淤積三角洲 的英文怎麼說

中文拼音 [sānjiǎozhōu]
淤積三角洲 英文
sedimentation delta
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : Ⅰ數詞1. (二加一后所得) three 2. (表示多數或多次) more than two; several; many Ⅱ名詞(姓氏) a surname
  • : 角Ⅰ名詞1 (牛、羊、 鹿等頭上長出的堅硬的東西) horn 2 (古時軍中吹的樂器) bugle; horn 3 (形狀像...
  • : 名詞1. (大陸和附近島嶼的總稱) continent 2. (河流中由沙石、泥土淤積而成的陸地) islet in a river; sandbar
  • 淤積 : silting-up; deposit; sedimentation
  1. Some factors affecting the alluvion and erosion of the yellow river delta are given and analyzed, including human activities, global warming and sea level rise, deep structure, deposits in the delta, local climate, some ocean factors such as current, wave, tide

    此外,本文還分析了地質構造、沉相和沉物、氣象條件、海洋動力、海平面升高、人類活動等因素對黃河的沖演變的影響。
  2. A statistical model is developed and indicates high correlation between the accretion of modem yellow river delta and the water and sediment discharge of yellow river, and the model shows the necessary water and sediment discharge per year to ensure the equilibrium of alluvion and erosion of yellow river delta

    黃河凈造陸面與黃河入海水沙量的統計模型說明,黃河動態平衡時的黃河入海徑流量為71 . 93億m ~ 3 a ,輸沙量為1 . 853億t a 。
  3. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃河演變時,從1976年黃河改道清水溝流路入海到2000年,整個黃洞凈造陸201 . 5km ~ 2 ,有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口河嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;清水溝河嘴大量速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;清水溝河嘴南側到支脈溝一段岸線與刁口河嘴以西到灣灣溝一段岸線基本穩定。
  4. Sediment deposited by flowing water, as in a riverbed, flood plain, or delta

    層河床、洪水淹沒的平原或中的流水所產生的沉
  5. Look from the vertical section plane, project two have not the delta conformation of fill up. project one lost the effectual contains of reservoir. in opposition, project two lost the dead contains. during the experiment of the local former in front of the dam, the quantity of the sandiness out the reservoir appears that lot of sandiness passed the bottom hole and little passed the electricity plant and the water gap

    方案二與初設方案運用對比,方案二總量明顯減少,從縱剖面看,方案二無明顯形態,而初設方案運用30年形態具有明顯的形態,從庫容變化看,初設方案運用主要損失有效庫容,而方案二則相反主要損失死庫容。
  6. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉分配的過程來看:與濱海區泥沙的沉變化趨勢是基本一致的,各部位的泥沙沉比例變化基本呈波動狀態,且與濱海區泥沙的沉比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉量; 、 5 )本項研究首次論證了河口岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
分享友人