深孔勘探 的英文怎麼說

中文拼音 [shēnkǒngkāntàn]
深孔勘探 英文
deephole prospecting
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  1. Finally, it also discusses the sign ifi cance of thermal fluid flow to pool - forming dynamics : ( 1 ) provides a new ex planation way to abnormal vitrinite reflectance, which can enlarge the fields of hydrocarbon exploration and development ; ( 2 ) provides some important evidences to research of hydrocarbon migration, which support to choose exploration targ e ts ; and ( 3 ) provides means to study diagnesis and porosity evolution of reservo ir rocks, which can be used to predict the development units of deep reservoir s

    最後,討了熱流體活動對成藏動力學研究的重要意義,認為其可為有機質演化異常提供新的成因解釋途徑,擴大油氣領域;為油氣運移的研究提供線索,優化目標選擇;為成巖-隙演化的動態研究提供依據,預測部儲層發育層段。
  2. After synthetic evaluation to the permian reservoir, it was considered that there were deep lake facie in mazhong - heidun - shibandun structure zone, it was suitable to depositing thick carbonate rock. these cracks were developed in the zones where the stress was concentrated. these zones are fairly good oil and gas exploration areas.

    對三塘湖盆地二疊系儲層進行綜合評價后,認為:該區馬中?黑墩?石板墩一帶屬半湖沉積亞相,有利於碳酸鹽巖的沉積,儲集體沉積比較厚,並且此帶屬于應力集中的變形強烈帶,故裂縫較發育,從而成為最有利油氣區,其次有利區為牛圈湖構造帶,這主要是由牛圈湖地區的顆粒溶較發育所致。
  3. The moving velocity in the vetical direction of the saline water was determined by comparison of buried depth saline water in observation wells at different period with distrabution of dring wells

    垂向運移特徵系根據油田開發過程中的鉆分佈特點,通過對各地區,不同時間段鉆測井資料中鹹水體埋變化比較,確定不同地區鹹水體的垂向運移速率。
  4. This paper has described in brief hydrogeological and geothermal conditions of longmen state grain depot in luoyang city, analyzed and interpreted integrated geophysical data obtained from the exploration locating of hot water and cool water wells over the same concealed fault in this area and, on such a basis, determined sites and depths of the drill wells

    摘要簡要介紹了洛陽市龍門國家糧庫所在地水文地質和地熱地質條件,分析解釋了在該區同一隱伏斷裂構造上進行熱水、涼水井定位時取得的綜合物資料,並據此確定了鉆井位及
  5. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356根打入樁、靜壓樁、灌注樁的現場試樁資料(其中打入樁67根,靜壓樁121根,鉆灌注樁168根,並有詳細的地層資料,樁資料,荷載沉降?曲線)對西安黃土地基中的打入樁、靜壓樁、灌注樁的荷載傳遞機理進行了分析研究,認為用雙曲線型的荷載傳遞函數模擬樁土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  6. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區鉆灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
分享友人