涵管 的英文怎麼說

中文拼音 [hánguǎn]
涵管 英文
culvert pipe; pipe-shaped culvert
  • : Ⅰ動 (包含; 包容) contain Ⅱ名詞(涵洞) culvert
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  1. But after the " financial storm " that broken out in 1998, the business of fl company has been baddish. the problem was represented in much ways such as " target market sufficient ", " low management level ", " pool employee ' s diathesis " and so on

    但自從1998年東南亞金融風暴之後,公司原先的經營策略開始暴露出越來越明顯的劣勢,表面上看來,這是公司理不規范,員工素質低等原因造成的,但實際上這其中蘊著國內服裝行業的大趨勢和大動向。
  2. Ceibs case center s second case book, the selected cases of ceibs, was published by china citic press. the book includes 23 teaching cases in obhr, strategy, marketing, general management and entrepreneurship. one unique feature of this book is the insightful commentaries made by ceibs emba students

    2006年12月中歐案例經典體驗emba精英的頭腦風暴一書由中信出版社出版發行,該書共收錄了23篇中歐案例,蓋戰略營銷創業人力資源和綜合理等領域,並邀請了中歐國際工商學院院長朱曉明和萬科企業股份有限公司董事長王石作序。
  3. A comment upon gazdar ' s theory of contextual transform

    水壩泄水工程對頂施工技術
  4. We hold that the integrate effect consists of two parts : 1 + 1 > 2 and a + b = c, in terms of math : here x1, x2, . . . , xn : integrate units s : functions of new system what features an integrated system are subjective initiative, non - linear function, dynamic connection, sub - system uncertainty, selective competition. the basic factors of integration are integrate context, integrate units, integrate interface and environment, which form the integration condition respectively the basic integrate patterns covers point - to - point, pipeline and hub

    首先,深入探討了集成的內,即集成是指為了實現某一目標,在一定的集成環境中,若干集成單元動態地集合成一個泛邊界狀態的有機整體的過程,指出集成效應的數學解釋除了1 + 1 2外,還應該包括: a + b = c ,即若以x _ 1 , x _ 2 , … … , x _ n代表集成單元, s代表集成后新系統的總功能,那麼其特徵有:主體行為性、功能非線性、關系動態性、單元泛化性、選擇競爭性;集成的基本要素包括集成背景、集成單元、集成界面和集成環境等四要素;基本模式有點到點模式、線型模式和集線器型模式;基本條件有集成背景條件、集成單元條件、集成界面條件和集成環境條件。
  5. Supervision and maintainance of the highway bridge and culvert

    談公路工程橋涵管理與養護
  6. Standard practice for installing factory - made corrugated aluminum culverts and storm sewer pipe

    工廠制波紋鋁涵管和雨水安裝的標準實施規程
  7. The method of hydraulic calculation with non - pressure flow from the outlet pipe of the warping dam

    淤地壩涵管無壓流水力計算方法
  8. 3d modeling simulation and pressing optimization of pipe culverts under effect of road roller

    公路涵管填土碾壓的三維模擬與碾壓優化
  9. Standard specification for nonreinforced concrete sewer, storm drain, and culvert pipe

    無鋼筋混凝土下水道暴雨下水道和涵管的標準規范
  10. Standard specification for reinforced concrete d - load culvert, storm drain, and sewer pipe

    鋼筋混凝土d型承重涵管雨水和污水的標準規范
  11. Standard specification for reinforced concrete culvert, storm drain, and sewer pipe metric

    鋼筋混凝土製涵管雨水和污水的標準規范米制
  12. Standard specification for nonreinforced concrete sewer, storm drain, and culvert pipe metric

    無鋼筋的混凝土下水道暴雨下水道和涵管標準規范
  13. Standard specification for reinforced concrete d - load culvert, storm drain, and sewer pipe metric

    鋼筋混凝土d型承重涵管雨水和污水的標準規范
  14. Standard specification for nonreinforced concrete specified strength culvert, storm drain, and sewer pipe metric

    規定強度的無鋼筋混凝土涵管雨水和污水
  15. Standard specification for nonreinforced concrete specified strength culvert, storm drain, and sewer pipe

    規定強度的無鋼筋混凝土涵管雨水和污水的標準規范
  16. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  17. Standard practice for installation of precast concrete sewer, storm drain, and culvert pipe using standard installations

    使用標準設備安裝預制混凝土下水道暴雨下水道和涵管的標準實施規程
  18. His truck left the road, travelling from right to left. he slipped end - over - end, across the culvert outlet and landed on the left side of it

    他的卡車沖出了道路,從道路右側沖向左側。車頭尾翻轉穿越涵管,在涵管左側著陸。
  19. Standard specification for manufacture of reinforced concrete sewer, storm drain, and culvert pipe for direct design

    直接設計的鋼筋混凝土污水雨水涵管的生產標準規范
  20. Standard specification for manufacture of reinforced concrete sewer, storm drain, and culvert pipe for direct design metric

    直接設計的鋼筋混凝土污水雨水涵管的生產標準規范
分享友人