深成粘土 的英文怎麼說

中文拼音 [shēnchéngnián]
深成粘土 英文
hypogene clay
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  1. The soils ( paleudults ) consist predominantly of light brown fine loamy sand to fine sandy loam changing with depth into a brown sandy clay loam and sandy clay with red mottles

    壤(強發育濕潤老)主要為淡棕色細壤質砂到細砂質壤,隨著度增加,壤變為棕色砂質和帶有紅色斑點的砂質
  2. As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil

    歸納起來,具體的研究和所獲得的一些重要果如下: 1 、結合本人的設計專利? 「鋼筋混凝網格式加筋擋墻」及工程實踐,在對加筋的加筋機理、破壞模式、承載力和穩定性等方面進行入分析的基礎上,提出了一個新概念,即經過加筋后的體作為復合結構與原體相比,不僅提高了內聚力,而且也提高內摩擦角;並在此前提下首次導出拉力破壞和著破壞兩種情形下的承載力公式,然後進行了穩定性分析。
  3. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距長江幹流僅250m ,與長江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質及松軟層較厚,基巖頂面起伏較大,且存在斷裂構造,層具明顯的流變特性。北錨碇基坑為長60m 、寬50m 、48m的矩形超基坑,其基礎圍護在國內首次採用矩形地下連續墻結構,並獲得功。
  4. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層度最達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  5. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外厚覆蓋層基礎防滲設計、壩基混凝防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究果的基礎上,對心墻和壩基垂直防滲方案、瀝青混凝心墻和壩基垂直防滲方案以及斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  6. In this paper, on the foundation of synthesizing engineering practice and study result of planted bar technique by chemistry glue on the domestic and international, embedded experiment study and theories analysis are done about bonded anchor behavior of chemistry planted bar anchorage behavior in this paper, the experimental results of 32 pulling resistance test ( meiya z3530 ) are given, considering some factors to affect bonded anchor behavior of chemistry planted bar such as the strength of concrete anchorage lengths diameter of steel bar and holes thickness of the protecting layer confecting circumstance of the hoop bar and quantity of construction especially which is very easy to be neglected and so on, and bonded anchor mechanism failure mode load carrying capacity and slide behavior are analyzed in - depth

    本文在綜合國內外化學膠植筋技術的工程實踐和研究果的基礎上,對化學植筋的結錨固性能作了較入的試驗研究和理論分析。文中通過32個化學膠(美亞z3530 )植筋試件的拉拔試驗研究,考慮混凝強度、錨固長度、鋼筋植筋、鉆孔孔徑、保護層厚度、箍筋配製情況及施工質量等因素對植筋結性能的影響,特別是植筋的施工質量對結性能的影響是比較容易被忽視的因素,對化學植筋的結錨固機理、破壞形態、承載力及滑移性能作了比較入的剖析。
  7. The strengthening method of mixing is to use the cement as curing agent and use the special machine to mix up the soft clay and the cement to make the soft subgrade become the compound subgrade that has concreteness ; stability of water and enough strength

    攪拌法加固技術是利用水泥等作為固化劑,通過特製的層攪拌機械在地基中將軟和水泥強制拌和,使軟弱硬結具有整體性,水穩性和足夠強度的地基
  8. It is therefore of great theoretical and practical significances to make carefully and systematically studies on the theories of both small - strain and large - strain consolidation of layered soft clayey soils with non - linear and rheological properties

    因此系統入地開展更貼近實際的層軟地基大、小應變非線性流變固結理論研究具有重要理論和實際意義。
  9. Today, the criterions for anti - seismic design are very simple. in order to solve the problems in anti - seismic design, the research is carried out the work that has been done include the following aspects : ( 1 ) based on the deep analysis of the basic discipline of friction - reinforced theory and pseudo - cohesion concept, failure modals that can be existed in the reinforced earth retaining wall and their prevention measure and calculational methods are analysed and summarized

    本文主要針對加筋擋墻抗震設計中存在的問題展開研究,主要研究內容和取得的果如下: ( 1 )利用摩擦加筋原理和準聚力理論對加筋的基本原理進行了入分析,對加筋擋墻可能存在的各種破壞模式及其防治措施、計算方法等作了入分析和總結。
分享友人