深井裝置 的英文怎麼說

中文拼音 [shēnjǐngzhuāngzhì]
深井裝置 英文
deepwell installation
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 深井 : bore深井泵 bore hole pump; [機械工程] deep-well pump; 深井潛水泵 deep well submerged pump
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及斤載荷試驗四方面進行了入討論;本文作者根據多年現場載荷試驗的工程實踐,對荷試驗的核心部分? ?反力,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. Now the improved and optimized proper accessories such as shock absorber, pass - by sub, perforating materials, detonating device and packings, etc., meet the above needs in this kind of wells

    通過改進和優化減震器、旁通接頭、射孔器材、起爆以及密封件等器材,滿足了高溫高壓超射孔測試聯作的要求。
  3. Gg also owns 8 modern ship yards in norway specialized in fabrication of fpso, drilling rigs, semisubmersibles, subsea equipments and topside modules

    戈朗海工在挪威還擁有8家現代化專業化造船廠,致力於生產建造fpso 、各類鉆機、半潛式鉆平臺、海採油和各類採油生產和加工的上層模塊。
  4. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安在模擬試驗中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  5. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對底巖石的受力狀態以及鉆頭的工作環境和特性加以分析的基礎上,藉助原有的架、平臺等設備,研究設計了模擬6000米底壓力壞境的高壓模擬筒、鉆柱高壓轉聯器、鉆液高壓模擬系統以及高壓除砂器等機械,並研究了底四維模擬壓力(上覆壓、圍壓、孔隙壓和液柱壓)的產生、控制及其控制的建模與模擬,從而實現至6000米的四維底壓力環境的模擬。
  6. They then visited a flat in block e to have a better understanding of the bathroom setting of a typical household in amoy gardens, where coronavirus was suspected to have spread through dried - up u - traps, facilitated by powerful exhaust fans and the light well effect

    小組接著到訪E座一個單位,入了解淘大花園一般住戶的浴室;冠狀病毒懷疑透過乾涸的聚水器,及啟動強力的抽氣扇和天效應加速在屋苑擴散。
  7. Guide rail mounting brackets shall be furnished to stabilize the guide rails for installation in deep wet wells

    應該在平臺上配導軌,以便在裡安時能夠穩定導軌。
  8. In chapter six, based on the preceding chapters " research, the practicality of the full scale dr i 11 ing simulating test device has been tested by the debugging and the performance test. under simulating drilling conditions, the rock mechanical properties and the bits " dynamical tests are analyzed and set forth specifically. at the same time the effect of bottom pressure difference on the oil field exploration and development has been discussed

    第六章在前述分析研究的基礎上,通過對模擬的系統調試及性能測試,驗證了全尺寸鉆模擬的實用性,在鉆模擬條件下對巖石的機械性質、牙輪鉆頭動態測試給予了具體的分析闡述,同時還分析探討了底壓差對油田勘探開發的影illb ,並且為宋101的實際施工作業提供了非常有價值的指導參數。
  9. This paper presents the study of the full scale drilling simulating test device under the condition of bottom hole pressures. this device is the first one in china hich can simulate the bottom hole pressures in 6000m deep well

    本文研究論述的全尺寸鉆底壓力模擬,是我國第一臺模擬6000米壓力環境的全尺寸鉆模擬試驗
分享友人