混凝土槽 的英文怎麼說

中文拼音 [húnníngcáo]
混凝土槽 英文
concrete pit
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Finally, considering the request of the gfrp bars reinforced furan resin concrete electrobath, we designed the structure of the electrobath and use finite element method to analyse it. in the process, pre - stress also was considered. the result of use in practice indicate the properties of gfrp bars can meet the request of electrobath structure

    最後結合玻璃鋼筋呋喃樹脂電解的設計與開發,對電解的配筋布置、結構尺寸進行了設計,用有限元方法對電解的整體結構進行了計算分析,並考慮了玻璃鋼筋預應力的影響,其設計計算結果已在玻璃鋼筋呋喃樹脂電解的實際生產中得到了應用,且使用情況良好。
  2. Concrete kerb units - requirements and test methods - national addition to nf en 1340 : concrete industrial products - kerbstones and gutters - profiles

    路邊石.要求和試驗方法. nf en 1340的國家補充件:工業產品.路邊石和水.型材
  3. Application of prestress concrete at water conservency flume

    預應力在水工渡中的應用
  4. Each automatic weather station comprises two masts of about 5m and 10m high respectively and concrete plinths for setting up the masts, equipments and ductwork, with an area of about 10m x 10m

    每個自動氣象站面積約十米乘十米,設有兩支分別約五米高和十米高的桅桿和基座以裝設桅桿、設備和纜
  5. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱向抗震性能分析1 )湯峪河吊桿拱支承結構的縱向地震效應較小;吊桿式拱架結構動力特性取決于墩和主拱圈的剛度,以及結構的整體性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重心,在構件連接和變截面處增設梗脅,按照約束的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的應力集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  6. It indicates that the interfacial bonding of new to old concrete has good shearing property

    結果表明,溝式新老粘結面具有較好的抗剪性能。
  7. Class 1 - residential / light commercial snow melt : recommended for residential and light commercial walkways, driveways, entrances, and other light traffic ways, ramps and building entries

    冰雪融化系統實際上可安裝在任何地方,如停車場、車道、裝卸區、橋梁、人行道、戶外階梯、檐、屋面天溝、屋頂、下水管道,大約地表5厘米下的中。
  8. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩邊坡在開挖施工至斷層f5附近時,要使用栓塞、固結灌漿、錨索加固及排水等措施以防止巖體失穩。右岸拱肩邊坡開挖過程中要採取系統錨固及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  9. We specialize in producing such casting products as automobile parts, construction drainage, polymer concrete channel, livestock equipments

    公司生產汽車配件、農機配件、畜牧器械、機電配件、建築管件,民用鑄件等系列鑄造產品及樹脂排水
  10. For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc

    倉庫、碼頭裝卸區、機械工廠、飛機停機坪、車庫、停車場、油料庫、通道地面、工礦溜、橋面、水庫溢洪道、交通池、裝卸斜坡、軍工企業、紡織業、冷凍庫房、汽車工業、電子工業、高速公路等適合金屬骨料要求的地面。
  11. In this method, spaces for plant growth are separated from the anchoring bar and shotcrete structures, but they have some mutual relations in following two points : firstly, establishments for plant growth can be fixed by using anchoring bars and shotcrete ; and secondly, water for plant growth can be partly supplied by drainage holes arranged in anchoring bar and shotcrete structures

    在該方法中,供植物生長的空間(包括綠化、綠化盆等)與錨噴結構是相互分離的,但在以下兩方面又有所聯系:第一,藉助于錨桿和噴射來固定栽種植物所需的設施;第二,通過布置在錨噴結構上的排水孔為植物供水。
  12. Precast concrete flags, kerbs, channels, edgings and quadrants - precast, unreinforced concrete paving flags and complementary fittings - requirements and test methods

    預制鋪路板路緣石溝鑲邊件和扇形板.預制,非加筋鋪路板和相應配件.要求和試驗方法
  13. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  14. Thaw settlement cause negative friction. this paper base on the thought of " initiative cooling ", aim at three problems existing in common concrete pile used in frozen soil, a new type of pile is proposed to overcome the disadvantages of the classical pile used in frozen soil. pile body within active layer is fluted and refilled with porous materials such as gravels and ballasts, convection will be occur and then thermal exchange inside porous material in winter while only heat conduction exists in summer, as a result the soil around flutings will be cooled, so the top line of permafrost will be drive up

    本文基於「主動冷卻」地基的思想,以及針對凍地區普通樁存在的三大問題,提出了一種新型樁的設計思路,運用數值模擬試驗手段對其冷卻機理與加固機理進行了系統研究,即在凍融活動層的深度范圍內,在樁身的表面刻,修築完時內填充碎石、塊石等多孔介質,通過外界大氣溫度的自然波動下多孔介質在冬季時存在的對流換熱機制,而在夏季只存在熱傳導,來達到主動冷卻樁周凍和抬升凍上限的目的。
  15. In china hydropower station, slrcp is firstly used in dongjiang. later, this type of penstock is used in jinshuitan, jinjiang, taolinkou, wuqiangxi, lijiaxia, jinghong, and also in the largest hydropower station : three - gorge hydropower station

    此後,在緊水灘、錦江、桃林口、五強溪、李家峽、景洪水電站工程中陸續推廣使用,舉世矚目的三峽水電站採用的就是「淺式鋼襯鋼筋壩後背管」 。
  16. On the basis of brief introduction of danjiangkou dam extension project which is in the middle route water resources project of the south - to - north water diversion, the present construction methods and existing problems about key technology of increased artificial concrete keyway of jointing surface between new concrete and existing concrete are analyzed, and a new construction method by saw - cutting and static crack for construction of concrete keyway is researched

    摘要在簡要介紹南水北調中線水源工程丹江口大壩加高工程概況的基礎上,針對大壩加高中新老結合面新增人工鍵施工的關鍵技術,分析了現有施工方法及存在問題,研究並提出了新的鋸割靜裂法施工法。
  17. Roofs must be given sufficient fall to drain water off quickly and adequate gutters formed in the concrete to discharge the water in heavy storm

    屋頂必須有足夠的坡度,以利迅速排水,同時屋面板必須有足夠的雨水,以利暴雨時排水。
  18. The different drawbacks in the original design and construction of the emergency gate slot of the releasing tunnel of zhelin hydropower station in jiangxi province resulted in the disjunction of most slot corner plates under the parapet walls of two sides of the left hole and the damage of the second - phrase concrete in these slot corner plates, after the gate is closed and under the action of seepage water pressure

    江西省柘林水電站泄空洞檢修門,由於原設計和施工均存在不同的缺陷,致使閘門關閉后,在滲透水壓作用下,造成左孔兩側胸墻以下大部分門護角板被擠壓脫開,護角板裏面的二期損壞。
  19. The failure models of the pile foundation of the girder flume in the li river are analyzed, the corresponding functional functions are established, and the reliability index of a single concrete pile is calculated

    摘要分析了澧河段梁式渡樁基礎的破壞模式,建立了相應的功能函數,計算得出單樁的可靠指標。
  20. 1. the topographies of cutting grooves and cutting chips were observed by means of scanning electronic microscope, and sawing mechanism of concrete was analyzed, based on the properties and fracture mechanics of concrete. 2

    採用掃描電鏡( sem )和體視顯微鏡觀察單顆粒金剛石切削表面形貌和切屑形態,並結合的特性及斷裂力學性能,分析研究了材料的切削加工機理。
分享友人