混凝土包圍的 的英文怎麼說
中文拼音 [húnníngtǔbāowéide]
混凝土包圍的
英文
concrete enveloped- 混 : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
- 凝 : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
- 圍 : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
- 的 : 4次方是 The fourth power of 2 is direction
- 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
-
It focuses on the theory of the mineral functional materials " improving the anti - chloride permeability and the chloride binding. the main achievements of this article include : 1 ) use the technology of xrd, sem, bet, laser particle size distributor etc to test the component, the construction, particle size distributor, specific surface etc of micro - silica, ultra - fined slag, high quality fly ash, meta - kaolin clay, four types of the mineral functional material, theoretically analysis the functions which the four mineral functional minerals act on cement concrete, namely pozzolanicity effect, filling effect, micro - aggregate effect, surface adsorption effect and so bring into play the affect of plastification, lowing of temperature, reinforcement, improvement of durability. base on this analysis we can conclude that the proper diameter of the mineral functional material is 5 m - 15 m, that is blain fineness 4500cm2 / g - 7500cm2 / g
本論文的主要成果包括以下幾個方面: ( 1 )採用xrd 、 sem 、 bet 、激光粒度分析儀等多種測試手段,探明了以硅灰,超細磨粒化高爐礦渣,優質粉煤灰及偏高嶺土超細粉等4種超細礦物功能材料的組成、結構、粒度分佈、比表面積等基本性質;從理論上分析了礦物功能材料在混凝土中的4種效應,即火山灰效應、填充密實效應、微集料效應、表面吸附效應,並由此發揮出增塑、溫峰削減(降熱) ,增強及耐久性改善等作用;通過相關理論分析,推導出礦物功能材料的合理粒徑范圍在5 m 15 m ,即勃氏比表面積為4500cm ~ 2 g 7500cm ~ 2 g 。According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks
根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成土石方開挖15000萬立方米、混凝土澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。Columns under axial compression and biaxial bending. in the beginning of the paper, it summarized the history and the actuality of the nonlinear analysis of special - shaped columns and the capability of the sliding of reinforcement anchoring. on the basis of related papers, the full path of stress - strain relation of concrete and the sliding of longitudinal reinforcement anchoring are all considered
本論文主要內容是對鋼筋混凝土異形截面雙向壓彎柱(包括l形、 t形、十字形柱)進行非線形全過程分析,首先綜述了異形柱構件非線性分析以及粘結滑移性能研究的歷史與現狀,在有關文獻基礎上考慮了受拉縱筋和周圍混凝土的粘結滑移和混凝土應力?應變關系曲線的下降段。The content of the paper is nonlinear analysis of complete response process for t, l - shaped and " + " shaped section r. c. columns under axial compression and biaxial bending. on the basis of related papers, the full path of stress - strain relation of concrete and the sliding of longitudinal reinforcement anchoring are all considered, simultaneously, the restriction effect for concrete by thickening of stirrups is also included
本論文主要內容是對鋼筋混凝土異形截面雙向壓彎柱(包括l形、 t形、十字形柱)進行非線形全過程分析,在有關文獻基礎上考慮了受拉縱筋和周圍混凝土的錨固滑移和混凝土應力?應變關系曲線的下降段,同時考慮到在箍筋加密區箍筋對混凝土的約束影響。At present plenty of experimental study has been made on the materials and structural performance of asphalt concrete cores in the world, and the design methods and construction technique as well as equipments have been more mature. however, there is still lack of the research of its basic performance. in this thesis, in combination with the actual project, the experimental study has been employed with the field core specimen and the specimen made in laboratory, mainly include the static triaxial test, confinement pressure stabilization test and stress relaxation test
目前,國內外對瀝青混凝土心墻的材料和結構性能已進行了一些試驗研究,其設計方法、施工工藝和設備較為成熟,但其基本性能研究方面顯得較為薄弱,本文結合實際工程對瀝青混凝土心墻的芯樣和試驗室成型的試件進行了試驗研究,主要包括靜三軸試驗、圍壓穩定試驗以及應力鬆弛試驗研究,得到以下基本結論: 1Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。In the view of the concrete ' s micro construction, it can conclude that the boundary is the weakest. minute crack occurs firstly at the boundary, and then it spread toward the cements, which are produced by thermal stress
該模型是從混凝土組成的微細觀角度出發,簡化為水泥砂漿包圍骨料的平面問題,微裂紋首先在界面上產生然後向水泥砂漿中延伸。The concrete base is covered with earthen, blue, green and gray colored aluminum tiles while 59, 619 transparent and translucent tiles make up the facade the rest of the way up
在混凝土的第一外層覆蓋著土、藍、綠、灰色調的鋁片而第二外層則是由59 , 619片透明及半透明的玻璃所包圍。分享友人