淤泥地 的英文怎麼說

中文拼音 [de]
淤泥地 英文
muck land
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • 淤泥 : sludge; ooze; slush; mire淤泥層 mud; 淤泥沉積 siltation; 淤泥沉積物 mud deposit
  1. On the slow weedy waterway he had floated on his raft coastward over ireland drawn by a haulage rope past beds of reeds, over slime, mud - choked bottles, carrion dogs. athlone, mullingar, moyvalley, i could make a walking tour to see milly by the canal

    他乘了這條用一根纖繩拽著的木排,順著涓涓流淌雜草蔓生的河道,涉過葦塘,穿過爛,越過一隻只堵滿的細長瓶子,一具具腐爛的狗屍,從愛爾蘭腹漂向海岸。
  2. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支護工程越來越多,綜合青島市區的質狀況,除海邊有砂性土及軟土外,大部分域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方面的重視。
  3. He tried to wrench it back, but the muck sucked viciously at his foot as if it were a giant leech.

    他掙扎著想拔出來,但就像一個巨大的水蛭一樣,緊緊吸住了他的腳。
  4. Research on fracturing grouting in soft flowing mucky clay

    軟流塑層劈裂注漿加固試驗研究
  5. Through indoor routine tests, the physical and mechanical natures of intact and remolding soil of muck and mucky soil, in fuzhou, are analyzed in this thesis. the results reveal that water content, void ratio, shear strength of remolding soil samples are lower than those of intact samples. then qualitative analysis on the mineral composition, chemical composition and microstructure characteristic and types of the soft clay is given

    本文通過室內常規試驗對福州質粘土的原狀土樣和擾動土樣的物理力學性質進行了分析,觀察土樣受擾動后一些物理力學指標的變化情況,發現擾動軟粘土樣的含水量、孔隙比、抗剪強度指標均比原狀土樣低;並從軟粘土的礦物成份、化學成份以及微觀結構特徵和類型上定性分析。
  6. Capping each backfilled pit with uncontaminated mud effectively isolating the contaminated mud from the surrounding marine environment

    利用未受污染覆蓋每個已回填的坑,以有效分隔污和附近的海洋環境。
  7. When excavating deep foundation ditch in the lake sediment that filled with deep and thick silt, it is a common technical problem that the upheave which caused by relief loads leading to slope destabilization

    摘要在湖泊相沉積的深厚土場開挖深基坑,由於坑底卸荷隆起導致基坑邊坡位移、失穩是常見的技術難題。
  8. The water mains had numerous breaks, with the great majority of the breaks occuring in sand, silt, or filled ground.

    自來水干線有許多處破裂,但絕大多數的破裂發生在砂淤泥地或回填土中。
  9. Based on the research of intertidal flat topography measure at home and abroad, this article avoids some problems troublesome, such as the dependence of the station of tide gauging, precise match of images and so on. first, we monitor soil water content of intertidal flat through building correlation model between soil water content of intertidal flat and landsat tm data, then we analyse the correlation between soil water content and topography of intertidal flat, last, we extract topography of intertidal flat combining with gis

    本文在總結國內外潮灘形測量研究的基礎上,避開對潮位站的依賴和影像精配準問題,以江蘇大豐港堤附近質潮灘為研究區域,通過遙感方法建立潮灘土壤水分與tu光譜值的定量數學模型,提取潮灘土壤含水量信息,然後通過潮灘土壤水分與形的定量關系,結合gis技術反演潮灘形。
  10. Members were concerned about the risk and alternative of treatment of contaminated soil as well as the liability for land contamination

    委員對處理受污染的的風險及不同方法,以及對土污染的責任表示關注。
  11. This article introduces the silt geology platform afterwards uses the powder spurts and the plastics drain off water the board and grille and back pressure protects etc design and the construction control of measure, the construction has the guidance meaning to the construction of the bridge abutment soft base

    摘要介紹了淤泥地質臺后採用粉噴樁、塑料排水板、土工格柵、反壓護道等措施的設計與施工控制,對臺后軟基處治工程的施工有指導意義。
  12. The application of vibrator simplex sand pile to treatment warp clay ground

    振動沉管灌注砂樁在處理質粘土基中的應用
  13. In order to search after its applying to expressway roadbed improvement, this paper studied consolidation characteristic and distortion law hi soft soil under positive and negative action, introducing parse explain and numerical calculation theory. additionally, based on locale experimentation, the design and construction method of vhlcp was implemented and its reinforce effect and economical character was estimated. testing indicated that the groundwork ' s intensity have increased 97 %, silt soil have vanished and outlay have saved 39 %

    根據現場試驗,確定了適合於高速公路工程要求的真空堆載聯合預壓的設計和施工方法,並分析評價了其加固效果和經濟性,試驗表明:應用真空堆載聯合預壓后,基強度平均提高了97 ,基中質土已消失;與粉噴樁加固基相比,節省經費39 。
  14. The ncd representatives then gratefully guided us to the hurricane - ravaged areas, which included several villages. however, access to one village of about 300 residents was fraught with danger due to high water and mud flows

    民防署幾位代表滿懷感激帶領我們前往災區,然而大約有將近300位居民散居的一些村落,對外通道卻因洪水與的威脅而充滿危險。
  15. For the area of tianjin port which is short of sandy material, cement solidified soil, used as a new type of fill material, can not only help reduce the long distance transportation of sand fill, save energy and cut down engineering cost, but also make full use of the mucky clay dredged from basins and waterways

    摘要採用水固化土作為新的充填材料,對于缺少砂土的天津港區,不僅可以減少砂料長途運輸,節省能源,降低工程造價,而且可以充分利用港池和航道開挖的質粘土。
  16. Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced

    文摘:本文介紹深厚填土場大型輸水干管工程的基處理,水攪拌樁復合基基礎設計與計算及過橋管、過堤管等的技術處理措施。
  17. Application of shallow earthquake reflection shooting in sludge thickness surveying in water intake of hydropower plant

    淺層震反射波法在探測水電站進水口厚度的應用
  18. The pore water pressure dissipation in the silt is produced mainly by lowering of groundwater table and pore water pressure dissipation in the pvds ( or sand drains ) is produced mainly by vacuum degree

    淤泥地基中孔隙水壓力消散主要是由於下水位線的下降引起的;而砂井或塑排中的孔壓消散大部分由真空度直接引起。
  19. Mud foundation treatment of shajing river embankment in baoan district of shenzhen city

    深圳市寶安區沙井河堤防淤泥地基處理
  20. The pore water pressure difference between silt and pvds ( or sand drains ) increases and the soil consolidation velocity is accelerated during the embankment construction

    在路基填築期間,淤泥地基與豎向排水體之間的孔壓差增大,加速土體固結。
分享友人