混凝土面板壩 的英文怎麼說

中文拼音 [húnníngmiànbǎn]
混凝土面板壩 英文
concrete face dam
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  • 面板 : [機械工程] face plate; panel; panel board; frontpanel; face ply [veneer]; surface veneer; skin pl...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對堆石的導流渡汛標準、導流方式及其選擇、施工期渡汛及體填築分期、圍堰設計以及施工方案及總進度等與堆石特點有關的問題進行研究,為工程建設提供一定的參考。
  2. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    堆石上游坡傳統的墊層料超填、削坡、斜坡碾壓的施工方法存在許多弊端。
  3. Cfrd monitoring and its behavior analysis

    堆石監測及性態分析
  4. Based on the design of hanpingzui rockfill dam with concrete facing slab, the stresses and deformations of the dam body and impervious system are calculated by using the elastoplastic plane finite element method

    摘要根據漢坪咀堆石的工程設計,用彈塑性平有限元法,計算了堆石體、防滲體系的應力和變形。
  5. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在的抗凍耐久性、墊層材料防滲和凍脹特性、體填築與季節的適應性、導流和度汛與總體進度的協調等方,寒冷地區堆石均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型堆石的成功記錄,解決了一系列國內外均無先例的難題。
  6. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大為目前在建的河床趾建在深厚覆蓋層上國內首座百米級的堆石
  7. Combined with a concrete face rock - fill dam in process, the simulation analysis on the face slab ' s temperature field and temperature stress is processed in connection with the condition of temperature sudden drop caused by daytime temperature differences and cold wave and so on during the construction period

    摘要結合某在建的堆石,針對施工期日溫差及發生寒潮等氣溫驟降情況,進行了氣溫驟降條件下溫度場及溫度應力的全過程模擬分析。
  8. Technical specifications for joint seal of concrete face rockfill dam

    接縫止水.技術規范
  9. By careful analysis, we determined to adopt the treatment by grouting and laying on sr sealant, which was done in 2006

    在2005年檢查時發現大出現了若干裂縫,經過認真分析,確定採用灌漿和sr止水材料的處理措施,於2006年進行了處理。
  10. Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam

    水布埡堆石填築料開采爆破試驗
  11. Design speifications for concrete face rockfill dams

    堆石設計規范
  12. Specifications for concrete face rockfill dam construction

    堆石施工規范
  13. Construction specification for concrete faced rockfill dams

    堆石施工規范
  14. The stress - deformation behavior of diaphragm walls of concrete face rockfill dam built on thick alluvium deposit was analyzed using the numerical analysis method

    摘要採用數值分析方法對深覆蓋層上堆石的防滲墻應力變形性狀進行了研究。
  15. The application of moving sidewall crushing technology promotes the development of cushion material construction technology of concrete facing rockfill dam

    移動邊墻擠壓技術的應用對于堆石墊層料施工技術的發展起到了推動作用。
  16. Design code for concrete face rockfill dams

    堆石設計規范
  17. Study on rock - fill dams with concrete face in cold conditions and its application

    嚴寒地區堆石施工技術的研究與應用
  18. Concrete face rockfill dam ( cfrd ) is a new type of dam with very developing future

    堆石是極有發展前途的一種新型。
  19. Transient seepage analyses for gouhou concrete faced rockfill dam were conducted using the unsaturated soil seepage theory

    摘要利用非飽和滲流理論,對溝后砂礫石進行瞬態滲流數值模擬。
  20. At mean time, it is very important to study and adopt new dam construction techniques in the world, such as to focus on the wide application of the rock - fill concrete deck and rolled asphalt concrete core dams

    同時,學習和引進國外工新技術,如重點推廣應用的堆石和碾壓式瀝青心墻等新型。
分享友人