深海工程 的英文怎麼說

中文拼音 [shēnhǎigōngchéng]
深海工程 英文
deep-ocean engineering
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 深海 : abysmal sea; abyssal sea; deep sea深海捕撈 deep sea fishing; 深海捕魚 deep sea fishing; 深海采礦 ...
  1. During construction of donghai bridge of yangshan deep - water port, bedrock bench mark, which is an important surveying datum mark, played an important part in control survey and elevation transmission

    摘要基巖標是重要的測量基準設施,在洋山水港東大橋的建設中發揮了控制測量與高傳遞的重要作用。
  2. Reclamation of or other works over and upon the government foreshore and sea - bed at the sham chun river in lok ma chau

    在位於落馬洲圳河的政府前濱及床進行填或在有關政府前濱及床及其上進行其他
  3. After three years working experience, we has achieved many design projects successfully includes, the second stage landscape engineering design of huankou garden developed by wuhan real estate investment group, the planning design and architecture design of zonglian international residential district developed by wuhan zonglian investment co., ltd, phoenix town developed by wuhan huayi real estate co., ltd, chutian thermal spring hotel developed by liannin jingjiang tourism company, enshi genevese amorous district, the landscape design for new office building of wuhuan tech joint - stock co., ltd, landscape design for headquarter of zhongye southern engineering technical co., ltd, office and technical research building of zhongtie 11 bureau, landscape design for the xiangshan minyuan developed by yichang hongxiang group co., ltd, planning for the tingtao guanhai district developed by wuhan hongyu industry co., ltd and etc. all of the projects above got the good estimate form our clients

    公司成立三年以來,出色地完成了多項設計作,其中包括武漢地產開發投資集團的漢口花園二期景觀設計、武漢眾聯投資有限公司的眾聯國際小區的規劃、建築設計、武漢市華盈房地產有限公司的鳳凰城、咸寧錦江旅業公司的楚天溫泉假日大酒店、恩施日內瓦風情小區、五環科技股份有限公司新辦公大樓景觀設計、中冶南方技術有限公司總部景觀設計、中鐵十一局集團有限公司辦公科研樓、宜昌弘洋集團公司的香山銘苑景觀設計、武漢宏宇實業有限公司的聽濤觀的規劃、建築與景觀設計等項目,受各開發商和業主的好評。
  4. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,基坑支護越來越多,綜合青島市區的地質狀況,除邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施時需要爆破施,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護越來越引起了各方面的重視。
  5. 78 on its journey to island harbourview will continue to be re - routed via cherry street westbound, hoi king street northbound, pok man street westbound and sham mond road northbound before resuming its normal routeing, to facilitate the works of kcrc kowloon southern link

    78號往維港灣途中,將繼續改經櫻桃街西行景街北行博文街西行及旺道北行,然後恢復行走原來路線,以便進行九鐵九南線的
  6. 2. shallow sea seismic survey for the install project of waste pipe

    2 .圳市污水排乾管頂管上地震勘探
  7. Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall

    文摘:本文通過錢塘江聞家堰基坑開挖埋管,替代原設計頂管方案,具有投資省、施簡單、期短,且便於檢查取水管與塘之間防滲措施
  8. Application of method of disposing for quick dike building on undersaturated weakground

    水軟基快速處理方法在中的應用
  9. Based on the data of pile driving records of a great number of piles in offshore platforms and the project about driveability analysis of super large diameter, super length, deep penetration pile of one oil - gas field in our south sea , simultaneously, following up the front of the research of pile driving, studies have been performed as followings : 1

    本文緊密結合大量實測數據和我國南某大型油氣田開發所提出的平臺超大直徑、超長、貫入樁基的動力打樁可打入性和承載力的高精度預測分析研究課題,同時跟蹤本學科前沿領域,對以下幾個方面進行了較為入的探討和研究。
  10. After analyzing the character of risk, i introduce data mining method into risk management, to solve the contradiction between great capacity of data and lack of information, the methods include mathematics statistics and artificial neural network ( ann ). then, i study on the methods of risk management in risk identification, risk evaluation and risk disposal, what is advanced, fault tree analysis method based on fuzzy probability, stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk. finally, i discussed the application of information system ( mis ) in project risk management, and developed a risk management information system

    論文在入分析了風險特徵之後,將數據挖掘技術引入風險管理,用以解決量數據與貧乏信息之間的矛盾,所採用的技術有數理統計和人神經網路( ann )兩種方法;接著,論文對風險識別、風險評價、風險處理中的風險管理方法進行了研究,所提出的基於模糊概率的故障樹技術、隨機模擬技術和基於區間數的topsis方法都體現了風險管理的特點;最後,論文對信息系統( mis )在項目風險管理中的應用進行了探討,開發出一個風險管理信息系統。
  11. This paper discusses the method of measuring engineering parameters of deep ground earth in coastal area and analyzes the distortion of the parameters according to an engineering example

