etc. the plc control system mainly accomplishes the wastewater technics flow control, harmonizes the logical relationship among local intelligent control instruments and transmits the state of each local equipment to the industrial computer simultaneously, the plc control station receives the control commands from the industrial computer ; the local intelligent units take charge of the correlated parameters measure, disposal and control, and it will transmit the related parameters to the computer, etc. in this thesis, introduced municipal wastewater treatment technics, the integrated application program development of computer, the design method of plc control station, the communication between plc control system and computer, and the network of wastewater treatment with profibus - dp was also discussed

    上位計算機主要實現遠程監測和管理功能,具體包括:工藝程動態顯示、實時數據獲得及顯示、歷史數據存儲與列印、故障報警等功能plc控制系統主要完成工藝程式控制制以及協調現場各智能儀表之間的邏輯關系,將現場各設備的運行狀態通過通訊網路傳輸到上位計算機,並接收上位計算機的控制指令;現場各智能儀表單元負責各相關參數的監測和處理、控制,並將有關參數送往上位監控計算機進行處理、保存等。本文以莎車污處理項目為例,介紹了城市污處理工藝、上位監控計算機的綜合應用程序開發、城市污處理自動控制系統plc控制的設計和採用profibus系列中廣泛應用於現場設備的profibus - dp總
  7. In addition, he translated the cream of cultural relics in shaoxing ( volumes 1 and 2, chinese - english translation ) for the cultural relics bureau of shaoxing city, installation manual for continual casting line of hangzhou steel mill for the no. 13 national metallurgy construction engineering company ( chinese - english translation ), technical documents for the bearing company of wanxiang group ( chinese - english translation ), technical documents for the hangzhou nardi machinery co., ltd. ( english - chinese translation ), technical documents for the taizhou fengrun biochemical co., ltd., profiles of auto parts firms for the jindian ( golden idea ) advertising company of yuhuan county, fsr of wastewater treatment project for the shanghai municipal engineering design general institute, fsr of cultural heritage conservation project for huahui design institute of shaoxing, ea report of cultural heritage conservation project for zhejiang environmental science research and design institute, website homepage and patent documentation of the zhejiang galaxy flood materials company, theses of ciob ( chartered institute of building ) training courses held in shanghai, abstracts of master degree theses for graduates of zhejiang university, solicited articles on rediscovering zhejiang ( english - chinese translation ), wuyi painting album used at the world poverty reduction conference jointly held by the world bank and the central government of china in shanghai, painting album of the new century tourism group, menus for hangzhou dahua hotel, etc

    此外,還為紹興市文物局翻譯了紹興文物精華上下冊(漢譯英,正式出版物) ,為中國十三冶翻譯了杭州鋼鐵廠連鑄生產安裝說明書(英譯漢) 、為杭州萬向集團軸承公司翻譯了技術文件(英譯漢) ,為杭州納狄機械有限公司翻譯技術文件(英譯漢) ,為臺州豐潤生物化學有限公司翻譯技術文件,為玉環金點廣告公司翻譯了多家汽車配件公司(廠)簡介,為上海市政工程設計研究總院翻譯了某污處理廠項目工程可行性報告(漢譯英) 、為紹興華匯設計院翻譯了工可報告、為浙江省環保科學設計研究院翻譯了文化遺產保護項目的環境評價報告,為浙江銀河防汛物資公司翻譯了網主頁和專利產品文獻,為上海的ciob (英國皇家特許建造學會)研討班翻譯多篇結業論文(漢譯英) ,為浙大研究生翻譯多篇論文摘要(英譯漢) ,為浙江外事辦公室翻譯中國加入世貿組織與政府職能轉變(英譯漢) ,為浙江省對外友好協會和錢江晚報的外國友人看浙江的徵文多篇(英譯漢) ,為武義縣翻譯了減貧經驗交材料武義畫冊(用於在上海召開的世界扶貧大會) (漢譯英) ,為開元旅業集團翻譯了介紹畫冊(漢譯英) ,為杭州大華飯店翻譯了菜單(漢譯英) ,等等。
  8. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲及電網潮,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯補償電抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制網內無功潮分佈合理、各變電電壓在理想的范圍內時電網有功損耗最小,從而也提高了電網安全運行平及供電質量。
  9. Based on optimization theories of genetic algorithms and the linear programming, a series of optimal design mathematics models and methods of water transmission conduits and water distribution networks have been presented, in the light of their characteristics. the results are as follows : 1 the linear programming models and calculations of the pressure gravity conduit, the gravity pressure conduit and channel, the pressure conduit with pump station and the pressure conduit in considering pump station flow variations are presented respectively

