深層粘土流 的英文怎麼說
中文拼音 [shēncéngniántǔliú]
深層粘土流
英文
deepseated clay flowage- 深 : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
- 層 : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
- 粘 : 粘動詞(粘附) glue; stick; paste; adhere to; bond
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 深層 : deep (layer); deep (stratum)深層采水 [海洋學] deep-casting; 深層語法 deep grammar
-
The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds
江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下連續墻結構,並獲得成功。In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied
其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。On the basis of the monitoring results of land subsidence and calculation of deep groundwater resources by using water balance method, it is shown that the leakage recharge from its upper shallow groundwater account for approximately 38. 2 %, drainage of the clay layers, about 41. 3 %, water release from the aquifers, around 5. 6 % and lateral inflow, some 14. 9 %, of the total groundwater resources
摘要根據天津平原地面沉降監測結果,採用水量均衡法,計算出深層地下水開采量中,淺層地下水越流補給量佔38 . 2 % ,粘土性壓密釋水量佔41 . 3 % ,彈性釋水量佔5 . 6 % ,側向流入量佔14 . 9 % 。It is therefore of great theoretical and practical significances to make carefully and systematically studies on the theories of both small - strain and large - strain consolidation of layered soft clayey soils with non - linear and rheological properties
因此系統深入地開展更貼近實際的成層軟粘土地基大、小應變非線性流變固結理論研究具有重要理論和實際意義。分享友人