混凝土碼頭 的英文怎麼說

中文拼音 [húnníngtóu]
混凝土碼頭 英文
concrete quay
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ名詞(表示數目的符號或用具) a sign or object indicating number; code Ⅱ量詞1 (指一件事或一類的...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  • 碼頭 : 1 (停船的地方) wharf; dock; hoverport; pier; shipside; jetty; quay 2 [方言] (商業城市) port c...
  1. Widely employed in coal mine, downhole coal bunker, coal washery, cement factory, foundary, thermal power plant, sintering plant coal gas factory, fertilizer plant, chemicals plant, aluminium plant, alkali factory, steel works, coking plant, pharmaceutical factory, mine, dock, foodstuff, and feedings process works, concrete process, etc. with bunker, hopper, transmitting pipeline and drawshaft

    廣泛用於煤礦、及井下煤倉、洗煤廠、水泥廠、鑄造廠、火力發電廠、燒結廠、煤氣廠、化肥廠、化工廠、鋁廠、制堿廠、鋼鐵廠、焦化廠、制藥廠、礦山、、糧食、飼料加工廠、加工廠等擁有料倉、料斗、輸送管道和礦山溜井的廠礦企業。
  2. The sub - tropical climate lures office workers to sun themselves in the early evening on the golden chain of pacific beaches ; million - dollar yachts chase rust - stained dinghies between the cream - and - green ferries on the harbour ; ships like concrete blocks glide under the harbour bridge to the container wharves, past tourists beaming over the gunwales of replica 18th century sailing vessels

    亞熱帶氣候吸引著白領階層在傍晚時分的太平洋黃金海岸邊享受陽光;港口裡白綠相間的船隻之間,價值百萬的遊艇追逐著斑駁生銹的小劃艇;堅固如大樓的船隻穿過港口大橋,駛入集裝箱,遊客站在仿18世紀的海船船舷上微笑著。
  3. For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc

    倉庫、裝卸區、機械工廠、飛機停機坪、車庫、停車場、油料庫、通道地面、工礦溜槽、橋面、水庫溢洪道、交通池、裝卸斜坡、軍工企業、紡織業、冷凍庫房、汽車工業、電子工業、高速公路等適合金屬骨料要求的地面。
  4. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能成套技術研究」 ; 4 .水利部「水工抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能技術、上海寶鋼礦石鋼筋防腐蝕技術、江陰長江大橋大體積粉煤灰技術、南京長江二橋泵送技術等提供咨詢建議。
  5. For floors where abrasion and impact resistance as well as dust - proof are required such as for warehouse, pier, workshop, park, factory, garage, station, etc

    用於須耐磨沖擊且減少灰塵並適合非金屬骨料要求的地面,例如:倉庫、、廠房、停車場、維修車間、車庫、貸倉式商場等地面。
  6. This ship is a non - propelled fixed luffing 500t steel crane vessel. this vessel is mainly used to lift and hookup the concrete components, bridge blocks, mechanical electrical equipments for harbours, bays, quays and jetty

    建港304為非自航固定變幅式500噸鋼質起重船,主要用於中國南海沿海各港灣港口及內河和堤岸的構件橋梁機電設備等吊裝工程。
  7. Cathodic protection to reinforcement in pier structure

    -陰極防蝕系統保護內的鋼筋
  8. Monolithic type wharf

    整體鑄造
  9. Solid concrete pier

    實體混凝土碼頭
  10. It is concluded that we can take measures to reduce shrinkage of concrete during casting of beam in wharf construction

    在現澆上橫梁時可採取措施,減小收縮。
  11. However, there was a complaint in 1992 against gic for breaching the lease condition with the operation of a concrete batching plant at kpp no. 90. lands department issued warning letters to the grantee in the same year requesting compliance with the lease conditions

    雖然如此,青洲英坭在一九九二年曾被投訴利用九龍永久第9 0號用地經營配料廠,違反了批約條件。
  12. Large diameter prestressed concrete tubular pile is one of the new type of pile foundation structure developed in the period of sixth five - years plan, the category and specifications of this kind of concrete tubular pile improved continually from the only one al type to a, b, c three category including seven types with the development of harbor industry, and applied in more than forty large scale harbor and bridge projects. the advantages of this product such as better structure performance, lower investment and higher construction speed were fully embodied in such projects

    大直徑預應力管樁是我國從「六五」期間開始的新的樁基結構形式,隨著港口事業的發展,大直徑預應力管樁的品種與規格不斷得到拓展,從原來的單一的a1型樁發展到a 、 b 、 c三類7種規格的系列產品,在全國四十多座大型和橋梁工程中得到應用,充分體現了大管樁這一產品結構性能好,投資省,速度快的優勢。
  13. A new type composite quay - wall panels of steel and concrete with profiled steel used as the stiffeners were proposed to meet special requirements

    摘要基於特殊需要,提出了帶型鋼加勁肋的鋼板組合板這一新型組合面板。
  14. Based on the analysis of the causes for concrete cracking on surface of port works, corresponding measures were taken during surface concrete construction to prevent the occurrence of cracks

    摘要通過對工程面層「龜裂」成因的分析,在面層施工中採取配套措施,以減少「龜裂」的產生。
  15. Through check and inspection to the large pipe piles of zhejiang beilun power plant ' s pier, a lot of cracks were found in portrait and circle on the surface of prestressed concrete pipe piles which affect security and durability of the concrete structures directly

    摘要通過對北侖電廠大管樁的詳細調查與檢測,發現大管樁多處存在縱向裂縫和周向裂縫,直接影響結構的安全性、耐久性。
  16. In november 2000, the lands department received a complaint again from a member of the public against the concrete batching plant at kpp no. 90. the major issues of the complaint were about the dust and noise nuisances caused during the process of concrete production

    在二年十一月,地政總署再次接到市民就第9 0號被用作配料廠的投訴,投訴內容主要涉及製造過程中所產生的塵埃和發出的噪音。
  17. The integrated application of strengthening and anti - corrosive construction technologies for reinforced concrete during maintenance of piled beam - slab wharf is introduced in combination with the engineering practice

    摘要通過工程實踐介紹了高樁梁板式維修中鋼筋加固和防腐施工工藝的綜合應用。
  18. This paper describes the research results of the durability of the high performance concrete and the application of the hpc in lianyun sea port project

    本文介紹高性能的耐久性研究結果及其在連雲港工程中的應用情況。