深水圍堰 的英文怎麼說

中文拼音 [shēnshuǐwéiyàn]
深水圍堰 英文
deep-water cofferdam
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞(較低的擋水建築物) weir
  • 深水 : deepwater
  1. The design amp; construction of single - wall steel pile cofferdam in deep water

    基坑單壁鋼板樁設計與施工
  2. Application of steel sheet pile cofferdam on excavation of deep water foundation pit

    鋼板樁基坑開挖施工中的應用
  3. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用下巖石爆破,浮運鋼就位、封底、人工挖孔樁等施工技術解決海上、河床陡峭且無覆蓋層的基礎施工難題。
  4. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘墩採用的築島、下沉混凝土施工方案,以及54 ~ 58號中墩採用的雙壁鋼結構施工方案。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石基礎處理與施工技術;大江截流上下游土石平拋墊底研究;二期防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石基礎處理與施工技術;大江截流上下游土石平拋墊底研究;二期防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  7. The construction technology of the thin - wall caisson used in drilled pile foundation

    高壓旋噴樁配合雙壁鋼承臺施工中的應用
  8. The characters of the steel round the barrage are : very convenient in producing and section, fast in construction and in good quality. so, it has been adopted in many bridge ' s deep water foundation in our country

    這種結構型式,製造及拼裝都很方便,施工速度快,質量好,因此國內多座橋梁的基礎相繼採用了這一結構形式。
  9. Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described

    摘要以蘇通大橋近塔墩主6號承臺鋼工程實踐為基礎,介紹該橋雙壁鋼設計、施工的關鍵技術。
  10. At first, i analyses the geological characters, and studies the procedure of the construction of deep water pile foundation of the highway bridges. then i put forward two programs of the construction in this condition : one is the construction of the steel round the barrage before the bore peg ' s, the other is on the contrary, and compare the shortcomings and the advantages of those

    本文通過對巖溶地區公路橋梁樁基礎施工的地質特徵分析,研究了樁基施工程序,提出了在巖溶地質條件下先下鋼后施工鉆孔樁和先成樁后施工鋼的兩種施工方案,並對兩方案的優缺點進行了分析比較。
  11. With the development of construction technology and mechanic about deepwater foundation, hanging box weir had being applied widely for construction of high pile cap

    隨著基礎施工技術和機械的發展,吊箱在高樁承臺施工中的應用日益廣泛。
  12. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年文資料、地質情況,分析了天興洲長江大橋北汊中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及的方案比選,總結了該橋的施工方法。
  13. The three gorges dam will be the largest hydropower station and dam in the world, with a 1. 2 mile stretch of concrete and a 370 mile - long reservoir and 525 feet deep

    工程完成後,三峽將成為世界上最大的力發電站,擁有1 . 2英里長的混凝土縱向、 370英里長、 525英尺庫。
  14. The construction method using steel boxed cofferdam is a chief method for construction of pile caps in deep water

    摘要鋼吊箱施工方法是承臺施工中的一種主要施工方法。
分享友人