浮築結構 的英文怎麼說

中文拼音 [jiēgòu]
浮築結構 英文
floating structure
  • : Ⅰ動詞1 (漂在液體表面) float; drift 2 [方言] (在水裡游) swim Ⅱ形容詞1 (在表面上的) superfici...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • 結構 : 1 (各組成部分的搭配形式) structure; composition; construction; formation; constitution; fabric;...
  1. Archaize timberwork pontoon, landscape pontoon, steel structure pontoon bridge, waterfront architecture

    三、仿古木橋、景觀橋、鋼橋、景觀親水棧橋、濱水景觀建
  2. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建物的抗傾倒、抗力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  3. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建產品價格與工程造價、工程價格是如何界定的、比較建產品的計劃價格、動價格與市場價格的含義,搞清楚工程造價的成和建安裝工程費用的成以及竣工算價格與決算價格的區別;通過分析、比較建產品的「社會平均生產成本」和「企業個別生產成本」的計算依據和成內容,從招標投標的設計機制的功能和實施招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的施工圖預算方法與招標投標之間存在悖論,工程量清單計價的推行是對建產品市場價格形成改革的推進,也是建產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設工程工程量清單計價規范》具有推進建市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。
  4. From investigation results find that chongqing " buildings and constructs almost apply ceramic tile, granite, glass wall curtain etc material to exterior wall from 1997 to now. none but few template buildings " partial projects ( for example longhu park, jinxiu hill manor ) apply exterior wall coating to exterior wall. further more, author knows exterior wall coating ca n ' t a great deal popularize and apply because of acid rain, suspend grain, humidity

    從作者對大量的新舊建物調研果發現:從1997年至現在,重慶市的建物又幾乎都採用瓷磚、花崗巖、鋁合金板、玻璃幕墻等作為外墻飾面材料,只有極少數樣板建(如龍湖花園,錦繡山莊等)的部分工程外墻面採用建外墻塗料;而且作者了解到影響重慶市外墻塗料不能大量推廣應用的主要環境因素是酸雨、濕度和懸顆粒。
  5. In this paper, load effect combination, resisting buoyancy of basement, load combination of basement outer wall and basement soleplate and equivalent uniform live load of fire engine basing on " load code for the design of building structures " are discussed

    摘要該文探討的是《建荷載規范》中有關荷載效應控制的組合、地下室抗、地下室外墻和底板的荷載組合以及消防車等效均布荷載的確定等內容。
分享友人