浚通 的英文怎麼說

中文拼音 [jùntōng]
浚通 英文
circulation
  • : 浚構詞成分。
  • : 通量詞(用於動作)
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能過調整挖泥槽寬度、位置及數量等措施來達到目的。
  2. The depth of the river is maintained by dredging.

    過疏保持河道的深度。
  3. We put emphasis on the method and process of establishing a controller link field control network ; have designed the monitoring program and remote service manager program. the completed system realizes the automatically monitoring and remote - communication of the dredging work of cutter suction dredger

    重點闡述了組建controllerlink現場控制網路的方法和步驟,編制了上位機監控程序和遠程服務管理器程序,基本實現了絞吸式挖泥船疏作業的自動化監控和遠程訊。
  4. These measures include : rehabilitation of vegetation with preserving soil and water on the eroded infertile soils, the entrance to “ soil reservoir ” dredged by controlling with different eroded soil types, using “ soil reservoir ” of the upper reaches of the yangtze river bigger much more than the reservoir of the three gorges

    充分調用「土壤水庫」實現長江流域防洪減災的措施應包括建立保土保水的地表植被系統,分類整治侵蝕劣地土壤,疏入滲「土壤水庫」的道,以及重視調用一個比三峽水庫庫容大得多的「土壤水庫」 。
  5. Dredging is a usual method for shipping, port maintenance, and lake pollution control, in such projects many dredged sediments will be produced

    是航道疏、港口維護、湖泊治理中常用的工程措施,我國每年都有數億方以上的疏淤泥產生。
  6. The author also synthetically analyzed each effect factor on dredging, concluded several relationships between dredging dimensions and efficiency as formulae 7 - 1. 7 - 2 and 7 - 3

    過對各挖槽影響因素的綜合分析,得到了式7 - 1 、 7 - 2 、 7 - 3等疏挖槽尺寸與挖槽效果的關系。
  7. Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore

    本文在查閱大量文獻的基礎上,對疏泥泵及排泥管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較用的計算機程序,對緊急關閥、水下挖掘機具(如絞刀、斗輪等)吸泥口堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。
  8. The plans will be carried out in different stages, which involves 11 key projects, including : taipu river, wangyu river, dyke around the taihu lake, south - drainage in hangjiahu plain, water drainage and diversion in huxi, hongqitong, flood control in east - west tiaoxi, water drainage and diversion in wuchengxi, enlarging lanlugang, dredging liuhe and xietang, north drainage in hangjiahu, and flood prevention in the upper stream of huangpu river

    該方案以流域防洪除澇為主,統籌兼顧供水,航運和環境保護等方面的利益,計劃分期實施包括太浦河、望虞河、環太湖大堤、杭嘉湖南排、湖西引排、紅旗塘、東西苕溪防洪、武澄錫引排、擴大攔路港疏泖河及斜塘、杭嘉湖北排道及黃浦江上游防洪工程等十一項骨幹工程。
  9. They have to dredge the canal so that ships can use it

    他們須疏運河河道輪船方可
  10. It has been tested by dredger simulation training machine and is running perfectly

    初步過了絞吸式挖泥船疏作業模擬器的測試,運行狀況良好。
  11. Based on plenty of investigations and researches, the thesis developed lots of lively, vivid, visual integrative monitor and alarm interfaces with excellent interactive quality by processing graphical edit software in the integrative monitoring and alarming system. the thesis managed to make them to be an ordinal, clear and distinct system, by programming and designing as a whole, arranging and organizing systematically

    模擬訓練器集中監控報警系統以國產1750m ~ 3 h絞吸式挖泥船集中監控報警系統為模擬母型,在大量調查研究基礎上,過對各種監控數據、報警提示適當取捨、擴充,並進行總體規劃設計,經過分門別類地編排組織,採用過程圖形編輯軟體開發了大量生動、形象、直觀、交互性強的集中監控報警界面,使之組成脈絡分明、層次清晰的有序系統。
  12. First the author memorized the yellow river excavation history and concluded development of modern dredging science, and found that most researches of dredging are related to navigation regulation, little used to flood control especially in the yellow river with silty. based on the experiment of generalized physical model of the lower reach of the yellow river, and the study of the loaden flow mechanism and the dredging efficiency, the author get some new ideas as follows : 1

