測深斷面 的英文怎麼說

中文拼音 [shēnduànmiàn]
測深斷面 英文
sounding profile
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 斷面 : section; fracture surface; plane of fracture
  1. It is proved that the electric conductivity of ore - forming solution can be used to seek for ore - forming fractures, to select the best mineralization section, to distinguish industrial and non - industrial auriferous quartz veins, to reflect the rich or poor levels of orebodies, to evaluate the stability of orebodies, to judge the denuding levels of ore veins, and to prospect the mineralization in depth

    實踐證明,該方法在以下幾個方具有應用前景: ( 1 )查找成礦裂,優選最佳成礦區段; ( 2 )區分有無工業價值的含金石英脈; ( 3 )反映礦段或礦體的貧富程度; ( 4 )評定礦體的穩定性或礦化不均勻性; ( 5 )評估礦脈的剝蝕程度; ( 6 )礦脈部成礦預
  2. With the reform of the economical system developing, improvement of the capacity and people ' s living standard, our country is also facing a series of new situations and new problems. at the same time, our party has lead all people in our country to create the new conjuncture that is chinese characterical socialism and has acquired a great accomplishment. it has proved that our party ' s organization and the party member are good on the whole. it is capable, but there are some problems that can not be ignored, something that are depressed even deteriorated, have come i nto being and affected the party member ' s ideals. they corrode the party member, affect the party ' s cohesion, flie organization, the party ' s battle strength and the relation between the party and the people

    當今世界國際風雲變幻莫,世界多極化趨勢繼續發展,經濟全球化進程與科學技術發展不加快,而舊的不平等的國際政治經濟秩序並沒有根本改變,霸權主義與強權政治依舊盛行,西方對我國的和平演變戰略一刻也沒有停止,而隨著經濟體制改革的入發展,在生產力和人民生活水平不提高的同時,國內也臨著一系列新情況新問題;與此同時,在社會主義市場經濟大潮中,我們黨帶領全國各族人民開創了建設有中國特色的社會主義的新局,取得了世人矚目的偉大成就,事實證明我們黨的組織和黨員幹部總體上是好的,是有戰鬥力的,但是,黨內也產生了一些不容忽視的問題,一些消極的甚至是腐朽的東西逐漸滋生起來,從思想上、組織上和作風上侵蝕著黨員、幹部隊伍,影響著黨的凝聚力、戰鬥力的增強和黨同人民群眾的關系。
  3. First, according to measured data and literature, the river channel evolution rule and its reasons in the southern branch of the yangtze river are discussed from the perspectives of historic evolution, recent evolution and the tendency prediction of river channel evolution. besides, the local reservoir has been studied from the changes in thalweg and section as well as the calculation of local erosion and deposit. consequently, the stability and feasibility of reservoir construction in the river section are approved

    首先根據大量實資料及文獻資料,就歷史變遷、近期演變、河演趨勢預等方,初步探討了長江口南支河段河道演變規律及原因,並具體就泓線的變化、主槽變化、局部沖淤計算等方對擬建水庫局部區域進行了分析,論證了工程河段建設水庫的穩定性及可行性。
  4. The method for measuring the plane strain fracture toughness klc has been introduce to high polymer bonded explosives ( pbx ) by systematically studying technologies concerning the shape of specimen, the depth and its machining of crack, the loading rate, the measurement of critical fracture load, and the computation of klc, etc. the method has been used to test and study klc of three typical high polymer bonded explosives which are j2, jl, j3 respectively both at normal temperature and unmoral temperature

    本文以高聚物粘結炸藥為研究對象,對試高聚物粘結炸藥的平應變裂韌度所涉及的樣品形狀、裂紋度及裂紋制備、加載速度、臨界裂載荷p _ q的確定及平應變裂韌度k _ ( ic )的計算等方進行入研究,建立了較為完善的炸藥平應變裂韌度試方法。
  5. It analyse the stability with numerical simulation. finally, on the basis of geological estimation and analysis of the monitoring data and the numerical simulation, it conclude : ( 1 ) through the tracking investigation of the deformation phenomenon, and the study of the rock mass constructure of the slop, it determine the mode of the formation and destruction on the basis of aggregate analysis of the monitoring data

    最後,結合地質判、監分析結果及數值模擬分析結果以及對典型剖的極限平衡計算結果,得出了以下主要成果: ( 1 )通過對「左砂」邊坡變形破壞跡象的跟蹤調研,對斜坡的巖體結構和已經發生的破壞跡象進行入的研究分析,結合對監資料的綜合分析,確定了「左砂」邊坡可能的變形破壞模式。
  6. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預預報( 3 )在現場地應力試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖的地應力分佈規律:地應力量級在最大埋附近達到最大值24mpa ,並預k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與層破碎帶及千枚巖相聯系。
  7. Therefore, under the certain condition of the profile of open channel, the size of long and narrow plate and installation, the flux can be achieved from the equal flux curve if the opening angle of the plate and water depth in front of the plate are accurately determined

