  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對面板堆石的導流渡汛標準、導流方式及其選擇、施工期渡汛及體填築分期、圍堰設計以及施工方案及總進度等與面板堆石特點有關的問題進行研究,為工程建設提一定的參考。
  2. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用塞,其它部位採用半透水料置換,並根據本工程特點在下游腳加設了反濾層.為提高基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石的設計和研究提參考與借鑒
  3. Using the three ? arameter solid model and the burgers four - parameter model to fit the creep curve separately, it was found that the burgers model can describe the creep process more well, and then provide parameters for finite element analysis of asphalt concrete cores for embankment dams

    用三元固體模型和burgers四元模型來擬合瀝青的蠕變曲線,發現burgers模型能夠更好的描述瀝青的蠕變過程,為瀝青心墻的有限元計算提參數。
  4. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出體的拱冠梁剖面和體中心縱剖面的溫度等值線圖、拱冠梁剖面和體上下游面應力等值線圖、肩最大最小應力沿高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓的設計和施工中採取相應的溫控措施提了參考依據。
  5. Literally thousands of concrete dams are providing water supply shortage, irrigation, flood control, and power generation.

    可以毫不誇張地說,有成千上萬座正在灌溉,給水、防洪、發電之用。
  6. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能成套技術研究」 ; 4 .水利部「水工抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能技術、上海寶鋼礦石碼頭鋼筋防腐蝕技術、江陰長江大橋大體積粉煤灰技術、南京長江二橋泵送技術等提咨詢建議。
  7. According to the concrete ages of different grout compartments, the concrete temperature rising process and the arching temperatures etc., aiming at the optimization of technology and economy, the paper studies systematically the feasibility of applying different temperature control measures in different seasons and at different elevations ; and obtains characteristic parameters of arch dam temperature fields and stress fields so as to provide a basis for construction units to implement second stage cooling or third stage cooling according to particular demand at that time

    為了達到技術上與經濟上雙優的目的,根據不同灌漿區的齡欺、溫升過程、封拱溫度等,系統研究了在不同季節里、在不同高程上採取不同溫控措施的可行性,得到了拱溫度場與應力場的特徵參數,為施工單位根據當時的特定需要,進行二期冷卻或三期冷卻提了依據。
  8. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大基礎防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大施工填築竣工期、水庫蓄水運行期防滲墻的應力和變形隨墻體參數的變化而變化的規律,為大安全設計及防滲墻墻體材料的選擇提了理論依據。
  9. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,型的選取顯得尤為重要,特別對于基有深厚覆蓋層的堆石,心墻和基防滲墻的應力和變形是體、基最敏感的部位,設計方案是否安全、科學和合理,對大防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、防滲墻與體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提了參考;在吸收和歸納了國內外堆石的設計研究成果的基礎上,對粘心墻和基垂直防滲方案、瀝青心墻和基垂直防滲方案以及粘斜心墻和基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大防滲體與基礎防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案體,尤其是防滲體的應力和變形分佈規律,為型選擇、體結構設計、基礎防滲墻與體防滲體的結合型式以及塑性區大小的確定提了重要依據。
  10. Optimal design and key technology of concrete supply line for longtan hydropower project

    龍灘大料線的優化設計及關鍵技術
  11. Optimal design of material transportation line of the concrete for longtan hydropower station

    龍灘水電站大料線的優化設計
  12. Through the analysis of above result, the distribution law of the temperature field and thermal stress field of 6aa dam section and f6 fault concrete tuck can be generally understood, and it provides scientific reference for the structure design and the selection of construction schemes

    通過分析上述成果,可全面了解6aa段及f6斷層塞的溫度和應力分佈規律,為結構設計和施工方案選擇提科學依據。
  13. The change laws of temperature field along with time and its distributions are provided in the calculation results, which offers the reliable basis for the corresponding temperature control measures taken in a rcc arch dam design and construction

    計算成果給出了溫度場分佈及其隨時間變化規律,為某碾壓的設計和施工中採取相應的溫控措施提了參考。
  14. ( 6 ) based on the parameters achieved in the rockfill creep experiments, the deformation characteristics of dam body of gongboxia cfrd are studied through a contrast between considering rockfill creep deformation factors and not considering them. the rationality of the present creep model and the reliability of its creep parameters are verified. and an important reference to the design and construction of new building cfrd is offered

    ( 6 )根據堆石料流變試驗所得的流變模型參數,對新建的公伯峽水電站面板堆石進行了計入和不計入流變因素的體變形特性分析計算,研究了堆石體流變對面板應力變形特性的影響,為新建的設計和施工提了重要的參考依據。
  15. Therefore it provides a new effective way for discerning elastic parameters of concrete dam body and rocky foundation

    從而為識別體和巖石基礎彈性常數提了一條新的有效途徑。
  16. The measure gives a new way to treat the cracks on the surface of exposed - in - winter placing layer of rcc dam in harsh climate region

    該項措施為解決嚴寒地區碾壓越冬水平層面開裂問題提了一條新途徑。
  17. 4. by comparing the concrete arch dam with mgo with the concrete arch dam without mgo, the feasibility of the fast construction technology of arch dam with mgo concrete was verified, which provided scientific evidence for the application in concrete arch dam with mgo admixture

    4 、通過對摻mgo和不摻mgo的分析比較,進一步驗證了外摻mgo快速築拱技術的可行性和科學性,為外摻mgo在拱上的應用提了科學依據。