混碾機 的英文怎麼說

中文拼音 [húnniǎn]
混碾機 英文
kollergang
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : Ⅰ名詞(碾子) roller Ⅱ動詞1 (用碾子等使穀物去皮、破碎) grind or husk with a roller 2 (碾碎) c...
  • : machineengine
  1. Schneiderite, for instance, consisting of a mixture of ammonium nitrate and dinitronaphthalene, is mixed in an edge runner in batches of 60kg.

    例如,由硝酸銨和二硝基組成的合炸藥施奈德萊特,便是以每批60公斤在輪合的。
  2. The two constituents were compatibilized in - situ by mechanochemical reactions induced by pan - milling and the microstructure of the blend can be controlled conveniently by adjusting processing conditions. polyamide 6 / ground limestone powder ( pa6 / caco3 ) and polyamide 6 / silicon dioxide ( pa6 / sio2 ) composites were also prepared through this method. those pa6 blends and composites exhibit improved microstructure and superior mechanical properties to the systems mixed by conventional mixing methods

    研究了磨盤磨對尼龍6的粉碎理,制備了就地增容、微相結構可調的聚丙烯/尼龍6 ( pp / pa6 )及尼龍6 /碳酸鈣( pa6 / caco _ 3 ) 、尼龍6 /納米級二氧化硅( pa6 / nano - sio _ 2 )共復合材料,各體系合效果、微相結構及力學性能均明顯優于採用傳統合設備制備的試樣。
  3. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了凝土集裝箱堆場施工工藝與質量控制,工程採用振動梁和振動棒相結合的小型械法施工,通過對關鍵工序如:施工測量、場區基層壓、二灰層施工、鋼筋施工、模板施工、凝土面層的施工工藝與質量控制,表明小型械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  4. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能凝土成套技術研究」 ; 4 .水利部「水工凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際場地下室修漏與裂縫補提出技術方案被采納並實施,為場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能凝土技術、上海寶鋼礦石碼頭鋼筋凝土防腐蝕技術、江陰長江大橋大體積粉煤灰凝土技術、南京長江二橋泵送凝土技術等提供咨詢建議。
  5. The damming technique is relatively perfect now, but because of the problems in construction management are more and more severe, such as construction scheme and matching machine, which manifest the high construction expenses

    雖然凝土築壩技術已達到較成熟的地步,但是由於採用不同施工組織方案和械配套方面存在的施工管理問題越來越突出,這集中反映了凝土壩施工費用的巨大浪費。
  6. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,凝土壩的規模和高度正在日益擴大, 300m級的凝土重力壩和200m級的凝土拱壩的研究正方興未艾,對凝土築壩技術、施工工藝和械化程度的要求也更高。
  7. Structure design for the mixing drug transmission system of mill line

    藥傳動系統的結構設計
  8. So there is great significance in reality to minimize the expenses by studying the relationship among the scheme, machine matching and the cost optimization in construction

    因此,針對如何加強凝土壩施工方案、械配套和費用優化問題等展開研究,使其施工費用最低,必將具有重大的現實意義。
  9. S13 wheel scraper rotor sand mixing machine

    S13輪轉子式
  10. S11 wheel scraper sand mixing machine

    S11輪式
  11. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石壩建設中,借鑒道路園林工程中道沿的擠壓滑模原理,創造性使用邊墻施工法,在每填築一層墊層料之前,用擠壓式邊墻製作出一個半透水凝土小墻,然後在其內側按設計鋪填壩料,用振動平面壓,合格后重復以上工序。
  12. In this paper, applying the theory and method of system engineering and administer accountant, combining the huatan project, the optimization among the construction scheme matching machine and expenses were studied thoroughly. through the simulation and optimization in construction process, mixing and transport subsystems of huatan dam, and analyzing the influence factors of damming capability, establishing the correspond systems analysis software of dlp model

    本文應用系統工程、管理會計的理論和方法,並結合花灘凝土大壩工程實踐,系統而深入地研究了築壩的施工方案、械配套和費用優化,對花灘凝土壩施工過程、拌和運輸子系統的模擬和優化,分析了凝土澆築能力的影響因素,建立了dlp模型相應的系統分析軟體。
  13. The pilot study of causes of cracks in puding rcc arch dam

    凝土拱壩分縫形式及破壞理研究
  14. Pan of the mill

    混碾機
  15. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、凝土出口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  16. The process and mechanisms of slipping, exfoliation to layered graphite and compounding with polypropylene ( pp ) on nano - scale were systemically studied. the effects of shearing force field offered by pan - milling and confined environment of the exfoliated graphite on the microstructure of polypropylene, the electrical and thermal conductivities of the nanocomposites were also investigated. based on the experimental results, a modified electrical conductive model as well as thermal conductive model for polymer - based composites was proposed

    利用層狀無物(如石墨)的弱層間結構和聚合物的粘彈性特點,在磨盤磨剪切力場作用下,通過摩擦和拉伸形變錯位、擠壓嵌合、拉伸滑移、剪切剝離與粉碎和合分散等過程,實現層狀無物層間剝離和與聚合物的納米復合。
  17. After the investigation and study of this extruded concrete curb solution overseas, shaanxi provincial bureau of water & electric engineering ( group ) co., ltd. ( spb ) devoted to the research of this new construction method, invented bjy - 40 extrusion curb placing machine, made comprehensive experiments on heihe dam site, and got valuable results, adopted this method in gongboxia hpp main dam construction

    在對國外邊墻施工法進行細致調研后,從2001年開始,陜工局率先對這一技術進行研究,研製了bjy - 40型邊墻擠壓,在黑河工地進行了現場擠壓凝土邊墻和墊層料鋪填壓的綜合試驗,取得了具有參考價值的第一手資料,並在公伯峽水電站面板壩工程中創新採用了這一技術。
分享友人