    在確定渠、細長板尺寸以及安裝布置條件下,只要準確得細長板開啟角與板前水,便可利用等流量線圖得知此時的流量。
  8. We research the causes of concrete cracking, develop the high performance anti - cracking additive, optimize the concrete mix and construction techniques, increase the stability of concrete volume by shrinkage compensation, enhance splitting tensile strength, and can meet demand of high workability of fresh concrete. in the study, a thorough investigation of this problem is made from all points of view, with the aid of various modern measurement & testing technology and different theories & methods in surface physical chemistry, structural chemistry, solid - state chemistry, composite materials, fracture mechanics, etc. our research results have shown that the various shrinkage of concrete cause concrete cracking in building engineering, such as autogenous shrinkage, dry shrinkage, temperature shrinkage, plastic shrinkage, carbonized shrinkage, etc

    目前,解決混凝土開裂的方法是綜合的,我們調查研究了混凝土開裂的原因,開發研製了高性能抗裂外加劑,優化混凝土的設計和施工方法,並通過補償收縮達到混凝土體積穩定,提高抗裂強度,滿足混凝土拌和物高工作性能的要求。本研究採用多種試技術,應用表物理化學、結構化學、固體化學、復合材料學、裂力學等多學科的理論與方法,從不同的角度進行入的研究和探討。通過調查研究建築工程中出現的混凝土開裂、滲漏問題,發現混凝土在非荷載作用下開裂主要是由混凝土的自收縮、乾燥收縮、溫度收縮、塑性收縮、碳化收縮等各種收縮變形引起的。
  9. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施工對策研究和重慶輕軌大坪大車站鄰近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模型試驗、現場試驗證等。
  10. The synthetic experimentation of testing and calculating design depth in conveyance canal combine the knowledge of irrigation and drainage engineering and hydraulics. during the experimentation, through experiment data testing, analysis, calculating and watching canal model, making students understand further the principle of design, which has mutual promoting effect on theory teaching in class

    輸水渠道橫設計水試及計算實驗結合「灌溉排水工程學」及「水力學」等學科的知識,在實驗過程中,通過對實驗數據的試、分析及計算和渠道模型實物的觀摩,加了對渠道設計原理的理解,與課堂上的理論教學起到了良好的互動作用。
  11. Study of ground subsidence prediction model for full section and deep mining

    大采地表沉陷預模型研究
  12. The coastal erosion feature and morphological evolution at the feiyantan coast are studied from the topography and section depth, together with corresponding dynamics of wave and current

    根據地形和資料,闡述了該岸段流路廢棄后的岸灘侵蝕特徵和地貌變化。
  13. Based on the digital simulation and model analysis, the anomaly characterization of apparent resistivity section obtained by the sounding at different positions, and the relationship between electrode space and exploration depth were summarized

    根據理論模型的數值模擬結果,總結了地質異常體在不同觀方位巷道電視電阻率圖上的異常特徵及電極距與探距離間的關系。
  14. Thirdly, in term of the results of testing and calculation, the displacement and libration, the difference of altitude, the flexibility and strain of crane - beams are all generally analysed, especially the reason why the crane - beams are attaint is lucubrated, and the reasons why the trigging pole is ruptured, the upper wingspan is damaged, the orbital movement, the exceptional incline of colums are open out, which has instructional significances that improve the design of the steel frame of the coke made by dry flameout

    第三,根據檢和計算結果,對鋼框架的位移和振動、框架高差、吊車梁撓度和應變等進行了全的分析,特別對吊車梁系統的損傷原因進行了入分析,揭示了制動桿件裂、上翼緣磨損、軌道竄動、柱異常傾斜等一系列損傷現象的原因,對于改進干熄焦鋼框架的設計有著直接的指導意義。
  15. The development of traditional chinese medicine is greatly compelled by electric measuring of the meridian and acupoints, also it can show the information of pathological changes more deeply and comprehensively, its balance and dialectic standpoint are bright, which is more veracious and practicability

    經絡電信息檢的出現推動了祖國傳統醫學的發展,更入和全地反映人體病變信息,其平衡及辯證觀點鮮明,更具準確性和實用性。本文工作就是根據經絡穴位診法的思想,按照經穴檢的要求研製了經絡信息檢系統。
  16. The usual measuring method, that is, to use the water temperature of 1 meter under water surface to adjust the spinning speed of the sounding device, will result in greater measuring errors. this article put forwards the mathematical model of water temperature with the vertical water temperature that was measured at the deepest site of six sections. after adjusting the sounding device w

