消散試驗 的英文怎麼說

中文拼音 [xiāosǎnshìyàn]
消散試驗 英文
slaking test
  • : 動詞1 (消失) disappear; vanish 2 (使消失; 消除) eliminate; dispel; remove 3 (度過; 消遣) pa...
  • : 散動詞1. (由聚集而分離) break up; disperse 2. (散布) distribute; disseminate; give out 3. (排除) dispel; let out
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 消散 : 1. (消失) scatter and disappear; dissipate; slake; evanish 2. [醫學] elimination
  • 試驗 : trial; experiment; test
  1. The water current flows over the top of the dentoid baffle to the hydraulic jump as additional momentum. while it is cooperated with a stilling basin, the flowing condition emerged in the basin may be improved greatly and the length and downstream water depth required by the basin can be decreased to a great extent. such an appliance may be also used to solve the problems of insufficiently dissipating water flow energy and aerating flow, which are often faced with those hydraulic engineering constraction as acted by high waterhead, great specific discharge and low froude number

    本文通過齒墩頂部的擴水舌所形成的附加射流,從上部射入水躍,即可改善力池內的水流流態,又可降低第二共軛水深,減小水躍長度,增進水躍能效果,同時還能解決大單寬、低佛勞德數條件下摻氣和能不足的問題,證實它是一種安全、經濟的能工。
  2. Pore pressure dissipation test

    室內土工孔隙水壓力消散試驗
  3. In this article, after point out the basic concept of the dve and the space and time consistency, the research and the performance space and time consistency significance, the artical carries on the introduction and the comparison connected to the domestic and foreign at present the research present situation. in this foundation, the author study related technology about how guarantees the space and time consistency, the unification management of overcoming the space and time inconsistency, first guaranteed the completeness of the technology ofovercoming the space and time inconsistent. then, through to the introduction and the comparison of the present wan simulation technology, the author establishes the simulated environment oneself, passed through to the independent experiment tests, confirms the simulated environment feasibility, the effectiveness. through moves the example procedure in the simulated environment, displays the space and time inconsistency elimination after adds on the unification management, and produces the empirical result. the article finally carries on the summary of the work which did to the present stage, and forecast the following work research direction

    本文在給出分式虛擬環境和時空一致性的基本概念,研究表現時空一致性的意義之後,對國內外目前相關的研究現狀進行介紹和比較。在此基礎上,作者研究了如何保證時空一致性的相關技術,克服時空不一致的統一管理,首先保證了克服時空不一致技術的完備性,進而,通過對目前廣域網模擬技術的介紹和比較,作者建立自己的模擬環境,經過獨立實證了模擬環境的可行性,高效性。通過在模擬環境上運行實常式序,表現出時空不一致在加上統一管理后除,得出實結果。
  4. Environmental testing - part 2 : tests - tests z bfc : combined dry heat vibration sinuso ? dal tests for both heat - dissipating and non - heat - dissipating specimens

    環境.第2部分:z bfc :熱和非熱樣的乾熱振動
  5. Environmental testing - part 2 : tests - tests z afc : combined cold vibration sinuso ? dal tests for both heat - dissipating and non - heat - dissipating specimens

    環境.第2部分:.z afc :熱和非熱樣的低溫振動
  6. Considering that the load was added in steps, dynamic design based on in - sile test parameter is an effective and practical method. based on the author ' s experience of djm composite ground engineering, and two projects of highway djm composite ground, it systemically analyzed and summarized the in - site test result as well as the settlement deformation, pore water pressure dissipation, deep horizontal displacement, stress ratio, stress of pile. etc. it also compares the in - site test results of djm composite ground with or without rigid bearing stratum, and draws many practical conclusions

    根據筆者多年粉噴樁加固路基工程的經,結合兩個高等級道路粉噴樁加固路基工程實例,全面系統地分析和總結了現場路段結果,對攪拌樁復合地基沉降特性、孔壓特性、深層水平位移特性、樁土應力比、樁身應變等作了深入細致地分析,對有硬持力層和無硬持力層(浮樁)的粉噴樁復合地基現場結果作了對比,得到了許多有應用價值的結論。
  7. In this article, a 74500dwt bulk carrier being built in our shipyard is taken for example. based on the calculations for the capacity required, two generator sets and a shaft generator are arranged for the power station on this ships. analyses are made on different units of each generator set, and some reliability tests have been carried out at the same time

    本文通過對工廠建造的74500t裝貨輪電站容量的計算,配置了兩臺柴油發電機組,並在主機的後部中間軸上安裝了一臺軸帶發電機,並對各發電機組的各個環節進行分析,進行必要的可靠性,並確定運行過程中的維修方案,從而確保船舶電站的正常可靠運行,而簡單的操作方法、簡便的維修、運行的低耗,體現了該船舶電站的實用性。
  8. The reliability is validated further on. 3. the static loading test is modeled by plaxis, based on this, the basic bearing mechanism is analysed which comprise the rule of the load - settlement curves, inner and outer friction resistance, end bearing, stress distribution along pile depth and the dissipation of excess pore pressures

    應用plaxis程序模擬單樁靜載荷的過程,並根據計算結果較為詳細的分析了pcc單樁的基本承載特性,主要包括荷載?沉降曲線的特徵、樁壁內外側摩阻力的分佈、樁端阻力的分佈、樁的軸向荷載傳遞以及孔壓規律等。
  9. Standard test method for electrical resistance of conductive and static dissipative resilient flooring

    導電的和靜態彈性地板材料電阻的標準方法
分享友人