海平面基準 的英文怎麼說

中文拼音 [hǎipíngmiànzhǔn]
海平面基準 英文
sea-level datum
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 海平面 : sea level
  1. According to whether there are later tectonic activities or not it can be divided into mountain planation surface, lower planation surface and buried planation surface. according to active condition, it can be divided into active surface, dormant surface, exotic surface and defunct surface. taking the base level into consideration, it can be divided into sea - eroded and deposited planation surface, denudated planation surface, snowline planation surface and upper eroded planation surface

    依據夷形成后是否遭到後期構造變動將夷分為山地夷、原地夷和埋藏夷;依據夷的活動狀態可分為活動、休眠、外來和廢止;依據侵蝕可分為蝕-堆積夷、剝蝕夷、雪線夷和上部剝蝕夷;依據底可分為穩定地帶上的夷和活動地帶上的夷;依據氣候帶可分為原、山麓和聯合山麓、雙層水和刻蝕原、凍融山足和凍融剝夷原。
  2. Based on the spectrum of mean sea level ( msl ) and the relation model between two tidal stations, the mathematical model for hydrographic datum transfer are studied

    的頻譜結構和兩驗潮站潮位之間的關系模型,對傳遞的方法原理進行了理論研究。
  3. Our company is located in haiyan, the basis of the fasteners in china

    鹽縣澉浦標件廠(公司)位於鹽縣標地,佔地積16000方米。
  4. Our company is located in haiyan, the base of the fasteners in china

    鹽縣澉浦標件廠(鹽縣澉標五金有限公司)位於鹽縣標地,佔地積16000方米。
  5. Shkp follows international trends and is always looking for new ways to achieve the highest quality. it was the pioneer developer to employ new technologies such as infrared detector to check external walls, high - pressure water jets to test windows and laser levellers to inspect floors

    新地經常到外考察,參考國際一級企業所厘訂的,又不斷引進新技術提高質素和效率,例如新地率先應用以紅外線科技測試外墻用高壓水槍全測試鋁窗以鐳射水儀檢查地臺等。
  6. Tide height is in metre above the chart datum which is 0. 146 m below the hong kong principal datum

    潮水高度為以上高度,以米為單位。香港的在主水下0 . 146米。
  7. Tide height is in metre ( m ) above the chart datum which is 0. 146 m below the hong kong principal datum

    潮水高度為以上高度,以米為單位。香港的在主水下0 . 146米。
  8. Both the asynchronous effect of synchronous reduction method and the time shift effect of regression reduction method are discovered and more precise models for both above methods developed in this paper

    研究還表明:的回歸分析傳遞法和深度的潮差比傳遞法均是最小二乘潮位擬合傳遞法的特殊形式。
  9. Based on systematical study of each constituent of iss, the foundation, computation and precision analysis of the models of geoid, sea surface topography, mean sea surface and ocean tide are mainly discussed ; the conceive of mean sea surface height model and ocean tidal model suitable to chinese near sea and its neighborhood is provided ; two kinds of iss model are derived out

    本文在系統研究瞬時高各組成要素的礎上,主要討論了大地水模型、地形模型、模型和洋潮汐模型的建立、計算以及精度評價等問題;提出了建立適於我國近及鄰域模型和洋潮汐模型的設想;綜合得出了兩種瞬時高模型,並進行了精度估計,編制了相應的軟體。
  10. Uninterrupted pedestrian connection from the statute square to the waterfront would be provided through the site. - the maximum building heights of the 4 " waterfront related commercial and leisure uses " sites are 15 mpd 2 storeys for the " ou " site, 25 mpd 4 storeys for the two " ou " sites and 13 mpd 1 storey for the " ou " site

    至於4幅"與旁有關的商業及休憩用途"土地的最高建築高度為: "指定用途1 "地帶為主水以上15米兩層高2幅"指定用途2 "地帶為主水以上25米四層高,以及"指定用途3 "地帶為主水以上13米一層高。
  11. In fact, the transformation and unification of the local height datums have relations to the mean sea level variation at the shore where the tide gauges are located

    局部高程的轉換與統一,不得不涉及沿各主要驗潮站的變化。
  12. First, the defmation and status of height datums is introduced and some problems on the local height datums established by the mean sea level, which is defined by the tide gauge data, are discussed. then the research progresses in recent years are analysed

    首先介紹了高程的定義與現狀,指出了用驗潮站長期建立局部高程所存在的問題;分析了當今國內外高程的研究現狀;進一步明確了我國高程現代化的必要性。
  13. Then the origin vertical shift of cnhd85 with respect to whd is calculated from geopotentials. and the systematic difference and its distribution of cnhd85 is analyzed from the difference of height anomalies. at last, the systematic difference of the mean sea level at qingdao tide gauge is further testified from the sea surface topography model

    然後於位理論方法求出了1985國家高程點的垂直偏差,於高程異常差分析了1985國家高程的系統差及其分佈規律,最後地形模型進一步揭示了青島驗潮站的系統差。
  14. All depths in sea refer to the chart datum which is 1. 38 metres below the mean sea level

    所有水深均以圖水為計算根據,該位於以下1
  15. All levels in land refer to the hong kong principal datum which is 1. 23 metres below the mean sea level

    所有地均以香港主水為計算根據,該位於以下1 . 23米。
  16. The hong kong principal datum is approximately 0. 88 m below the yellow sea datum

    香港的主水約在黃下0
  17. If an immersed tube about 10 metres high is placed above the existing seabed level, which is at around - 12mpd

    -假如在現有床上約主水以下12米處敷設直徑約10米的沉管。
  18. Dredging of an immersed tube tunnel trench to - 30mpd alongside the existing gravity structure seawalls would undermine the seawalls, the bases of which are around - 5mpd

    現有的重力式結構堤的地在主水以下約5米,沿堤挖掘沉管隧道坑道至主水以下30米會削弱這些堤。
  19. The road level of the cwb, as well as its eastbound slip road to the hong kong convention and exhibition centre extension, will need to be raised to - 7. 1 mpd to avoid clashing with the existing mtr cross harbour tunnel tsuen wan line with its roof at - 14. 6mpd

    -中環灣仔繞道的路高度,以及通往香港會議展覽中心的東行支路必須提高至主水以下7 . 1米,以避開現有地鐵過隧道荃灣線,該隧道管道頂部位於主水以下14 . 6米
  20. The geoid is used to be regarded as the theoretic global vertical reference. the actual national height references are regional mean sea levels determined by tide gauge station. the difference between them is apparent

    大地水作為全球高程測量的理論,在現實工作中,國家或者地區高程系統的起算是利用驗潮方法來確定局部的,兩者之間的差距是顯而易見的。
分享友人