    本文依據實的6個泡點處的垂線水溫建立了水溫輔助數學模型,依據該模型即可得到保證回聲儀精度的水溫值,用該水溫值校正回聲儀后,便可得到對應于各起點距處的水值,從而解決了丹江水庫三維模型建立的關鍵問題。
  17. The 3d model needs three parameters, among them, the distance from the dam and the distance from the starting point of the section can be measured directly, and the depth of the water corresponding to the distance from the starting point of the section can be measured by the sounding device. however, because the reservoir is very deep, the measuring error of the water depth is greater

    而建立其三維模型需要三個參量,其中距壩里程、備起點距可直接得,而對應于各起點距的水值因丹江口水庫較,按通常的方法使用回聲儀,即以水下二米處的水溫校正回聲儀的轉速來有較大誤差。
  18. With the continuously expanding of seismic exploration in the basin, it is carried out to tackle key problem of mountainous seismic technology, based on the old data analysis and exploration experience, through implementing a series of measures including observation system design aimed at the target, fine investigation for surface structure, sampled parameters test, well depth design by selecting rock and bed and other acquisition techniques, a series of more mature exploration technique suited for complex mountainous region has been developed and the break through has been made its quality of data acquired field, providing the strong technique support for petroleum exploration in complex mountainous region

    隨著盆地地震勘探的不入,在總結,分析以往資料和勘探經驗的基礎上,在該區進行了山地地震攻關,通過針對目標的觀系統設計,精細的表層結構調查、科學的採集參數試驗、選巖選層的井逐點設計及其他相應的採集技術措施,形成了一系列比較成熟的復雜山地勘探技術,在野外採集資料品質方取得了突破性的進展,為復雜山地的油氣勘探提供了強有力的技術手段。
  19. This research project, based on the existing problems in mathematics curriculum evaluation and the conceptions of mathematics curriculum as the guideline, systematically analyzes the basic characteristics of the developmental evaluation, i. e. multi - dimensional, formative, developmental, understanding and inspiring. drawing on the modern mathematics conceptions, multi - intelligence theory and theories of constructivism, this project systemically illustrated the connotation of the developmental evaluation : the key of evaluation is for application ; the goal is multi - dimensional ; the process is context - dependent ; the outcome is to promote the development. in view of the conceptions of developmental evaluation ( i. e. human - centered whole evaluation ; quality - focused overall evaluation ; participation - stressed autonomous evaluation ; future - faced evaluation ; guiding evaluation and inspiring evaluation ), the components of the developmental evaluation model in the new mathematics curriculum is analyzed in details in this project ( i. e. goal system, subject system and object system ) and the core structure of the developmental evaluation is established ( i. e. evaluation indicator system model )

    本課題研究以數學課程評價的現存問題為著手點,以數學課程理念為目標指向,系統分析了數學新課程發展性評價的多元性、形成性、發展性、理解性、激勵性等基本特徵;以現代數學觀、多元智力理論、建構主義理論以及成功智力理論為理論背景,系統闡述了數學新課程發展性評價之意蘊?評價核心聚焦應用,評價目標指向多元,評價過程依存情境,評價結果歸依發展;以數學新課程發展性評價理念,即以人為本的全體性評價、注重素質的全性評價、注重參與的自主性評價、促進完善的引導性評價、不進取的激勵性評價、向未來的期望性評價為航標,入剖析了數學新課程發展性評價模式的構成成分,即目標系統、主體系統和客體系統,由此構建發展性評價模式的核心圖式?評價指標體系的模式:以數學新課程發展性評價過程為參照,尋求並創設評價準則的設計技術,評價權重的構造技術,評價信息的收集技術,評價結果的分析與處理技術;以數學新課程評價系統內蘊的一般認識論、發生認識論與發展認識論指導評價方法,詳細探討了檔案袋法、表現性評價、自我評價與同伴評定相結合的方法、蘇格拉底式研討評定和驗法在評價中的應用。
  20. This thesis gets forecasting ground settlement of sk3 + 355 section of shenzhen metro da ~ ke running tunnel after it is completed 6 months, also gets forecasting ground settlement of sk3 + 395 section after it is completed 15 months. finally, the model test data are compared with the site measurement data

    本論文通過多個模型試驗的研究,得到了圳地鐵大~科區間里程sk3 + 355在隧道竣工后6個月內地表固結沉降的預值,也得到了sk3 + 395三孔三線隧道施工引起的沉降和隧道竣工后15個月內地表固結沉降的預值。
分享友人