混凝土澆注機 的英文怎麼說

中文拼音 [húnníngjiāozhù]
混凝土澆注機 英文
concrete placer
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 澆名詞(姓氏) a surname
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : machineengine
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類木工程、市政工程、海事工程的設計、施工、械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成石方開挖15000萬立方米、1500萬立方米、發電組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。
  3. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、座與底板整體、採用先進計算理論指導配筋。
  4. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,介紹了沉井施工過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和鋼筋綁扎,;沉井下沉控制中的刃腳內模沙,抽沙泵抽沙下沉,高壓水槍破壓、空壓吹壓下沉等。
  5. Used to concrete seam and arbitrarily shape seam in component. in the condition of the expanding being favorable limited, attain satisfied stop - water effect and manage the concrete interstitial leaking. at the same time, it can be also used to shipping and engine etcindustrial equipment

    適用於現場施工縫和嵌入構件任意形狀的接縫內,在其膨脹受到良好限制的條件下達到滿意的止水效果,治理裂縫的漏水,同時也用於船舶、車等工業設備的防水密封。
  6. Therefore, it is necessary to get temperature mode and its effect on the stress and the line deformation in one region of our country by theories and experiments. it can be used in the bridge design, which makes a reasonable time to construct, sprinkle concrete and control appropriate temperature on key constructing processes

    因此,有必要通過實驗和理論等研究工作,得到合適於我國或某一地區的大跨度pc連續梁橋的溫度場分佈規律及其溫度效應,可以用於指導設計,確定施工立模及的合理時,對關鍵的施工工序進行適當的溫度控制。
  7. According to the tendency of modern concrete pump deliever with far - distance and high - floor pouring, the market need a measure system provided with good automatic performance and friendly human - machine interface

    現代泵送技術向遠距離傳輸、高層發展,並日益走向市場化,對測量系統的要求越來越高,不但要求它具備較高的自動化程度及良好的測量性能,還要求友善的人交互界面。
分享友人