混凝土溢流壩 的英文怎麼說

中文拼音 [húnníngliú]
混凝土溢流壩 英文
concrete overflow dam
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  • 溢流 : effluent flow
  1. Based on the relocating mesh model, according to heat conduction theory, elastic creep theory and finite element theory, simulation program for roller compacted concrete overflow dam is worked out through 3 - d finite element method

    基於本文提出的計算模型,根據熱傳導理論、彈性徐變理論及有限元理論,作者編制了碾壓混凝土溢流壩溫度場及溫度應力場的三維有限元模擬計算程序。
  2. In this paper the temperature field and thermal - creep - stress field in roller compacted concrete overflow dam during construction and operation are simulated and the distribution law of them are systematically studied by an example

    本文通過一典型算例對碾壓混凝土溢流壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了碾壓混凝土溢流壩施工期和運行期溫度場、溫度徐變應力場的分佈規律。
  3. This paper does simulation analysis on temperature field of baise rcc gravity dam with the software ansys based on the theory of transient temperature field

    摘要根據瞬態熱傳導三維有限元分析基本理論,利用大型有限元軟體ansys對百色碾壓重力段一枯二枯施工期的溫度場進行了實時模擬分析。
  4. In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model

    在結構措施方面,針對嚴寒地區高碾壓重力體越冬層面的上、下游面附近及堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過容許拉應力,開裂難以避免,進而提出設置碾壓表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和體沿預留縫的穩定性,以避免大在無措施部位開裂,解決大越冬層面水平施工縫的開裂問題。
  5. 5. based on longtan project, temperature control and crack prevention of a typical overflow section block of the high rcc gravity dam is studied as a case study

    以「十?五」國家電力公司科技攻關項目為背景,深入系統地進行了龍灘高碾壓重力典型段的溫控防裂研究。
  6. The surface cracks of concrete dam in the fengman projects were surveyed and detected with non - damage detection methods in the fields. the pouring process of the concrete was simulated with finite element method, and then the stress distribution in the dam was computed

    對豐滿大段新澆裂縫進行了現場調查、無損性態檢測;採用有限元法模擬澆築過程中內的應力分佈。
  7. This paper mainly calculates the temperature field and thermal stress during construction and operation of rcc, what " s more, studies the distribution regulation of temperature field and temperature stress field of baise roller compacted concrete ( rcc ) overflow dam in guanxi province using three - dimension finite element floating mesh method

    本論文用三維有限元浮動網格法對碾壓段施工期和運行期溫度場和溫度應力進行了模擬計算,研究了廣西右江百色水利樞紐碾壓段施工期及運行期溫度場和溫度應力場分佈規律。
分享友人