深水圍堰 的英文怎麼說
中文拼音 [shēnshuǐwéiyàn]
深水圍堰
英文
deep-water cofferdam-
The design amp; construction of single - wall steel pile cofferdam in deep water
深水基坑單壁鋼板樁圍堰設計與施工Application of steel sheet pile cofferdam on excavation of deep water foundation pit
鋼板樁圍堰在深水基坑開挖施工中的應用In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging
摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway
摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘墩採用的築島、下沉混凝土圍堰施工方案,以及54 ~ 58號深水水中墩採用的雙壁鋼結構圍堰施工方案。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。The construction technology of the thin - wall caisson used in drilled pile foundation
高壓旋噴樁配合雙壁鋼圍堰在深水承臺施工中的應用The characters of the steel round the barrage are : very convenient in producing and section, fast in construction and in good quality. so, it has been adopted in many bridge ' s deep water foundation in our country
鋼圍堰這種結構型式,製造及拼裝都很方便,施工速度快,質量好,因此國內多座橋梁的深水基礎相繼採用了這一結構形式。Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described
摘要以蘇通大橋近塔墩主6號承臺鋼圍堰工程實踐為基礎,介紹該橋深水雙壁鋼圍堰設計、施工的關鍵技術。At first, i analyses the geological characters, and studies the procedure of the construction of deep water pile foundation of the highway bridges. then i put forward two programs of the construction in this condition : one is the construction of the steel round the barrage before the bore peg ' s, the other is on the contrary, and compare the shortcomings and the advantages of those
本文通過對巖溶地區公路橋梁深水樁基礎施工的地質特徵分析,研究了深水樁基施工程序,提出了在巖溶地質條件下先下鋼圍堰后施工鉆孔樁和先成樁后施工鋼圍堰的兩種施工方案,並對兩方案的優缺點進行了分析比較。With the development of construction technology and mechanic about deepwater foundation, hanging box weir had being applied widely for construction of high pile cap
隨著深水基礎施工技術和機械的發展,吊箱圍堰在高樁承臺施工中的應用日益廣泛。With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge
摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及圍堰的方案比選,總結了該橋深水鋼圍堰的施工方法。The three gorges dam will be the largest hydropower station and dam in the world, with a 1. 2 mile stretch of concrete and a 370 mile - long reservoir and 525 feet deep
工程完成後,三峽將成為世界上最大的水力發電站,擁有1 . 2英里長的混凝土縱向圍堰、 370英里長、 525英尺深的水庫。The construction method using steel boxed cofferdam is a chief method for construction of pile caps in deep water
摘要鋼吊箱圍堰施工方法是深水承臺施工中的一種主要施工方法。分享友人