    本文針對不同類型的輸和配管網系統的特點,應用遺傳演算法和性規劃等優化設計理論和方法,對其優化設計問題進行了較為系統的研究,成果如下: 1分別建立了重力輸管道系統、重力輸管渠系統、泵加壓輸管道系統以及考慮量變化的泵加壓輸管道系統優化設計的性規劃數學模型,並提出了計算方法。
  10. The telemetric monitor measured and logged six physical water quality parameters at short intervals, and then transmitted this data to the epd offices via a phone line the trial revealed a number of problems

    內的泵抽起經遙測監測器,每隔一段短時間測量和記錄六項物理質參數,並透過電話將數據傳送至環保署總部。
  11. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山溢洪道進態、提高泄能力,通過一系列試驗優化了溢洪道引渠左導墻頭部曲型式。
  12. In the first part, we compute the site design flood of given design frequency ( 0. 01 %. 0. 1 %. 0. 2 % and 1 % ) using the design flood hydrograph. then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method. according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval

    本論文以廣西紅河龍灘為例,在第一篇中採用洪過程法計算了給定設計頻率為0 . 01 、 0 . 1 、 0 . 2和1的壩址設計洪,並利用合成量法計算了相應設計頻率的入庫設計洪
  13. Four models under the combination two type of work station with two type of hypotheses, and an instance is given. in model of the optimization of u - line, according to the characteristic of u - line, a model of optimization on the workload is set up, the optimization methods is given. moreover, a method of workstation breaking is put forward, thus, the problem of optimization of u - line can be transferred into straight - line problem and the two problems are unified through the method

    在基於u型布局的混合生產系統的多目標協同優化模型中,針對u型的特點,建立了針對負荷均衡的混合u型的協同優化模型,給出了具體的演算法,並且提出工作分解的方法,將u型系統的優化轉化為直系統的優化,把混合u型生產的優化與混合直生產的優化統一起來。
  14. In addition, according to difference between the top - level materials and the low - level materials, the model of leveling the mat erial flow is set up separately. furthermore, the model of leveling the material flow with constrain of resource supplying limit. in the model of optimization on the workload, the mutual effect of line balancing and scheduling is analyzed by an instance ; the factors of line balancing, scheduling, and system parameters, such as workstation length, the launch rate are taken into considered

    在基於負荷的多目標協同優化模型中,通過實例分析了平衡設計與排產設計對系統目標的交互影響,綜合了的平衡設計和排產設計與工作長度、產品投放速率等系統參數對系統的影響來優化混合生產系統設計,建立了在2種工作類型與2種假設情形構成的4種組合下的優化模型,給出了一個優化實例。
  15. In this paper, subjects mainly focused are as follows : to meet with the requirement of forward business and the establishment of mid - long term generation planning of hydroelectric plant, the yearly runoff and the monthly runoff are studied in this paper, providing many kinds models that suited to min - long term runoff forecast, including the time series analysis, the nearest neighbor bootstrap regressive model, the grey topological model, recession curve model, threshold auto regression, mean generating function, and ann model etc. the forecast result proves that these models are useful

    本文從以下幾方面進行了較為深入的研究: ( 1 )為了滿足電廠的期貨交易及編制中長期發電計劃的需要,本文對年、月徑預測進行了研究,提出了徑中長期預測模型,包括:時間序列模型、最近鄰抽樣回歸模型、灰色拓撲預測、退模型、門限自回歸模型、均生函數模型及神經網路模型等,從預測成果來看,效果較好。
  16. Company main product are case, cabinet, video wall, operations area, the standing machine case is set free direct, various saves, led rejects the case, the five metals presses one, the production line at the same time, line of plug - in package, etc. )

    公司主要產品為(機箱、機櫃,電視墻、操作臺、直放機箱、各種保險箱、 led屏箱、五金沖壓件、同時生產、插件等) 。
  17. An optimum model for wofking station installation in clothing assembly line

    服裝生產上工作的最優設置模型
  18. The axial - flow turbine generator set is suitable for low head from 2m to 70. its feature is that the water flow passes through the runner axially. the axialflow turbine generator set can be classified into two forms according to the runner construction : one is fixed blades propeller for small variation of head and power, the other is movable blades kaplan for large variation of head and power

    輪發電機組是低頭大量電的較好機型,一般適用於頭2 ~ 15米,其特點是從進口到尾出口都是軸向的,道基本上成直,因而貫輪發電機組具有特性好,效率較高等特點。
  19. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲利樞紐是清江域三級的最下游一級,電總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  20. This paper also calculates the unsteady flow of the hydropower station ' s model by using of the characteristics method, the calculated result is extremely close to the experimental result

    本文還採用非恆定計算的特徵法,對該系統模型非恆定進行了計算,其計算結果與模型試驗結果吻合。