    過對黃河疏的歷史以及現代疏工程學的發展進行了回顧和總結,認為已有的疏研究大多基於航道疏工程,對于防洪疏特別是在黃河這種多沙型河流上進行防洪疏的研究極為欠缺,本文基於黃河下遊河道概化模型試驗,對疏挖槽后水沙運動機理及效果等進行了研究,得到以下認識。
  13. Based on the back silting analyses of the sandbar - dotted waterway in the oujiang river estuary after three times dredging, reasons for back silting in the waterway are presented considering influences of flow dynamics, waves and salinity distribution on sediment concentration

    摘要過對甌江口攔門沙航道3次疏后的回淤分析,以及從甌江口的水流動力條件、風浪、鹽度分佈對含沙量影響等的初步分析,得出了攔門沙航道回淤的原因。
  14. Chen l, wu c, sun f. finite time thermodynamic opti - mization or entropy generation minimization of energy systems [ j ]. j non - equilib thermodyn, 1999, 24 ( 4 ) : 327 - 359

    嚴子,陳蘇煌.三熱源泵熱循環的最佳泵熱率與供熱系數間的關系[ j ] .科學報, 1987 , 32 ( 16 ) : 1280
  15. In practice, because of the differences in soil property and irregular riverbed, dredging processes are usually complicated. in addition, dredger operators are required to understand dredging processes and to be familiar with the basic characteristics of the dredging equipment through specific training in order to control the dredging equipment correctly

    生產實踐中,水下土質的差異及河床形態的多變,使得疏工況和疏作業比較復雜,再加上大型疏設備十分昂貴,從而客觀上要求船員事先應過崗位培訓,了解疏過程,熟悉疏設備的基本特性,為正確操控疏設備,實現安全高效疏,提供技術保證。
  16. The department operates a preventive maintenance programme whereby the public drainage system is regularly inspected and desilted both before and during the rainy seasons. these preventive measures ensure that stormwater will be discharged effectively, and prevent blockages and overflows which may cause flooding and nuisance to the public

    渠務署推行預防性保養計劃,在雨季前及雨季期間定期檢查、疏和維修公共雨水渠系統,確保雨水排放暢,使市民免受水浸滋擾。
  17. Such improvements and innovations range from the local - a new road, the clearing of a stream for traffic, a foot bridge - to those of global significance such as the invention of the telegraph, the advent of steamshipping, the opening of the suez canal, the establishment of long - distance trunk railroads with refrigerated cars, and, more recently, the development of containerized shipping. taken together, they have

    這些改良和發明包括地方性的:修一小條新路、為運輸而疏一條小河、造一座小橋等;它們也包括全球性的:電報的發明、蒸汽船的運用,蘇伊士運河的開,長距離的鐵路干線(包括鐵路冷藏車)的拓展以及更新近的集裝箱船隊。
  18. Dredging is one of the effective engineering measures to control floods and improve navigation

    清淤疏是提高大江、大河、大湖防洪及航能力行之有效的工程措施。
  19. Abstract : a design and construction method to a new - typed cofferdam is introduced. after its project application, such advantages are proved as less investment, high construction pace, less labour power and dredging river

    文摘:介紹一種新型圍堰的設計施工方法.過工程應用證明,新型圍堰比採用傳統的圍堰不僅投資省,而且具有施工進度快、節省人力、不挖毀土地、疏河道等特點
  20. According as the mathematic model near the inlet of the 1750m3 / h cutter suction dredger, by researching the method of calculating the slop ' s specific gravity and volume concentration, the thesis adopted instant interactive mode and developed the optimized dredging operation guiding and training system, which has outstanding instructional quality

    根據1750m ~ 3 h絞吸式挖泥船吸口處泥漿形成過程的數學模型,過對計算泥漿比重及體積濃度的方法進行專門研究,採用即時交互方式,按疏作業優化操作步驟開發出指導性強的疏作業優化操作提示系統。
分享友人