混凝土水箱 的英文怎麼說

中文拼音 [húnníngshuǐxiāng]
混凝土水箱 英文
concrete tank
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  • 水箱 : water box; lavabo; water block; water tank
  1. Wire - wound, circular prestressed concrete water tanks

    線繞式環形預應力混凝土水箱
  2. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers

    涵洞雨管和污管道用預制鋼筋形斷面的標準規范
  3. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric

    涵洞雨管和污管道用預制鋼筋形斷面的標準規范
  4. A valve box, a valve pillar and a water meter basin shall be of cast iron, synthetic resin, and concrete, etc

    閥門,閥門柱和表井應由鑄鐵,合成樹脂和等構成。
  5. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    梁製造由鋼筋工程、模板工程、工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化配合比,灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防層和保護層施工的一些規定和注意事項等都是對梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  6. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際工程,詳細分析了鋼圍堰的構造、錨錠系統的布設、錨纜的計算、鋼圍堰的製作及組拼、鋼圍堰的接高與下沉、封底等圍堰施工的重要內容;並對常用的鋼套施工技術進行了討論。
  7. Standard specification for mixing rooms, moist cabinets, moist rooms, and water storage tanks used in the testing of hydraulic cements and concretes

    泥和試驗用攪拌室濕氣濕氣室和貯存罐標準規范
  8. Temperature field analysis of heat of hydration in concrete box girder

    形梁化熱溫度場分析
  9. Concrete construction temperature control for water discharge culvert of tgp ' s shiplock in summer season

    三峽船閘泄涵夏季施工溫度控制
  10. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊圍堰的全結構模型,相對準確地模擬灌注封底后、抽除吊內河后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊全結構體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  11. Standard specification for steel wire, hard drawn for prestressing concrete tanks

    預應力混凝土水箱用冷拉鋼絲的標準規范
  12. Standard for circular prestressed concrete water tanks with circumferential tendons

    帶有環形預應力鋼筋的環形預應力混凝土水箱標準
  13. Then they made a concrete box to collect the water that bubbled forth, and built concrete pillars to support the pipes over the first, and deepest, ravine

    然後他們做一個來盛接向上冒出的泉,並且建造柱來支撐管,讓它們橫跨第一道、也是最深的一道深谷。
  14. Humidity control in cement concrete standard curing box and standard curing room

    標準養護和標準養護室中的濕度控制
分享友人