混懸質 的英文怎麼說

中文拼音 [húnxuánzhí]
混懸質 英文
suspensoid
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  1. The company has the advanced production equipment and the quality check - out facility, the dosage - form which the preparation medicine may produce has tablet ( contraceptive medicine, hormone tidy ), capsule, drop pill medicinal preparation, powder, oral solution, tincture, lotion, eye ointment preparation ( hormone tidy ), eye ophthalmic gel, soft medicinal extract, cream preparation, cataplasm, suspension and so on, totaling 15 kinds

    公司擁有先進的生產設備和量檢測設備,制劑藥可生產的劑型有片劑(避孕藥、激素類) 、膠囊劑、滴丸劑、散劑、口服溶液劑、酊劑、洗劑、眼膏劑(激素類) 、眼用凝膠、軟膏劑、乳膏劑、糊劑及劑等15種。
  2. Suspended solids including fine particles and colloids cannot be removed efficiently with gravitation sedimentation ; they are removed using centrifuge, dissolved air flotation, diatomaceous earth filtration, coagulation sedimentation plus rapid sand filtration while dissolved solids are removed with ion exchange, ultrafiltration, activated carbon adsorption and chemical oxidation

    浮固體之去除包括微顆粒及膠體物,無法以重力沉澱之物,可採用離心分離機、空氣浮除法、矽藻土過濾法、凝沉澱加快濾池等去除之。而溶解性固體去除則採用離子交換法、微細孔濾膜過濾、活性碳吸附以及化學氧化等去除之。
  3. Several semi - active control algorithms used in the semi - active suspension system with mr dampers are proposed and developed including the " on - off " voltage controller, the continuously linear variable voltage controller, the modulated continuously linear variable voltage controller based on " sky - hook " damping concept and the hybrid controller based on the combination of " sky - hook " damping concept and " ground - hook " damping concept and the fuzzy logic controllers using measurements of the relative displacement between the sprung and unsprung mass or the absolute acceleration of the sprung mass as the input variables of fuzzy logic controllers. the simulation models were prepared in matlab ? simulink ? fuzzy toolbox programs. the experiment setup of the semi - active suspension system with mr dampers in the lab has been designed and developed

    根據磁流變阻尼器特性和對架系統動力學特性的規律性研究,為磁流變阻尼器設計了基於「天棚」阻尼控制概念的「 on - off 」 、線性連續和修正的線性連續控制策略,基於「地棚」阻尼控制概念的磁流變阻尼線性連續控制策略, 「天棚」阻尼和「地棚」阻尼控制概念線性組合起來的磁流變阻尼合控制策略,根據模糊控制原理設計了以簧載量和非簧載量間相對位移或簧載量加速度分別作為輸入變量的模糊邏輯控制器用於磁流變阻尼半主動架的智能控制。
  4. In view of existing situation, author of the paper investigates the problems lie in building quality and choose concrete cantilever with a damage as typical example which is detected by damage indices through digital simulation

    本文針對建築結構量檢測的現狀,認真調查了建築量中存在的問題,選取凝土臂梁作為典型構件,利用現有的損傷信息特徵量對結構損傷診斷進行了計算機模擬。
  5. Concrete pylons are adopted for the fengdu yangtze suspension bridge, and normal construction methods for the pylons include slide formworks, turning shutters and climbing formworks. climbing formworks with assembled steel - pipe scaffolding is a newly - developed technique for this bridge. it causes saving of the steel skeleton for construction of the pylons. by utilizing regular simple rods and parts, construction progress is fast and the quality is good

    豐都長江大橋索橋採用凝土橋塔,其常規的施工方法有滑模、翻模和爬模等幾種,本橋施工中採用了新開發的鋼管爬升架倒模新工藝,不僅節省了為橋塔施工而設計的橋塔型鋼骨架,而且利用常規的簡易桿件、施工速度快,施工量好。
  6. Abstract : the paper introduces advantages of cantilever assembly of long - span pc continuous beam. exploration is made on line control, shear key design, matching face treatment and grouting quality requirements, etc

    文摘:結合工程實際介紹大跨度預應力凝土連續梁拼施工的優點,對線形控制、剪力腱的設計、匹配面處理、壓漿量要求等問題進行了探討。
  7. Losses of sediment to suspension during dredging for the mainland landing point would only exceed the water quality objectives inside a small ( 1km ) mixing zone and the dredging would have no unacceptable adverse impacts remote from the dredging site

    在內地的著陸點進行挖泥工程,將導致該處的沉澱物浮水中,但只會令范圍細小( 1公里)的合區超出水指標。
  8. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人