    摘要通過實例探討確定濱地區層地基土性質指標的方法,分析測試指標的失真問題。
  12. With its rapid expansion in china, hyder consulting limited is seeking professionals at all levels from graduates, senior and principle engineers to associates who are willing to work in either shenzhen office, guangzhou office, or shanghai office

    基於安誠在中國的迅速發展,我們特此招聘各個層次的專業人才,從本科畢業生、助理師一直到高級師和主任師,他們可以在圳、廣州和上的分公司作。
  13. A deep foundation pit engineering in shanghai is adopted as an example. the factors of design, construction and nature environment on effect of internal force and deformation for a retaining structure are studied in detail through the example. these factors include the rigidity of retaining wall, rigidity and site of support rod, space - time effect of pit excavation, water environment of foundation pit etc. some useful conclusions of controlling deformation of foundation pit are obtained through the study

    以上基坑為原型,利用有限元序,詳細探討了支護墻剛度、支撐剛度及位置、基坑開挖的時空效應、基坑周圍水環境等設計、施和自然環境因素對支護結構內力和變形的影響,提出了一些控制基坑變形的方法措施,為基坑的設計和施提供了依據。
  14. Based on an analysis of causes and basic characteristics of drought in north and south areas of china, it is pointed out that drought in north areas, such as the yellow river basin and the huaihe river basin, was characterized by the severe systematic demand - supply contradiction resulted from the shortage of water resources, and successive drought disasters intensified by hot and dry weather, and that drought in south areas was characterized by the occurrence or successive occurrence of dry years due to hot and dry weather and the seasonal water shortage induced by their geographic and climatic features and insufficient water supply capacity

    摘要以區域乾旱特徵分析以及乾旱災害應對策略研究為目的,闡述我國南、北方兩種不同地域類型的區域乾旱成因和基本特徵,指出黃淮區域的乾旱特徵主要表現在天然水資源短缺引發的系統性度供需矛盾,以及晴熱少雨氣候加劇這種矛盾而產生的持續乾旱災害;南方地區的乾旱特徵主要表現在晴熱少雨氣候導致枯水年或連續枯水年出現,以及地理氣候特徵和供水容量不足等因素產生的年內季節性乾旱缺水。
  15. A number of statistical and analytical works have been done by the institutions such as thethird shipping affair engineering and relonnissanle design institue of ministry of communications, hohai university, yangize valley water hudroprower planning and institule, nanjing hydraulic research institute and so on [ 25 - 30 ]. in 1993, the correlation analyses based on the data from the short - term situ - observation at near sea - route of the yangtse river estuary and the ship - stations were carried out to deduce the wave factors used in the engineering design

    交通部第三航務堪察設計院、河大學、長江流域水利規劃設計院、南京水利科學研究院等單位曾作過不少統計和分析作[ 25 - 30 ] ,在九十年代前期,人們曾根據長江口水航道或附近短期實測資料與引水船站進行過相關分析,進而推算出設計波要素。
  16. Despite having spent hk 1, 700 million on this shenzhen river regulation project, the shenzhen government still thinks the river is too polluted and that the next course of action is to spend a further rmb 950 million to build a pumping station at sha tau kok and a 13 km long pipe to bring water from mirs bay to flush the shenzhen river

    雖然這項圳河調整耗資港幣17億,但圳特區政府認為河道污染情況仍然嚴重,因此計劃進行次階段:耗資9 . 5億人民幣在沙頭角與建一座抽水站和13公里長的管道,把大鵬灣水引進圳河。
  17. In this dissertation, based on the field data of using prefabricated plastic drains improving soft clay foundation of filling - sea project in the shenzhen gulf, the qualitative and quantitative analysis of many factors of theoretic calculation way used in prefabricated plastic drains design were done, which could be a reference to choose the theoretic calculation way in other projects

    本課題根據所收集到的圳灣填中塑料板排水法處理軟粘土地基的實測資料,對塑料板排水法處理軟粘土地基的理論分析計算中通常要考慮的各種要素進行了定性或定量分析,可作為同類中選擇理論計算方法的參考。
  18. We are seriously concerned that due to the collapse of the newly constructed seawall in area w30 of the tseung kwan o reclamation contract ( tko contract ), the planned delivery of 3. 6 million tonnes of public fill from the tko contract to the pbr1 contract could not be made. instead, marine sand had to be used in the pbr1 contract

    委員會切關注到,在將軍澳填合約( 「將軍澳合約」 )第w30區新建的堤倒塌,以致利用將軍澳合約為竹篙灣第一期填合約供應360萬公噸公眾填料的計劃未能實現,而須在竹篙灣第一期填合約中使用砂作為替代。
  19. Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns

    這些務計劃包括了道路改善(例如青衣北岸道路、青山公路和粉錦公路) 、元朗及圳河的排水渠改善、其他各類計劃的地盤平整及斜坡、填土及加筋填土、填、開鑿巖石隧道及巖洞等。
  20. 12. gpr detecting of the backfilling project of shenzhen bay

    12 .圳灣填探地雷達檢測
分享友人